Irc Limited · HKEX:1029

Irc — Q4 2011 Earnings Presentation

22 slides from Irc's earnings presentation, January 2012

  1. Slide 1: Fourth Quarter 2011 Trading Update

    1029.HK Fourth Quarter 2011 Trading Update

  2. Slide 2: Highlights

    Highlights KURANAKH • Q4 Production increases • FY2011 production targets exceeded Iron ore concentrate: 800,291 tonnes vs 750,000 target Ilmenite concentrate: 63,490 tonnes vs 52,000 target K&S • Fourth quarter ended with all construction activities completed to schedule. • First tranche of project

  3. Slide 3: Presentation Overview

    PRESENTATION OVERVIEW 1. Introduction to IRC 2. Kuranakh 3. K&S 4. Outlook 3

  4. Slide 4: Russia – Kuranakh map

    RUSSIA KURANAKH — g ART 4 (Scale 1: 10000000) Heilongjiang RAL Birobidjan Heine Eh RELS, ( ia Khabarovsk Manzhouli BEB AMT. mien Shuanyashan Sei MONGOLIA Sestunh a Harbin ry Cah) CHINA : Vladivostok Pee weEy ee Beijing ple8 Tianjin NORTH KOREA FE SOUTH KOREA me beeen BAM Railway Aton - HSER pew Tran

  5. Slide 5: Competitive Advantages

    Competitive Advantages  Location on Chinese border: preferred supplier status  World class infrastructure and skills  Proven operator with a respected heritage  Diverse portfolio with exploration, development and producing assets  Strong growth profile being delivered across multiple assets  F

  6. Slide 6: Production Profile

    Production Profile Production volume (million tonnes) 14.0 12.0 10.0 4.6 8.0 6.0 3.1 4.0 CAGR +63% 3.2 1.6 2.0 0.9 1.0 1.1 1.1 1.1 0.2 0.0 2010 2011 2012 2013 2014 2015 Kuranakh Kimkan Sutara Garinskoye By-product Ilmenite tonnes converted as iron equivalent

  7. Slide 7: Presentation Overview

    PRESENTATION OVERVIEW 1. Introduction to IRC 2. Kuranakh 3. K&S 4. Outlook 7

  8. Slide 8: Kuranakh Exceeded production targets

    Kuranakh  Exceeded production targets Iron Ore: Actual 800,291 tonnes – Target 750,000 tonnes Ilmenite: Actual 63,490 tonnes – Target 52,000 tonnes  Mining activities continue to plan iron ore concentrate +7.7% to 233,908 tonnes  Quarterly production increased Ilmenite concentrate +30.2% to 23,37

  9. Slide 9: Winter Wagon Loading at Kuranakh

    Winter Wagon Loading at Kuranakh

  10. Slide 10: Kuranakh Production Statistics

    Kuranakh Production Statistics IRON ORE Q1 Q2 Q3 Q4 Full Year Concentrate Produced t 177,645 171,591 217,147 233,908 800,291 Concentrate Sold t 167,099 199,886 210,293 192,810 770,088 Average Price (Fe 62.5%) $/t 143 149 150 131 143 ILMENITE Concentrate Produced t 7,464 14,707 17,948 23,371 63,490 C

  11. Slide 11: Presentation Overview

    PRESENTATION OVERVIEW 1. Introduction to IRC 2. Kuranakh 3. K&S 4. Outlook 11

  12. Slide 12: Construction of Transformer System

    Construction of Transformer System

  13. Slide 13: K&S: Bridge over Transiberian Railway

    K&S: Bridge over Transiberian Railway Q3 2011 Q4 2011

  14. Slide 14: K&S Update

    K&S Update Progress on track and fully funded ICBC project debt facility MILESTONE draw downs commenced  Mining of overburden continued: 698,800 m3 material removed  Ore stockpile total 40,400 tonnes  Initial infrastructure works within EPC site on schedule  Contractor camps complete  Processin

  15. Slide 15: Presentation Overview

    PRESENTATION OVERVIEW 1. Introduction to IRC 2. Kuranakh 3. K&S 4. Outlook 15

  16. Slide 16: Iron Ore Market

    Iron Ore Market “Stronger for longer” DEMAND  Chinese iron ore offtake remains strong for IRC  Demand growth continues to be driven by construction  Inventories reduced over 2012; need for restocking  Chinese 2012 Fe demand growth estimated at 5%, (10% in Heilongjiang) SUPPLY  Deteriorating ass

  17. Slide 17: Robust Pricing

    Robust Pricing $/tonne 200.0 180.0 160.0 $138/t 140.0 120.0 100.0 +6% 80.0 +9% 60.0 40.0 20.0 0.0 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Source: Bloomberg 17

  18. Slide 18: Dollar Ruble

    Dollar Ruble USD : RUB 35 30 25 20 15 10 5 0 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11

  19. Slide 19: Outlook

    Outlook • Strong demand and firm prices for our commodities • Ongoing ramp-up of production at Kuranakh Mine • Continued and fully funded development of K&S Project • Continued exploration and optimisation at Garinskoye Wednesday 22 February 2012: IRC 2011 FY Results 19

  20. Slide 20: Conference Call Q & A

    Conference Call Q & A

  21. Slide 21: Disclaimer

    Disclaimer 本简报或当中所述文件所载的部分陈述属于或可能属于前瞻性陈述。该等陈述反映本公司现时对未来事件的看法,或会涉及风险、假设、不明朗因 素及其他并非本公司所能控制的因素,可能导致实际结果有别于该等陈述所列者。尽管本公司相信该等前瞻性陈述(仅截至本简报日期)均属合 理,惟无法保证有关内容正确。因此,阁下不应过份依赖该等陈述。 无法保证本简报所载前瞻性陈述涉及的结果及事件将会实现。本公司并无责 任刊发有关该等前瞻性陈述的任何修订以反映本简报日期后发生的事件、情况或不可预见事项,惟法律或任何相关监管机关规定者除外。本简报或 当中所述文件所载的资料不得视为溢利预测。 本公司及其股份过往

  22. Slide 22: IR contact

    1029.HK IR contact: Nick Bias ir@ircgroup.com.hk +852 9088 1029 www.ircgroup.com.hk