Jsw Energy Limited · NSE:JSWENERGY

Jsw Energy — Q4 FY24 Earnings Presentation

83 slides from Jsw Energy's earnings presentation, May 7, 2024

  1. Slide 1: Results presentation cover letter to exchanges

    Energy Limited Regd. Office : JSW Centre Bandra Kurla Complex Bandra (East), Mumbai - 400 051 CIN: L74999MH1994PLC077041 Phone: 022 – 4286 1000 Fax: 022 – 4286 3000 Website: www.jsw.in SEC / JSWEL 7th May, 2024 BSE Limited National Stock Exchange of India Limited Phiroze Jeejeebhoy Towers “Exchange

  2. Slide 2: Q4 and FY24 Results Presentation

    Q4 and FY24 Results Presentation May 7, 2024

  3. Slide 3: Forward Looking and Cautionary Statement

    Forward Looking and Cautionary Statement This presentation has been prepared by JSW Energy Limited (the “Company”) based upon information available in the public domain solely for information purposes without regard to any specific objectives, financial situations or informational needs of any parti

  4. Slide 4: Delivering Sustainable Growth

    Delivering Sustainable Growth 2.7 GW of Capacity Addition in FY23 & FY24 (GW) 26% CAGR 7,245 6,564 4,531 4,541 4,559 4,559 4,559 1,730 FY10 FY18 FY19 FY20 FY21 FY22 FY23 FY24 Highest ever EBITDA and 2nd Highest PAT Highest ever EBITDA (₹ Cr) 2nd Highest PAT (₹ Cr) 1,729 1,723 5,837 FY10 FY11 FY12 FY

  5. Slide 5: FY2024 – Key Achievements

    FY2024 – Key Achievements Qualified Institutional Placement Raised ₹ 5,000 Cr Growth Capital through QIP from marquee institutional investors to accelerate growth Built Robust Project Pipeline Won RE bids of 3.4 GW; 36% increase in locked-in capacity to 13.2 GW Fastest Revival of Stalled Thermal Pow

  6. Slide 6: Agenda

    Agenda Q4 FY24 Highlights Operational & Financial Performance Segment Wise Performance Safety & Sustainability Business Environment Appendix JSW Energy Q4 FY24 Results Presentation Vijayanagar 225MW Solar Power Plant 5

  7. Slide 7: Q4 FY24 Highlights (1/2)

    Q4 FY24 Highlights (1/2) • Net Generation: Up by 26% YoY at 6.4 BUs driven by contribution from acquired and greenfield RE capacity additions and higher thermal generation. • Total RE generation is up by 124% YoY at 1.3 Bus; Total thermal generation is up by 14% YoY at 5.1 BUs Operational • Long Ter

  8. Slide 8: Q4 FY24 Highlights (2/2)

    Q4 FY24 Highlights (2/2) • EBITDA of ₹ 1,292Cr surged 47% YoY resulting in 29% YoY increase in PAT to ₹351 Cr. Cash PAT during the quarter increased 17% YoY to ₹686 Cr • Receivables (excl. acquired RE portfolio) on DSO basis stood at 54 days; one of the lowest in recent times Consolidated Financial

  9. Slide 9: Operational & Financial Performance

    Operational & Financial Performance Ratnagiri Power Plant

  10. Slide 10: Consolidated Performance

    Consolidated Performance Net Generation (MUs) Operational Highlights Total Revenue (₹ Cr) Q4 FY24 26% 27% 3% 10% 27,862 • Net Generation: Up by 26% YoY at 6.4 BUs driven by 6,397 2,806 2,879 11,941 10,867 contribution from acquired RE portfolio and greenfield 5,067 21,866 RE capacity additions, and

  11. Slide 11: EBITDA Bridge

    EBITDA Bridge Q4 FY24 Particulars in ₹ Cr Thermal Solar/Wind +47% YoY JSW Energy Q4 FY24 Results Presentation 10

  12. Slide 12: Consolidated Financial Results

    Consolidated Financial Results FY24 FY23 Particulars in ₹ Crore Q4 FY24 Q4 FY23 11,941 10,867 Total Revenue 2,879 2,806 5,837 3,817 EBITDA 1,292 881 49% 35% EBITDA Margin(%) 45% 31% 1,633 1,169 Depreciation 427 291 2,053 844 Finance Cost 533 233 2,150 1,924 Profit Before Tax 332 357 1,723 1,478 Prof

  13. Slide 13: Net Debt Movement

    Net Debt Movement Particulars in ₹ Cr Capital Work- in-Progress (CWIP) Operational Projects 2,759 15 419 180 1,824 26,286 26,636 7,890 9,841 ND/EBITDA# 18,396 (excl. CWIP) at 2.9x 16,795 Net Debt as on New Debt Taken Forex restatement Repayment Movement in short Change in Cash Net Debt as on Dec 31,

  14. Slide 14: Robust Growth Pipeline

    Robust Growth Pipeline Generation (GW) Energy Storage (GWh) 19.44 20.00 Under-construction 6.20 3.40 0.24 0.30 9.84 LoA/LoI 77.1 0.72 0.21 0.74 7.29 0.35 received 40.0 2.4 3.4 2.7 1.0 PCKL SECI 2030 Target Locked-in with states PSP MoU MoU with JSW Steel Ind-Barath SECI X Operational SECI XII Total

  15. Slide 15: Superior Financial Risk Profile

    Superior Financial Risk Profile Net Debt (₹ Cr) Net Worth (₹ Cr)* & Cash Returns (%) 26,286 26,636 19,877 20,976 20,832 24,260 18,392 18,629 19,111 22,180 22,904 20% 21% 20% 20% 18% 18% 9,840 13,446 14,177 14,859 15,336 15,501 14,061 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Dec-22 Mar-23 Jun-23 Sep

  16. Slide 16: Healthy Trade Receivables

    Healthy Trade Receivables Trade Receivables* (₹ Cr ) Operational Highlights • Receivables (excl. acquired RE Portfolio) decreased by 21% 21% YoY and receivables in DSO terms also improved YoY to 54 1,799 days 1,429 • All plants placed favourably in States’ Merit Order Dispatch. o Further, Hydro plan

  17. Slide 17: Segment Wise Performance

    Segment Wise Performance Vijayanagar Thermal Power Plant- Control Room

  18. Slide 18: Thermal Assets | Q4 FY24 Highlights

    Thermal Assets | Q4 FY24 Highlights Overview Offtaker Profile Operational Assets Open, Rajasthan, 34% 28% Total Thermal 3,858 Capacity 3,858* MW MW MSDECL, 8% Ratnagiri Barmer Vijayanagar Ind - Barath Group Captive, 30% Installed Capacity 1,200 MW 1,080 MW 860 MW 700 MW Unit 1 (350 MW) operational O

  19. Slide 19: Thermal Assets | Q4 FY24 Highlights (2/2)

    Thermal Assets| Q4 FY24 Highlights (2/2) Net Generation (MUs) Thermal : PLF – long term Operational Highlights 14% 17% 94% 90% • Total Net Generation up 14% YoY at 5.1 BUs, 85% 86% 5,088 18,526 79% 82% 76% driven by higher LT generation across all plants 4,482 72% 15,819 and increased ST volumes Sho

  20. Slide 20: Renewable Assets | Presence across all modes of generation

    Renewable Assets | Presence across all modes of generation Total 9,382 MW Operational Assets – 3,782 MW Under Construction – 2,200 MW Pipeline – 3,400 MW Expected to be operational by CY 2024 4,676 3,075 1,631 MW MW MW Solar MW Wind Solar Hydro SJVN 700 Offtaker Profile Wind SECI XIII 700 Pipeline,

  21. Slide 21: Renewable Assets | Q4 FY24 Highlights

    Renewable Assets |Q4 FY24 Highlights Installed Green Capacity (MW) Net Generation (MUs) 124% 54% Operational Highlights 3,737 9,336 • Net generation during Q4FY24 1,309 3,406 increased by 124% YoY and 54% YoY 6,047 Short Term during FY24 driven by contribution 585 100% 99% from acquired and greenfie

  22. Slide 22: Safety & Sustainability

    Safety & Sustainability JSW Energy, Barmer

  23. Slide 23: Continued Focus on Health & Safety Excellence

    Continued Focus on Health & Safety Excellence Awards & LTIFR of 0.15 considering all operational plants of JSW Energy for FY24 Recognitions Contractor Safety Management All contractors of major JSW Plants evaluated under the JSW CARES program 85% contractors have achieved 3 Star rating or more in th

  24. Slide 24: Sustainability: Framework and Policies

    Sustainability: Framework and Policies 17 Focus Areas with 2030 Targets from 2020 as Base Year Governance & Oversight by Sustainability Committee Climate Change: Renewable Power: Biodiversity: Committed to being carbon Enhance the renewable power No Net Loss for Biodiversity Independent Mr. Sunil Go

  25. Slide 25: Sustainability: Targets and Strategy

    Sustainability: Targets and Strategy FY20 Improvement FY30 FY24 Strategic Initiatives and Approach SD Targets Actuals (FY20 to FY30) Targets Actuals  TCFD – Identified associated short tem , medium term and Long term risks  GHG Emissions  Supply Chain Sustainability – development of Digital Platf

  26. Slide 26: Sustainability: Q4 FY24 Performance

    Sustainability: Q4 FY24 Performance Key Highlights Performance • Increased share of renewable energy for deep decarbonisation Ash Utilisation (%) Climate • Addition of 374 MW (FY24) renewable portfolio mix to reduce the GHG emission, Change a step towards our “ Net Zero” commitment by 2050 or earlie

  27. Slide 27: Sustainability: Empowering Our Communities

    Sustainability: Empowering Our Communities Ratanagiri JSW Energy Q4 FY24 Results Presentation 26

  28. Slide 28: Sustainability: Empowering Our Communities

    Sustainability: Empowering Our Communities Health and Nutrition Sports Promotion • 80,000+ people benefitted • 4,500+ lives touched • 11,000 people in 16 remote villages • 94 trainees supported under Project reached through a Mobile Health Unit in Shikhar, 115 participants in competitions Barmer • 3

  29. Slide 29: Investor Relations Contact

    Investor Relations Contact: ir.jswenergy@jsw.in ESG Data Profile: Link JSW Energy, Ratnagiri 28

  30. Slide 30: Business Environment

    Business Environment JSW Barmer

  31. Slide 31: Indian Economy

    Indian Economy Real GDP Growth (%) 22.6 12.8 9.9 8.2 8.1 8.4 5.5 4.5 5.5 4.3 6.2 3.3 2.9 1.8 3.3 • India continues to see resilient growth o Real GDP growth for quarter Dec-23 stood at 8.4% YoY -5.8 o PMI: Manufacturing (Mar-24: 59.1) and Services (Mar- -23.1 24: 60.3) o GST collection for Mar’24 wi

  32. Slide 32: Power Demand increased by 7.5% in FY24

    Power Demand increased by 7.5% in FY24 Power Demand in BUs Power Demand Growth (% YoY) 165 40% • All India demand during Q4 FY24 at 402 BUs 155 30% increased by 7.4% YoY because of heating 145 139 BUs 135 20% requirements in Jan/Feb due to cold waves 125 10% 8% 115 in the North followed by cooling 1

  33. Slide 33: Overall Generation Increased by 7.1% YoY in FY24

    Overall Generation Increased by 7.1% YoY in FY24 Power Generation in BUs Power Generation Growth (% YoY) 30% 165 155 148 BUs 20% 145 • Overall generation during Q4 FY24 at 135 8% 10% 430 BUs increased by 7.3% YoY. For 125 115 0% FY24 generation grew at 7.1% YoY. 105 95 -10% Apr May Jun Jul Aug Sep O

  34. Slide 34: India's installed capacity stands at 442 GW

    India’s installed capacity stands at 442 GW as on Mar-24 Sector-wise Installed Capacity Segment-wise Installed Capacity Renewable Capacity Breakdown 144 2% 16 11% 24% 24% State Thermal 46 Other RES Nuclear Wind Private 442 GW 442 GW 33% Solar Hydro 55% 82 Central Renewables 52% Overall segment wise

  35. Slide 35: Merchant Power – Day Ahead Market

    Merchant Power – Day Ahead Market Monthly Average Merchant Tariff (₹/unit) Linear Trend - Monthly Avg Price (₹/kwh) 11.0 FY24 12 10 9.0 • Day Ahead Market (DAM) prices were down 8 7.0 by 12% YoY as the average tariff recorded for 6 5.0 FY24 was ₹ 5.24/KWh vs ₹5.94/KWh in the 4 ₹ 3.9 3.0 correspondin

  36. Slide 36: Appendix

    Appendix Barmer Thermal Power Plant

  37. Slide 37: Operational Performance – Net Generation

    Operational Performance – Net Generation Net Generation (MUs) Capacity Q4 FY24 Q4 FY23 Change YoY FY24 FY23 Change YoY Location (Current Capacity) % % % LT 91% 1,668 1,506 11% 6,491 5,123 27% Ratnagiri (1,200 MW) Total 100% 2,097 1,752 20% 7,850 5,713 37% Barmer (1,080 MW) LT 100% 1,754 1,730 1% 6,3

  38. Slide 38: Operational Performance – PLF

    Operational Performance – PLF PLF/CUF Capacity Q4 FY24 Q4 FY23 FY24 FY23 Location (Current Capacity) % % % % % LT 91% 76 (*90) 71 (*98) 74 (*93) 60 (*87) Ratnagiri (1,200 MW) Total 100% 87 (*100) 74 (*98) 81 (*98) 59 (*84) Barmer (1,080 MW) LT 100% 83 (*87) 82 (*87) 75 (*78) 77 (*80) LT 37% 99 (*100

  39. Slide 39: Entity-wise Financial Results

    Entity-wise Financial Results Entity-wise Revenue from Operations Particulars in ₹ Crore Q4 FY24 Q4 FY23 FY24 FY23 Standalone 1,236 1,647 5,129 5,739 JSW Energy (Barmer) 809 748 2,880 3,026 Ind-Barath 123 NA 127 NA JSW Hydro Energy 171 186 1,370 1,328 Acquired RE Portfolio 294 4 1,574 4 JSW Renewabl

  40. Slide 40: Cash Returns on Adjusted Net Worth

    Cash Returns on Adjusted Net Worth ₹ Cr (Unless mentioned otherwise) Quarter ended Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Reported PAT 560 466 180 272 290 850 231 351 Add: Depreciation 289 294 295 291 398 409 400 427 Add/(less): Deferred Taxes 84 42 14 24 55 89 (4) (92) (Less): Divi

  41. Slide 41: Finance Cost & PAT Movement

    Finance Cost & PAT Movement Finance Cost (YoY; ₹ Cr) Profit After Tax (YoY; ₹ Cr) JSW Energy Q4 FY24 Results Presentation 40

  42. Slide 42: JSW Energy – Presence Across the Value Chain

    JSW Energy – Presence Across the Value Chain Well placed to achieve 10 GW of generation capacity ahead of stated timeline of 2025 with foray into New Age Businesses Power Generation Energy Storage Energy Products & Services 3.4 GWh of locked in capacity Solar Module & Green H2 Wind, Thermal, Green H

  43. Slide 43: Developed a Pan India Footprint of Diverse Asset Base

    Developed a Pan India Footprint of Diverse Asset Base Operational Capacity by CY 24 (9,840 MW) Punjab Himachal Pradesh Wind Hydro 50 MW 1,631 MW Solar BESS Rajasthan Madhya Pradesh Thermal PSP 258 MW 1,080 MW 30 MW Green Hydrogen 1,000 MWh Gujarat Odisha 78 MW 700 MW Maharashtra Telangana 492 MW 1,2

  44. Slide 44: Well Diversified Portfolio – Focused on Maximising Cash Returns

    Well Diversified Portfolio – Focused on Maximising Cash Returns Capacity Breakdown Diversified Offtakers Generation 13,240 MW PPA to be Group signed *, Captive, Pipeline 26% 16% Installed 7,290^ MW 3,400 MW 26% Solar 2,400 MW Open Installed Wind 1,000 MW Thermal 3,508 MW Current Exposure capacity –

  45. Slide 45: JSW Energy Company Overview – Corporate Structure

    JSW Energy Company Overview – Corporate Structure Ratnagiri – 1,200 MW JSW Energy Limited Vijayanagar – 860 MW Hydro Entities Nandyal – 18 MW 13,240 MW Solar/Wind Entities Solar – 10MW Products & Services Total – 2,088 MW JSW Neo Energy * JSWEBL – 1,080 MW 9,372 MW Ind-Barath – 700 MW Energy Generat

  46. Slide 46: JSW Neo - Acquired RE Portfolio

    JSW Neo - Acquired RE Portfolio Net Generation (MUs) PLF Wind Solar Operational Highlights 594 613 3,337 • Net generation increased 3% YoY in 2,980 Q4 FY24 driven by higher machine 208 199 756 721 Solar availability in wind, partly offset by Wind lower solar radiation 414 2,581 386 2,259 • For FY24

  47. Slide 47: Acquired RE – FY24 Performance Improvement On Track

    Acquired RE – FY24 Performance Improvement On Track Wind Generation (MUs) 36 Wind Machine Availability (%) 302 2,581 3 9 4 +900 bps 96.9% +710 bps 2,259 96.1% 87.9% 89.0% 335 MUs increased due to focused interventions FY 2023 MA Benefit GA Loss Maniyachi Cyclone Wind FY 2024 Q4 FY23 Q4 FY24 FY2023 F

  48. Slide 48: Receivables Cycle Improving

    Receivables Cycle Improving Strong collection in Acquired RE Portfolio’s Receivables* Particulars in ₹ Cr 797 50% YoY improvement 403 399 Mar-23 Dec-23 Mar-24 Focused O&M Interventions leading to strong billing/collection growth 158% 145% Strong generation and billing 97% 106% growth Continued focus

  49. Slide 49: JSW Neo - Hydro Q4 FY24 Highlights

    JSW Neo - Hydro Q4 FY24 Highlights Net Generation (MUs) Hydro : PAF and PLF 12% 8% Operational Highlights 5,595 95% 92% 4,913 104% 101% 403 • Net generation at Hydro Assets 369 Short Term (Karcham and Baspa) for 4QFY24 was 98% 48% 98% Long 42% 100% 100% 5,510 down 8% YoY and down 12% YoY for 4,831 T

  50. Slide 50: Under Construction Projects

    Under Construction Projects JSW SECI X JSW Energy Q4 FY24 Results Presentation 49

  51. Slide 51: JSW Neo - Under construction Wind Power Projects – 2.0 GW

    JSW Neo- Under construction Wind Power Projects – 2.0 GW Wind Projects (SECI IX,X, XII and Group Captive)  SECI IX (810MW) : 92 MW Commisioned  SECI X (454 MW) : 248 MW Commisioned  Approx 2 GW is under construction and to be commissioned by CY24 JSW Energy Q4 FY24 Results Presentation 50

  52. Slide 52: JSW Neo - Kutehr Hydro Power Plant – 240 MW

    JSW Neo - Kutehr Hydro Power Plant – 240 MW Barrage & Intake Power-House works • Barrage concreting completed 89% • Unit 1 - Boxing up of unit-1 in progress • Unit 2 – Erection of turbine in progress • Intake 1&2 concreting completed • Unit 3 – Generator barrel concreting in Tunneling & Concreting p

  53. Slide 53: JSW Energy - Ind-Barath Unit 2 (350 MW)

    JSW Energy - Ind-Barath Unit 2 (350 MW) Revival works in Progress Unit 1 (350 MW) Unit 2 (350 MW) • Synchronised with grid on 13th Jan 24 • Turbine box up work completed • Boiler steam blowing preparation under progress • Generator rotor thread in completed • Switchgear commissioning in progress JSW

  54. Slide 54: Independent Auditor's Report – Standalone

    Deloitte Chartered Accountants One International Center Tower 3, 27th-32nd Floor Haskins & Sells LLP Senapati Bapat Marg Elphinstone Road (West) Mumbai-400 013 Maharashtra, India Tel : +91226185 4000 Fax: +91 22 6185 4101 INDEPENDENT AUDITOR'S REPORT ON AUDIT OF ANNUAL STANDALONE FINANCIAL RES ULTS

  55. Slide 55: Independent Auditor's Report – Standalone (basis for opinion)

    Deloitte Haskins & Sells LLP Basis for Opinion on the Audited Standalone Financial Results for the year ended March 31, 2024 We conducted our audit in accordance with the Standards on Auditing ("SAs") specified under Section 143(10) of the Companies Act, 2013 ("the Act"). Our responsibilities under

  56. Slide 56: Independent Auditor's Report – Standalone (auditor responsibilities)

    Deloitte Haskins & Sells LLP As part of an audit in accordance with SAs, we exercise professional judgment and maintain professional skepticism throughout the audit. We also: • Identify and assess the risks of material misstatement of the Annual Standalone Financial Results, whether due to fraud or

  57. Slide 57: Independent Auditor's Report – Standalone (review)

    Deloitte Hask ins & Sells LLP We also provide those charged with governance with a statement that we have complied with relevant ethical requirements regarding independence, and to communicate with them all relationships and other matters that may reasonably be thought to bear on our independence, a

  58. Slide 58: Statement of Standalone Financial Results

    ~ ENERGY LIMITED Registered Office : JSW Centre, Sandra Kurla Complex, Sandra (E ast), Mumbai-400051 CIN : L74999MH1994PLC077041 Statement of Standalone Financial Results for the Quarter and Year Ended March 31 , 2024 <I' crore Quarter Ended Year Ended Sr. Particulars 31 .03 .2024 31.12.2023 31.03.2

  59. Slide 59: Standalone Statement of Assets and Liabilities

    Standalone Statement of Assets and Liabilities ~ Cro re As at Particulars 31.03.2024 31 .03.2023 Audited Audited A. ASSETS 1. Non-current assets: (a) Property, plant and equipm ent 3,509.64 3,706.42 (b) Capital work-in-progress 17.56 15.53 (c) Other Intangible assets 1.71 2.21 (d) Other Intangible a

  60. Slide 60: Standalone Statement of Cash Flows

    Standalone Statement of Cash Flows For the year ended Particula rs 31.03.2024 31.03.2023 Aud ited Audited A CASH FLOW FROM OPERATING ACTIVITIES Profit before tax 1,181.31 1,029.61 Adjusted fo r: Depreciation and amortisation expense 269.54 317.42 Interest income earned on financial assets that are n

  61. Slide 61: Additional information pursuant to Regulation 52(4)

    Additional information pursuant to Regulation 52(4) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations 2015 as amended · As at/ As at/ Sr. Particulars Quarter Ended Year Ended No. 31.03.2024 31.12.2023 31.03.2023 31.03.2024 31 .03.2023 Debt-Equity

  62. Slide 62: Independent Auditor's Report – Consolidated

    Chartered Accountants Deloitte Lotus Corporate Park 1st Floor, Wing A-G Haskins & Sells LLP CTS No. 185/A,Jay Coach Off Western Express Highway Goregaon (East) Mumbai-400 063 Maharashtra, India Tel : +91 22 6245 1000 Fax: +91 22 6245 1001 INDEPENDENT AUDITOR'S REPORT ON AUDIT OF ANNUAL CONSOLIDATED

  63. Slide 63: Independent Auditor's Report – Consolidated (basis for opinion)

    Deloitte Haskins & Sells LLP Requirements) Regulations, 2015, as amended, including the manner in which it is to be disclosed, or that it contains any material misstatement. Basis for Opinion on the Audited Consolidated Financial Results for the year ended March 31, 2024 We conducted our audit in ac

  64. Slide 64: Auditor's Responsibilities – Consolidated

    Deloitte Haskins & Sells LLP Auditor's Responsibilities (a) Audit of the Consolidated Financial Results for the year ended March 31, 2024 Our objectives are to obtain reasonable assurance about whether the Consolidated Financial Results for the year ended March 31, 2024, as a whole are free from mat

  65. Slide 65: Independent Auditor's Report – Consolidated (continued)

    Deloitte Haskins & Sells LLP • Obtain sufficient appropriate audit evidence regarding the Annual Standalone Financial Results/ Financial Information of the entities within the Group and its associate and joint venture to express an opinion on the Annual Consolidated Financial Results. We are respons

  66. Slide 66: Independent Auditor's Report – Other Matters

    Deloitte Haskins & Sells LLP • We did not audit the financial statements / financial information of 36 subsidiaries included in the consolidated financial results, whose financial statements / financial information reflect total assets of Rs. 31,839.42 crore as at March 31, 2024 and total revenues o

  67. Slide 67: Annexure A – List of Entities

    Deloitte Haskins & Sells LLP Annexure A Parent JSW Energy Limited Subsidiaries 1) JSW Energy (Barmer) Limited 2) JSW Power Trading Company Limited 3) JSW Energy (Raigarh) Limited 4) JSW Neo Energy Limited 5) Jaigad PowerTransco Limited 6) Ind-Barath Energy (Utkal) Limited 7) JSW Hydro Energy Limited

  68. Slide 68: Annexure A – List of Entities (continued)

    Deloitte Haskins & Sells LLP 50) Mytrah Vayu (Som) Private Limited 51) Mytrah Vayu (Sabarmati) Private Limited 52) Mytrah Aadhya Power Private Limited 53) Mytrah Aakash Power Private Limited 54) Mytrah Abhinav Power Private Limited 55) Mytrah Adarsh Power Private Limited 56) Mytrah Agriya Power Priv

  69. Slide 69: Statement of Consolidated Financial Results

    __,& ENERGY LIMITED Registered Office : JSW Centre, Bandra Kurla Complex, Bandra (East), Mumbai 400051 CIN: L74999MH1994PLC077041 Statement of Consolidated Financial Results for the Quarter and Year Ended March 31, 2024 ( ~ crore) Quarter Ended Year Ended Sr. Particulars 31.03.2024 31.12.2023 31.03

  70. Slide 70: Consolidated Statement of Assets and Liabilities

    Consolidated Statement of Assets and Liabilities ( t crore) As at Sr. Particulars 31 .03.2024 31 .03.2023 No. Audited Audited A ASSETS 1 Non-current assets: (a) Property, plant and equipment 26,088.16 23,065.01 (b) Capital work-in-progress 10,282.30 4,779.50 (c) Goodwill 639.82 639.82 (d) Other inta

  71. Slide 71: Consolidated Statement of Cash Flows

    Consolidated Statement of Cash Flows ( f crore) Sr. Particulars For the year ended For the year ended No. 31 .03.2024 31 .03.2023 Audited Audited I. CASH FLOW FROM OPERATING ACTIVITIES Profit before tax and deferred tax adjustable in future tariff 2,166.91 1,942.84 Adjusted for: Depreciation and amo

  72. Slide 72: Cash and Cash Equivalents and Additional Information

    Sr. Particulars For the year ended For the year ended No. 31.03.2024 31.03.2023 Audited Audited CASH AND CASH EQUIVALENTS -AT THE BEGINNING OF THE 4,468.74 1,835.12 YEAR Additions through business combination and asset acquisition 121.22 224.94 Fair value gain on liquid investments (2.95) 7.17 Effec

  73. Slide 73: Additional Ratios and Consolidated Segment Information

    Sr. Particulars As at/ Quarter Ended As at/ Year Ended No. 31 .03.2024 31 .12.2023 31 .03.2023 31 .03 .2024 31.03.2023 10 Inventory Turnover (no. of days) 61 61 46 70 57 (Average Inventory I {Fuel cost + Purchase of stock-in-trade + Stores and spares consumed+ Changes in inventories}• No of days in

  74. Slide 74: Notes to Consolidated Results

    Notes: The Board of Directors has recommended dividend of 20% ( ~2 per equity share of ~ 10 each) for the financial year 2023-24 subject to the approval of shareholders in the Annual General Meeting. 2 Exceptional item of~ 120 crore comprises re versal of loss allowance on a loan , recognised in an

  75. Slide 75: Press Release – Financial Results for Quarter and Year ended March 31, 2024

    ~ _-'5f/V Energy Press Release May 7, 2024 Financial Results for the Quarter and Year ended March 31, 2024 Mumbai, India: JSW Energy Limited ("JSW Energy" or the "Company") today reported its results for the quarter ("Q4 FY24" or the "Quarter") and the financial year ("FY24" or the "Year") ended Mar

  76. Slide 76: Summary of Operational and Financial Performance Q4FY24 and FY24

    Summary of Operational and Financial Performance Q4FY24 and FY24 (Consolidated) Operational: • Total Net Generation for Q4FY24 increased 26% YoY to 6.4 BUs driven by contribution from acquired and greenfield RE capacity additions and higher thermal generation • Total RE generation during the quarter

  77. Slide 77: Robust Pipeline Fueling Growth: Generation Projects

    Robust Pipeline Fueling Growth: Generation Projects • Won RE bids with a cumulative capacity of 3.4 GW in the quarter • Solar - bids of 2.4 GW won (i) 700 MW each from SJVN, NTPC and SECI and (ii) 300 MW from GUVNL • Wind - 1.0 GW bid won from SECI under Tranche XVI • Acquisition: Execution of Busin

  78. Slide 78: Consolidated Operational Performance

    Consolidated Operational Performance Total Net Generation at various locations/plants is as follows: (Figures in Million KWh or MUs) Location/ Plant Q4 FY24 Q4 FY23 Thermal Vijayanagar 1,018 998 Ratnagiri 2,097 1,752 Barmer 1,754 1,730 lnd-Barath 196 NA Nandyal 23 2 Renewable Hydro 369 403 Acquired

  79. Slide 79: PLFs achieved during Q4 FY24

    PLFs achieved during Q4 FY24 at various locations/plants are as follows: • Vijayanagar: The plant operated at an average PLF of 59% (59% 1) in the quarter vis-a-vis 58% (59% 1) in Q4 FY23. • Ratnagiri: The plant operated at an average PLF of 87% (100% 1) in the quarter vis-a-vis 74% (98% 1) in Q4 FY

  80. Slide 80: Finance cost, PAT, net worth and net debt

    acquired RE portfolio) and increase in weighted average cost of debt to 8.64% as of Q4 FY24 (from 8.36% in Q4 FY23) with the rising interest rates cycle. Profit after Tax increased by a robust 29% YoY to ~351 Crore in the quarter while the Cash PAT during the quarter stood at ~686 Crore. For FY24 To

  81. Slide 81: Business Environment

    Business Environment 1 : • India's power demand increased by 7.4% YoY in Q4 FY24, driven by heating requirements in the early part of the quarter followed by cooling requirements in latter part of the quarter. For FY24 power demand increased by 7.5% YoY. • Further, All-India peak power demand touche

  82. Slide 82: Business Environment – PMI, GST, CPI and sector outlook

    services (Mar-24: 60.3) PMI prints remain strong. Gross GST collection trend continues to be robust at 1.78 trillion in Mar-24, up 11% YoY and 12% for FY24. • In March, CPI eased to a 10-month low of 4.85% and remains within the RBl's tolerance mark. • Over the medium term, the power sector outlook

  83. Slide 83: About JSW Energy

    ABOUT JSW ENERGY: JSW Energy Ltd is one of the leading Private sector power producers in India and part of the USO 23 billion JSW Group which has significant presence in sectors such as steel, energy, infrastructure, cement, sports among others . JSW Energy Ltd has established its presence across th