Eversource Energy (d/b/a) · NYSE:ES

Eversource Energy (d/b/a) — Eversource Energy — Corporate Update (July 2024)

11 slides from Eversource Energy (d/b/a)'s corporate update, Jul 17, 2024

  1. Slide 1: Eversource Major Projects Update

    Eversource Major Projects Update presented to the ………………………………………. Middlesex 3 Coalition July 17, 2024

  2. Slide 2: Service Territory in the Middlesex 3 (M3)

    Service Territory in the Middlesex 3 (M3) Electric Service Provided to Southern Communities Quick Facts ▪ Eversource provides electric service to Billerica, Bedford, Burlington, Woburn & Lexington. ▪ Eversource serves 53,000+ electric customers across these five communities. ▪ National Grid provides

  3. Slide 3: Where We Are & Where We Are Headed

    Where We Are & Where We Are Headed Yesterday’s Grid Compared to Tomorrow’s ▪ We’re On Our Way. Achieving the States's climate & clean energy goals is an ongoing success story that’s already under way. ▪ Upgrades Ahead. It will require an electric network buildout & upgrades at a significant pace and

  4. Slide 4: Achieving a Clean Energy Future

    Achieving a Clean Energy Future Move Away from Fossil Fuels & Use Electric-Based Solutions TYPICAL HOUSEHOLD TODAY 700 kWh/month ▪ Lighting, appliances, air conditioning (seasonal). ▪ Heating likely from natural gas, oil or propane. TYPICAL FUTURE HOUSEHOLD 1,400-2,400 kWh/month ▪ 600 kWh: Lighting,

  5. Slide 5: Electric Sector Modernization Plan (ESMP)

    Electric Sector Modernization Plan (ESMP) Infrastructure Investment Needed Across Massachusetts Middlesex 3 Region ▪ Plan released in early 2024 that looks 10 years out with upgrades to the grid across Mass. to meet growing demands & state climate goals of net zero by 2050. ▪ By 2050, the average ho

  6. Slide 6: Major Capital Projects in the M3 Region

    Major Capital Projects in the M3 Region Lookahead for the Coming Years Project ‘24 ‘25 ‘26 ‘27 ‘28 ‘29 ‘30 ‘31 ‘32 ‘33 Planning & New Burlington Station Filing: Q1 feedback Lexington Station 320 Upgrades Woburn Station 211 Planning Design Security Fence Upgrade N. Cambridge-Woburn Planning & Filing:

  7. Slide 7: Lexington & Woburn Substation Upgrades

    Lexington & Woburn Substation Upgrades Project Highlights • The security fence upgrade project at the Woburn Substation adjacent to Horn Pond will begin construction in 2026. • Equipment at the Lexington Substation, located near Minuteman High School, will be replaced starting in 2024. *Timelines su

  8. Slide 8: Proposed New Burlington Substation

    Proposed New Burlington Substation Iterative Analysis to Find a Proposed Location • Criteria: At least 2.5-3 acres (100,000 sq. Existing ft.) of buildable land, within a half mile Transmission Lines of existing transmission lines, required to site the appropriate equipment & have space during constr

  9. Slide 9: Asset Condition Replacement Projects

    Asset Condition Replacement Projects Ongoing Activities to Secure a Reliable Source of Power Eversource Infrastructure in Burlington, Lexington & Woburn Project Highlights • Woburn Station 375, located at May Key Dragon Court, equipment Major Substations Transmission Lines upgrades in 2025. • Cyclic

  10. Slide 10: N. Cambridge-Woburn 345-kV UG Line

    N. Cambridge-Woburn 345-kV UG Line Universe of Routes Displayed 9

  11. Slide 11: Team Contact Information

    Team Contact Information Information for the Public ❑ Hotline: 1-833-836-0302 ❑ Email: ProjectInfoMa@eversource.com ❑ Major Projects Online: https://bit.ly/EVSProjects24 or scan below Community Relations Peter Bowman peter.bowman@eversource.com Strategic Projects Samantha Buonafede samantha.buonafed