Theta Gold Mines Ltd. · ASX:TGM

Theta Gold Mines — Africa Down Under Conference 2019

28 slides from Theta Gold Mines's conference presentation, Sep 4, 2019

  1. Slide 1: 6 Moz Resource & near term potential gold production profile

    For personal use only THETA GOLD MINES LTD 6 Moz Resource & near term potential gold production profile Investor Presentation 4-6 September 2019 - Perth

  2. Slide 2: Forward looking and cautionary statements

    Forward looking and cautionary statements For personal use only This announcement or presentation may refer to the intention of Theta Gold Mines regarding estimates or future events which could be considered forward looking statements. Forward looking statements are typically preceded by words such

  3. Slide 3: Disclaimer and Competent Person Statement

    Disclaimer and Competent Person Statement For personal use only This announcement or presentation has been prepared by and issued by Theta Gold Mines Limited (ASX:TGM) to assist in informing interested parties about the Company and should not be considered as an offer or invitation to subscribe for

  4. Slide 4: Corporate Overview

    Corporate Overview For personal use only Capital structure  Theta Gold Mines Limited (ASX: TGM, TGMO) Ordinary shares ~400 million  ASX listed since 2012 Listed Options (TGMO), Expiration Oct 2020, $0.30 exercise (m) 31.4  Strong technical board with production & South Unlisted Options and Perfor

  5. Slide 5: Investment Overview: Low CapEx, near term production

    Investment Overview: For personal use only Low CapEx, near term production Sustainable resources: As an ASX‐listed junior, Theta Gold  Gold 6 Moz ‐ 44.78 Mt @ 4.18g/t. Mines has one of the largest JORC 2012  A massive under explored ground holding across the Sabie resources and has the potential t

  6. Slide 6: Corporate Structure

    Corporate Structure For personal use only The Black Economic Incorporate in Empowerment (“BEE”) Australia: ASX Parent shareholding in general company comprise of: Incorporated: 100%  Employees Trust SA wholly‐owned (Employee/labour subsidiary Incentives), Incorporated: South Africa  Landholders, o

  7. Slide 7: Project Company Board of Directors

    Project Company Board of Directors For personal use only Project company Board of Directors at our subsidiary Transvaal Gold Mining Estates Ltd Bill Guy (“TGME”) (Chairman duties) (Chairman ‐ Theta Board) CEO ‐ George Jenkins Director ‐ Terrence Director ‐ Natasha MD ‐ Rob Thomson Mokale Director ‐

  8. Slide 8: South Africa – Three Major Goldfields

    South Africa – Three Major Goldfields For personal use only Sabie Pilgrim’s Rest Goldfields (predominantly owned by Theta Gold Mine subsidiary TGME, near surface ‐ flat TGME Gold Projects reef systems). Producing: 1873 – 1940[?], 1980s, 90s and should soon be producing again. Witwatersrand: 1886 – C

  9. Slide 9: Mining Rights and Resources

    Mining Rights and Resources For personal use only 620sqkm tenements Northern tenements Open Cut Theta Project (MR83) Southern tenements Group JORC Resources of 6Moz Au (44.8Mt @ 4.18g/t Au):  1.3Moz open cut resources (13.08Mt @ 3.12g/t Au)  4.5Moz underground resources (26.3Mt @ 5.4g/t Au)  Init

  10. Slide 10: Geology – Two Gold Systems

    Geology – Two Gold Systems For personal use only Under Explored – No modern geophysical surveys  TGME Goldfield ‐ metallogenic province extends for approximately 140 km in a north‐north‐easterly direction, Gold system One over a width of 30 km .  Gold System One ‐Epigenetic gold mineralisation occ

  11. Slide 11: Emergence of an established mining jurisdiction

    Emergence of an established mining jurisdiction For personal use only  South Africa has produced more gold than any other country  Over two billion ounces produced from South African goldfields  New pro‐mining President elected in South Africa as head of the ANC o A former businessman o A former

  12. Slide 12: Success Stories – South Africa

    Success Stories – South Africa For personal use only Pan African Resources Plc / gold producer (AIM/JSE. BMN, £260m MC / eqv. ~A$490m)  170Kozpa gold producer (2019FY)  150km South of Theta’s project in the Barberton Greenstone Belts.  World’s very first Biox‐gold operation  Effective interest i

  13. Slide 13: Starter Project – Theta Project Feasibility Study

    Starter Project – Theta Project Feasibility Study For personal use only Average annual EBITDA (based on USD1257/oz gold price) over 5 years approx. USD20 million (39% Margin) Average All‐in Sustaining Cost over 5 years USD764/oz Average LoM gold recovery/yield at 91.6% Payback period 1.2 years 13 AS

  14. Slide 14: Theta Project Feasibility – Low CapEx

    Theta Project Feasibility – Low CapEx For personal use only Unlocking large 6Moz resource base: starting from open cut mining, then shallow underground BHID Sample From To Width Estimated Recovery Au_Final Intersection Open Cut Theta Project – startup Feasibility Study No. m m m g/t m Au g/t DDBH21

  15. Slide 15: Theta Project Feasibility – All-in-sustaining cost

    Theta Project Feasibility – All‐in‐sustaining cost For personal use only  LOM AISC of US$764/oz (lower in first two years)  Minimal drill/blast allowed  Simple crush/grind and standard CIL processing with high recovery (>91%)  Operating cashflow to potential self‐ fund for multiple pit openings

  16. Slide 16: Theta Project Feasibility – Cashflow

    Theta Project Feasibility – Cashflow For personal use only  FS cashflow were based on USD1257/oz gold price  Strong free cashflow generation post construction, total US$65.7m over LOM (post tax, costs)  Recent weakening of ZAR will lower USD Capex and Opex. ZAR Gold is up 24% since concluding the

  17. Slide 17: Theta Project Feasibility – Mining Method

    Theta Project Feasibility – Mining Method For personal use only  Modified terrace mining with partial waste‐backfill, low cost method due to relatively flat‐lying ore seams and favorable topography  Simple and efficient method using bulldozers, excavators for ripping and loading both waste and ore

  18. Slide 18: Theta Project Feasibility – Production Summary

    Theta Project Feasibility – Production Summary For personal use only Production Summary over 57 months‐ Ore Mined & Head Grade 2.52Mt @ 2.71g/t Au Total material moved 36.2 Mt (13.4x) (effective strip ratio) Total ounces recovered 200,904oz LOM gold recovery assumption 91.6% Average annual productio

  19. Slide 19: Growth Strategy – production ramp up

    Growth Strategy – production ramp up For personal use only Other open-cut + high grade UG mines Additional open-cut resources from rest >100kozpa of MR83/341 Theta Hill + Vaalhoek open- Columbia Hill ore cut and (MR83 only) Rietfontein/Beta Theta Expanded, South Theta + UG next focus >50kozpa Columb

  20. Slide 20: Scalability – Gold plant expansion strategy

    Scalability – Gold plant expansion strategy For personal use only  Optimisation of Phase 1 Plant – to support scalability  Phase 1: 500,000tpa Open Cut Oxide CIL Plant (Theta Project FS Design May 2019)  Phase 2: Permitted plant space to expand Open Cut Oxide CIL Plant to 1 Mtpa  Phase 3: Permit

  21. Slide 21: Scalability – Theta Project open cut upside

    Scalability – Theta Project open cut upside For personal use only  Only 16.7% of Theta’s open‐cut resource are included in the Feasibility mine plan to date and only 57% of Theta’s current Open‐cut Indicated Resources  Open‐cut resources have increased by 30% since 2018 to 1.3Moz, further potentia

  22. Slide 22: Scalability – Near term resource development

    Scalability – Near term resource development For personal use only  Near term open cut expansion priorities  Additional Theta Hill & Columbia Hill (MR83/341 inclusive)‐ reserve conversions‐ o currently 879.6 Koz @ 2.7g/t Indicated/Inferred Resources o only 35% of resources in MR83 included in rese

  23. Slide 23: Scalability – Drill-to-validate exploration model

    Scalability – Drill‐to‐validate exploration model For personal use only Drill‐to‐validate Model – Exploration cost 12 USD Indicated JORC Gold Ounce 1. Digitise 130 years of mining data – So far over 75,000 +underground samples and 1,281 drill holes in data base 2. Maps and underground plans scanned

  24. Slide 24: Re-rating Potential / Why buy TGM?

    Re‐rating Potential / Why buy TGM? For personal use only 1. Transitioning from Explorer to Developer to Producer “Status”  A re‐rating of resources/reserves in‐ground Rand (ZAR) Gold Price also trading at all time high at ~ZAR23,351/Oz (as at 1 September 2019) 2. Low capital expenditure startup  L

  25. Slide 25: Goodbye from South Africa

    For personal use only (Photos captured at 2018 South African National Gold Panning Championships, held on TGME Mining Rights for last 21 years) “Goodbye from South Africa”

  26. Slide 26: Appendix A - Resources

    Appendix A ‐ Resources For personal use only Combined Mineral Resources as at 16 May 2019 Notes: Mineral Resource Tonnage Gold Grade Gold Content Type of Operation • Columns may not add up due to Classification rounding. Mt g/t Kg koz • Gold price used for the cut-off Measured Underground 0.091 5.37

  27. Slide 27: Appendix A - Resources

    Appendix A ‐ Resources For personal use only Reef Reef Reef Mineral Grade Width Content Tonnes Au Content Total Theta Project ‐ Mineral Resources, 16 May Resource Open Pit Mine Reef 2019 Classification g/t cm cmgt Mt Kg koz Theta & Browns Hill Shale 1.02 200 204 0.439 402 12.9 Theta & Browns Hill Be

  28. Slide 28: Appendix A - Resources

    Appendix A ‐ Resources For personal use only Theta Project Ore Reserves for MR83 only, 16 May 2019 (The Ore Reserves exclude Inferred Mineral Resources) Mineral Resource Reef Notes: Grade Au Content Category in LoM Pit Tonnes • Totals in the Ore Reserve may not add‐up due to Plan g/t kt kg oz roundi