Ssr Mining Inc. · NASDAQ:SSRM
Ssr Mining — Silver Standard Resources — Investor Presentation (November 2015)
40 slides from Ssr Mining's investor presentation, Nov 19, 2015
Slide 1: Right Company, Right Time
RIGHT COMPANY, RIGHT TIME November 2015 Corporate Presentation SSRI:NDAQ | SSO: TSX 1
Slide 2: Cautionary Notes
Cautionary Notes Cautionary Note Regarding Forward-Looking Statements This presentation contains “forward-looking information” within the meaning of Canadian securities laws and “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 (collectively
Slide 3: Why Silver Standard?
Why Silver Standard? ASSETS CAPITAL MANAGEMENT Free cash flow $200M in cash Experienced team Two large mines $108M in marketable In-country expertise securities Focused portfolio Deliver to plan Strong balance sheet Strong operating performance & free cash flow SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX T
Slide 4: On Track to Meet Improved 2015 Guidance
On Track to Meet Improved 2015 Guidance Delivered strong production at lower costs YTD Marigold: 41Koz gold at $719/oz cash cost in Q3 Pirquitas: 2.6Moz silver at $11.02/oz cash cost in Q3 $67.2M of cash generated by operating activities YTD (before taxes & interest) Cash balance increased
Slide 5: Strong Production and Cost Profile
Strong Production and Cost Profile 8.0 $16 $14.34 $14.29 6.9 6.8 5.6Moz Silver Equivalent Cash Costs ($/oz) 6.0 Silver Equivalent Production (Moz) 6.0 5.6 $12 $12.36 $10.78 5.1 $10.32 Silver Eq. Production in 3Q15 $9.57 $9.74 4.0 $8 3.5 1.9 2.0 $4 $10.32/oz 0.0 $0 Silver Eq. Cash Costs in 3Q15 Q1 Q2
Slide 6: Marigold: Established Gold Mine
MARIGOLD ESTABLISHED GOLD MINE SSRI:NDAQ | SSO: TSX 6
Slide 7: Improved Operating and Political Profile
Improved Operating and Political Profile Open pit, run-of-mine heap leach gold operation Continuous production since 1988 Strong safety and environmental practices Twin Creeks Goldstrike MARIGOLD Maverick Springs Phoenix Excellent infrastructure Cortez Carlin Trend Probable Mineral Reserve
Slide 8: Invested $160M in 2012 and 2013
Invested $160M in 2012 and 2013 Shovel Capacity Hauling Capacity Haul Truck Maintenance (Cubic Yards) (Tonnes) (Hours) 150 5,000 20 Maintain Wash 18 Trucks 100 3 Shovels 12 Trucks 2,500 2 Shovels 10 50 0 0 0 2012 2014 2012 2014 2012 2014 Operational Excellence for increased efficiency and lower cost
Slide 9: Operational Excellence: Long-term Cost Savings
Operational Excellence: Long-term Cost Savings $1.92 Total cost per tonne mined $1.74 $1.70 $1.65 $1.61 $1.62 $1.57 $1.48 $1.50 2013 Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 LOM Savings of 1₵ cost per tonne mined = $750,000 annually Notes: Annual savings of $750,000 based on assumptio
Slide 10: Improved 2015 Gold Guidance
Improved 2015 Gold Guidance Gold Production (Koz) Cash Cost per Ounce of Capital ($M) Gold Sold ($/oz) $40 195 - 205 200 $900 $838 $700 - $750 $11 $30 150 $25 130 $600 $20 100 $300 $25 $10 50 $13 $0 0 $0 2014 2015 2014 2015 2014 2015 Guidance Guidance Guidance Capital Capitalized Stripping Improved
Slide 11: Marigold Going Forward
Marigold Going Forward Operational excellence to drive costs down Assay Program increases 2015 gold production by 12% Add oxide Mineral Reserves through drilling Explore depth for sulphide mineralization Focused on increasing reserves and margin SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 11
Slide 12: Assay Program – Increases Ore Zones
Assay Program – Increases Ore Zones Pit Outline as of October 2015 Mackay Phase 3 Pit Outline Mineralized Ore as at December 2014 Additional Ore Tonnage 75 meters and Ounces W E Increases tonnage 21%; Increases ounces 12% Notes: See news release dated July 6, 2015 for additional information on the M
Slide 13: Resource Discovery and Reserve Conversion
Resource Discovery and Reserve Conversion Three new higher-grade mineralized HideOut 8SX Valmy and Mud Pits centers discovered in last 12 months Selected drill results: A’ 8D 8SX: 91.4 meters at 2.48 g/t Au 8D: 164.6 meters at 1.70 g/t Au 1 km A N HideOut: 76.2 meters at 2.47 g/t Au Reserv
Slide 14: Pirquitas: Large Open-Pit Silver Mine
PIRQUITAS LARGE OPEN-PIT SILVER MINE SSRI:NDAQ | SSO: TSX 14
Slide 15: Proven Capability and Delivery
Proven Capability and Delivery 100% owned and operated silver and zinc mine 2010: Invested capital 2011/12: Delivered predictable production 2013: Improved cost structure, completed push back Pirquitas Mine Jujuy, Argentina 2014: Repositioned on cost curve, record annual production Diablil
Slide 16: Improved 2015 Silver Guidance
Improved 2015 Silver Guidance Silver Production (Moz) Cash Cost per Ounce Capital ($M) of Silver Sold ($/oz) 12.0 9.5 - 10.5 $12.08 $10.50 - $11.50 $20 8.7 $10 $11 8.0 $10 4.0 $5 $10 $10 $0 0.0 $0 2014 2015 2014 2015 2014 2015 Guidance Guidance Guidance Capital Capitalized Stripping Increased produc
Slide 17: Exploration Emphasis: Pirquitas Underground
Exploration Emphasis: Pirquitas Underground Pirquitas Underground 2015 drill program complete. Positive drill results 3.16 meters at 1,436 g/t silver Cortaderas San Miguel Open Pit 1.93 meters at 1,890 g/t silver Chocaya & Oploca 0.83 meters at 2,670 g/t silver Conceptual study underway
Slide 18: Exploration Emphasis: Chinchillas Project
Exploration Emphasis: Chinchillas Project Agreement to evaluate the Chinchillas project (Oct 2015) Silver-zinc-lead deposit located 30 km from Pirquitas 5,000 meters infill drilling planned for Q4 Initial geotechnical and environmental studies underway Potential to extend Pirquitas operating
Slide 19: Properties, Projects and Production
Properties, Projects and Production 10 1 8 7 7. Candelaria 11 3 9 1. Marigold 8. Maverick Springs 5. Diablillos 3. Pitarrilla 9. San Marcial 2. Pirquitas 6. Berenguela 4 4. San Luis 6 10. Sunrise Lake 2 5 11. Parral + $570M SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 19
Slide 20: San Luis: Dual Option to Value
San Luis: Dual Option to Value Ancash Region, Peru High grade mineralization N with Mineral Resources of: 8.9M oz Ag at 595.5 g/t Ecash Community 0.35M oz Au at 25.2 g/t Already secured EIA Ayelén Vein Feasibility study Going forward San Simon Vein Pursuing community agreements Bonit
Slide 21: Pitarrilla: Large Option
Pitarrilla: Large Option Parral Mining District Open pit project Chihuahua Conventional flotation and leaching Pitarrilla Project Durango 695 Moz silver Mineral Resources Mexico (Measured and Indicated) Evaluating optimization of mine plan Continued exploration of land position Water mor
Slide 22: Why Silver Standard in 2015
Why Silver Standard in 2015 Management team Corporate level that delivers free cash flow Focus on operational Strong balance excellence sheet Cost discipline Strategy for growth SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 22
Slide 23: Authentic
(2) Authentic SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 23
Slide 24: Mineral Reserves
Mineral Reserves (as at December 31, 2014) Mineral Reserves Location Tonnes Silver Gold Zinc Silver Gold millions g/t g/t % million oz million oz Proven Mineral Reserves San Luis Peru 0.06 604.5 28.3 1.1 0.05 Total 1.1 0.05 Probable Mineral Reserves Pirquitas Argentina 5.37 220.10 0.47 38.0 Pirquita
Slide 25: Mineral Resources: Measured and Indicated
Mineral Resources: Measured and Indicated (as at December 31, 2014) Mineral Resources Location Tonnes Silver Gold Lead Zinc Copper Silver Gold millions g/t g/t % % % million oz million oz Measured Mineral Resources (Inclusive of Proven Mineral Reserves) Pitarrilla Mexico 20.30 95.40 62.3 San Luis Pe
Slide 26: Mineral Resources: Inferred
Mineral Resources: Inferred (as at December 31, 2014) Mineral Resources Location Tonnes Silver Gold Lead Zinc Copper Silver Gold millions g/t g/t % % % million oz million oz Inferred Mineral Resources Pirquitas UG Argentina 2.85 174.0 3.61 15.9 Marigold U.S. 18.20 0.44 0.26 Pitarrilla Mexico 22.10 6
Slide 27: Reserves & Resources: Notes to Tables
Reserves & Resources: Notes to Tables All estimates set forth in the Mineral Reserves and Mineral Resources tables have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). The estimates of Mineral Reserves and Mineral Resources fo
Slide 28: HideOut: New High Grade Mineralized Area
HideOut: New High Grade Mineralized Area Notes: See news release dated September 18, 2015 for additional details on the HideOut area at the Marigold mine. See also “Cautionary Notes” in this presentation. SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 28
Slide 29: View NW of 8 South and HideOut Centers
View NW of 8 South and HideOut Centers Drillhole 8S pit Backfill 8SX A Old Leach A’ Pads HideOut Rock Ultimate Stockpiles Pit Shell Structural Trend Notes: See news releases dated July 6, 2015 and September 18, 2015 for drillhole highlights and reference data for the Marigold exploration drill progr
Slide 30: Illustrative Cross Section through HideOut Center
Illustrative Cross Section through HideOut Center W E 485590 486090 Conceptual Pit Shell 1600 Rock Stockpile 61m at 0.1 g/t 1500 91m inter-burden 76m at 2.5 g/t 1400 Pre-Mining Gold (g/t) Surface <0.06 0.06 - 0.6 0.6 – 1.2 Illustrative Gold 485840 > 1.2 1300 Grade Model 100 meters Notes: See news re
Slide 31: Valmy Property Location
Valmy Property Location Notes: See news release dated August 11, 2015 announcing the acquisition of the Valmy Property. See also “Cautionary Notes” in this presentation. SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 31
Slide 32: Pirquitas: Actively Managing Costs Down for Long Term
Pirquitas: Actively Managing Costs Down for Long Term $19.70 Cash costs per payable $16.88 ounce of silver sold $12.87 $12.08 $10.50 - $11.50 $11.25 $11.02 $9.45 2011 2012 2013 2014 Q1 2015 Q2 2015 Q3 2015 Guidance 2015 Note: Cash costs are a non-GAAP financial measure. Please see "Cautionary Note R
Slide 33: Chinchillas Project Location
Chinchillas Project Location Notes: See news release dated October 1, 2015 announcing the agreement to evaluate the Chinchillas project. See also “Cautionary Notes” in this presentation. SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 33
Slide 34: San Luis Project
San Luis Project San Luis Feasibility Study Results (June 2010) 3.5-year life: Underground mine Avg. annual 1.9M oz Ag production: 78,000 oz Au Cash cost: $313 / oz Au Resources (M+I): 9.0M oz Ag at 578.1 g/t 0.35M oz Au at 22.4 g/t Capital: $90 -$100M Mill throughput: 400 tpd NPV: $39
Slide 35: Increased Financial Strength
Increased Financial Strength $383M $265M Cash, Marketable Securities and Credit Facility Convertible Notes Source: $383 million includes $200 million of Cash and Cash Equivalents, $108 million of marketable securities and $75 million of undrawn senior secured credit facility. Cash and marketable sec
Slide 36: Ownership Summary
Ownership Summary Top 10 Shareholdes % of Shares Outstanding Holdings by Investor Class Van Eck 6.9% Kopernik Global Investors 3.8% Investec Asset Management 2.4% Institutional Wells Capital Management 2.2% Global X Management 2.1% 45% Retail and Other Sun Valley Gold 2.1% 55% Frank Russell Thrust 1
Slide 37: Strong Technical and Commercial Experience
Strong Technical and Commercial Experience Board of Directors Management Team Peter Tomsett Paul Benson Chairman President, CEO and Director Michael Anglin Gregory Martin SVP and CFO Gustavo Herrero Alan Pangbourne Beverlee Park SVP, Operations Richard Paterson Jonathan Gilligan VP, Technical and Pr
Slide 38: Notes
Notes SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 38
Slide 39: Notes
Notes SSRI:NASDAQ SSRI:NDAQ ||SSO: SSO:TSX TSX 39
Slide 40: Corporate Presentation
CORPORATE PRESENTATION SSRI:NDAQ | SSO: TSX 40
Silver Standard Resources — Investor Presentation (November 2015) on 6ix