Exxaro Resources Limited · JSE:EXX
Exxaro Resources — Africa Iron Ore Conference 2012
27 slides from Exxaro Resources's conference presentation, Jun 5, 2012

Slide 1: Developing an African iron ore project
5 June 2012 Developing an African iron ore project Africa Iron Ore Conference Presentation by Ernst Venter Executive General Manager, Business Growth Exxaro Resources Limited

Slide 2: Disclaimer
Disclaimer 2 2 Opinions expressed herein are by nature subjective to known and unknown risks and uncertainties. Changing information or circumstances may cause the actual results, plans and objectives of Exxaro Resources Limited (the “Company”) to differ materially from those expressed or implied in

Slide 3: We achieved what we set out to do…
We achieved what we set out to do… 3 Extract from MININGMX, 11 Jan 2012: EXXARO Resources has learned a bunch since its last attempt at a takeover, the failed A$123m bid for Territory Resources, an Australian- listed firm. As evidence, just look how much more difficult Exxaro has made it for an inte

Slide 4: Activities since the successful acquisition
Activities since the successful acquisition 4 …2 months into the project… ü Delisted African Iron Limited from the ASX ü Changing all companies to Pty Ltd’s ü Direct Exxaro management and operational control ü Broad-based financial, technical and operational review in progress ü Technical and projec

Slide 5: Mayoko welcomes Exxaro
Mayoko welcomes Exxaro 5

Slide 6: Improving the Exploration Camp
Improving the Exploration Camp 6

Slide 7: Exxaro’s Mayoko Iron Ore Project
Exxaro’s Mayoko Iron Ore Project 7 The Project is located in the south west corner of the Republic of Congo and is Location approximately 300km north east of the port city of Pointe Noire. The Republic of Congo (“RoC”) is a French speaking country with a population of ~3.7 million. The country has a

Slide 8: Exxaro’s Mayoko Project Location
Exxaro’s Mayoko Project Location 8 Ngoubou-Ngoubou 944km2 Mayoko-Lekoumou ~1000km2

Slide 9: Exploration Drilling
Exploration Drilling 9 MIPOUNDI NORTH: LEKOUMOU: 25 holes ~5 000m 116 holes ~23 200m Execute reconnaissance work Outline a measured/ indicated resource statement JORC Resource 121Mt Exploration target >400Mt Potential >2.5Bt MIPOUNDI: 50 holes ~10 000m LEKOUMOU SOUTH: Execute reconnaissance work 25

Slide 10: Regional Potential
Regional Potential 10 Investigate the license areas outside the 4 main target areas in terms of size and quality. • Limited exploration of the ~1000km2 Lekoumou license area to date. • 944km2 Ngoubou-Ngoubou license area is untested.

Slide 11: Geological section through Lekoumou deposit
Geological section through Lekoumou deposit

Slide 12: Ore Types – DSO (direct shipping ore)
Ore Types – DSO (direct shipping ore) 12 Soft goethite/limonite/gibbsite The upper enriched iron cap (DSO) contains >50% Fe which can be upgraded. Soft & hard goethite/ limonite/gibbsite Mainly hard goethite/limonite with less gibbsite

Slide 13: Ore Types – bDSO (beneficiable DSO)
Ore Types – bDSO (beneficiable DSO) 13 The ‘bDSO’ (or enriched BIF) contains between 40% and 50% Fe (in-situ), which is a mixture of hematite and magnetite. The enrichment is mainly due to the weathering and depletion of silica and results in a friable BIF, which becomes harder with depth as the wea

Slide 14: Ore Types – fBIF (fresh banded iron formation)
Ore Types – fBIF (fresh banded iron formation) 14 BIF - parallel laminated The ‘fBIF” (or fresh BIF) contains ~35% Fe and represents mainly magnetite and silica laminae; some iron silicates do occur. BIF - wavy laminated BIF – intensely folded lamination

Slide 15: Iron Ore in the Jungle
Iron Ore in the Jungle 15 DSO from surface level down…

Slide 16: Rail infrastructure is in good condition and upgradable
Rail infrastructure is in good condition and 16 upgradable The existing rail corridor is one of the most important attributes of this opportunity

Slide 17: Port infrastructure
Port infrastructure 17 Port § The port of Pointe-Noire is located on the Atlantic coast and is Location the sole port for import / export of goods for RoC Port Noire /Indie to Europe EUROPE (Rotterdam) 16 Days Port § PAPN is a government owned agency and the operator of Brazil to Europe (Rotterdam)

Slide 18: DMC Iron Congo concession at Point Indienne
DMC Iron Congo concession at Point Indienne 18

Slide 19: Development schedule, Capex and Opex
Development schedule, Capex and Opex 19 Development plan under review until end July 2012 • Enjoying benefit of, and building on solid ground work done by AKI • Early findings/indications: • Mine potential • Quality of resource • Possibility of bigger scale mine than AKI proposal • Beneficiation con

Slide 20: Commodity and Market Expectations
Commodity and Market Expectations 20 • Logistical infrastructure will be key to future development • Global seaborne trade is likely to >1.4Bt (1.16Bt in 2011) • Lump ore production is declining (Brazil & India) • Shortfall in lump ore production will be made up by pellets and production could doubl

Slide 21: Challenges facing the mining industry
Challenges facing the mining industry 21 Source: Barclays, Equity Research, 18 April 2012 Capital intensity is a function of the: 1. development stage of the project; Greenfield projects inflated by significant infrastructure requirements; 2. geographic location; and 3. quality of deposit (type/grad

Slide 22: Iron ore projects capital intensity (US$/ton)
Iron ore projects capital intensity (US$/ton) 22 $120/t M pa o ok am ay ar M

Slide 23: Project Robustness
Project Robustness 23 …”The Rest” The Domain of the MAJOR’s MAYOKO “Site Costs include the cost of moving the product to the point of loading for the customer. In terms of sea borne export, this would include moving the product from the mine site to the stockyards at the port. This may be by rail, r

Slide 24: Exxaro’s “in-house” skills
Exxaro’s “in-house” skills 24 Exxaro has the in-house skills, expertise and know-how to develop an iron ore project from conceptual phase to production. Our technical skills and capabilities include: Extensive support services structure

Slide 25: In Summary
In Summary 25 • Exceptional Quality Resource • Near term DSO production • Infrastructure access • Experienced operational management team • Strong stakeholder support • Upside potential • Mayoko and Ngoubou under-explored • Magnetite • Downstream integration Powering Possibility

Slide 26: BUT, as we’ve said before…………Africa is not for the faint hearted…!
BUT, as we’ve said before…………Africa is not for the faint hearted…! 26

Slide 27: Bonjour Africa!
Bonjour Africa! 27
Source: Internet Archive copy of exxaro.com
More decks from Exxaro Resources Limited
H1 2026 Earnings Presentation41 slides · Aug 20, 2026
Investor Day (June 2026)100 slides · Jun 22, 2026
FY2025 Earnings Presentation47 slides · Mar 19, 2026
SA Tomorrow Conference 202529 slides · Oct 22, 2025
H1 2025 Earnings Presentation41 slides · Aug 21, 2025
Merger or Acquisition (May 2025)17 slides · May 13, 2025