  1. Slide 1: Compact CBS II Product Introduction

    Steinar Riveland, Product Manager Compact CBS II Product Introduction

  2. Slide 2: Project Goal

    Project Goal Compact CBS II Objective Develop a new cartridge improved handling unit for the ABB Cartridge Bell System, with better motion control, better process control and more compact design Deliverables Optimized ABB CBS process solution; cleaning, filling and dosing New drive solution, new con

  3. Slide 3: Project Goal: Customer value

    Project Goal Compact CBS II Customer value Results in minimum time to exchange color (cartridge), keeping the robot available for painting Parallel processing (re-filling cycle and painting cycle) and securing low material waste, precise dosing, possible to customize for each color material, with ti

  4. Slide 4: Product History Cartridge Bell System

    Product History Cartridge Bell System 1997 Project triggered by Toyota in Japan 1997 Joint project Toyota & ABB Japan 1998 First installation Toyota 1999 Car body and plastic fascia projects 2000 First installation in Europe 2001 Toyota Technology Development Price 2001 World wide Commercialization

  5. Slide 5: Product History Cartridge Bell System

    Product History Cartridge Bell System 2003 Cartridge Gun System 2004 Special Vehicle Order 2006 First major EU Automotive installation 2008 Introducing RB951-WSC 2008 First major US Automotive installation 2013 Introducing the Compact CBS II with full servo control and dual DCU for filling and dosin

  6. Slide 6: Customer Values

    Customer Values Compact CBS II Compact Cartridge Bell System (II) This new version of the CBS handling unit is considering the ‘lessons learned’ over the last 15 years since the first CBS system was introduced, in 1998 Most important changes from the last model are related to full servo controlled m

  7. Slide 7: Customer Values (cont...)

    Customer Values Compact CBS II Compact Cartridge Bell System (cont...) Dual Delivery Control Unit (DCU) for precision filling and dosing of paint material. This second DCU replaces the previous gear flow meter on the Delivery Control Liquid (DCL) on the return line DCL Overall compact design, with a

  8. Slide 8: Filling Volume Control

    Filling Volume Control Compact CBS II DLC volume measured during filling cycle – CBS (standard solution 2013) Paint material filling the cartridge with use of line supply pressure, pushing the cartridge piston and DCL out, through the gear flow meter for volume Filling of new material Return of DCL

  9. Slide 9: Filling Volume Control

    Filling Volume Control Compact CBS II DLC volume measured during filling cycle – Compact CBS II (standard solution 2014) The first DCU is used for accurate Filling of dosing of paint during robot painting new material The second DCU is used to accurately measure the return of DCL, securing the refil

  10. Slide 10: Other Solutions

    Other Solutions Prepared for internal charge WB material SAMES Accubell 709 evo The latest solution from SAMES is prefilling a Booster tank during the painting cycle, this is an improvement from previous solution, but even this need to push the paint material with high pressure from the booster tank

  11. Slide 11: ABB Solution

    ABB Solution Prepared for internal charge WB material ABB CBS Parallel processing the cleaning and filling with the paint dosing (robot painting) Designed to fill the actual cartridge, with controlled speed and pressure to prevent any unwanted effect on the WB material Filling and cleaning can be tu

  12. Slide 12: IRB 5310 Overview

    IRB 5310 Compact CBS II Overview Inside the paint booth Outside the booth wall © ABB Month DD, YYYY | Slide 12

  13. Slide 13: IRB 5310 Main mechanical differences

    IRB 5310 Compact CBS II Main mechanical differences Mechanical frame New Compact CBS II is made out of machined cast aluminum The gripper tool Continuing with the same basic design, but with new design of the gripper arm The Integrated Filling Stations (IFS) and utility stations (parking stations) a

  14. Slide 14: IRB 5310 Main differences

    IRB 5310 Compact CBS II Main differences New drive system Axes now use servo motors for all motion and for DCU position and speed control Servo controlled vertical axis Increased reliability and safety. Eliminating a possible point of failure with the previous air positioning vertical axis © ABB Mon

  15. Slide 15: IRB 5310 Main differences

    IRB 5310 Compact CBS II Main differences Dual DCU system Faster and more precise filling of cartridge Prepared for both controlling filling pressure or controlling time-to-fill and adaptable to different paint materials Because there are two DCUs, they will swap roles and one will be «empty» and the

  16. Slide 16: IRB 5310 Main control differences

    IRB 5310 Compact CBS II Main control differences Servo motor vertical axis Increased reliability and safety, by eliminating issues with pneumatic solution The servo motor is integrated into the run chain circuit of the IRC5P controller © ABB Month DD, YYYY | Slide 16

  17. Slide 17: IRB 5310 Main process control differences

    IRB 5310 Compact CBS II Main process control differences Dual DCU system One of the DCU’s is acting as measuring device providing more accurate filling (less paint loss) This closed volume of DCL eliminates the need for a DCL distribution system. Volume inside the two pairs of DCU & Cartridge can be

  18. Slide 18: IRB 5310 Purging system

    IRB 5310 Compact CBS II Purging system Ex-p design The basic unit is designed for Ex-p (protected with use of controlled overpressure) The Compact CBS II handling unit need to be installed with an overpressure supplied to the integrated control electronics This is achieved either with a fully certif

  19. Slide 19: Compact CBS II Integrated Filling Stations (IFS)

    Compact CBS II Integrated Filling Stations (IFS) 1 x IFS and 1 x Color change stack Requires 2 parking stations Most common configuration 2 x IFS and 2 x Color change stacks Requires 3 parking stations Can be used to reduce cycle time, if the filling and cleaning time is longer than the painting tim

  20. Slide 20: Compact CBS II: Software

    Compact CBS II: Software Paint TPU, RobView and RobotWare Paint (incl IPS) Software and control New handling for motorized axes with resolvers Other material change sequences due to new dual DCU system RobView 5 - Changes in graphics and buttons if connecting to new Compact CBS II P-TPU - Changes in

  21. Slide 21: Overview CBS integration with Paint robot

    Overview CBS integration with Paint robot The main benefits with CBS would be the possibility to utilize high voltage internal charge in combination with conductive paint material like most WB paint materials Parallel cleaning and loading of next paint material, during painting, will reduce the over

  22. Slide 22: Power and productivity for a better world

    Power and productivity for a better world™