Filo Mining Corp

Filo Mining — Investor Presentation (October 2017)

14 slides from Filo Mining's investor presentation, October 2017

  1. Slide 1: Corporate Presentation October, 2017

    Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation October, 2017

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT All information included in this presentation, including any information as to the Company’s future financial or operating performance, and other statements that express management’s expectations or estimates of future performance, other than statements of historical fact, const

  3. Slide 3: A Strong Start, Lots More to Come

    A STRONG START LOTS MORE TO COME… • Spun out of NGEx, September, 2016 • Raised $20M at $2.00/share, October, 2016 • Successful exploration program, March 2017 • Resource update, August 2017 • Metallurgical test work, September 2017 • Preliminary engineering work underway • PEA targeted for Q1 2018 •

  4. Slide 4: Plan: A New Chapter of Exploration Success in Latin America

    PLAN A NEW CHAPTER OF EXPLORATION SUCCESS IN LATIN AMERICA • Evaluate potential for a low cost heap leach at Filo del Sol • If successful move towards eventual production 4

  5. Slide 5: Project Location

    PROJECT LOCATION GOOD ACCESS FROM BOTH CHILE AND ARGENTINA 5

  6. Slide 6: Project Overview

    PROJECT OVERVIEW ae age P ee 7 fo ig

  7. Slide 7: Resource Overview

    RESOURCE OVERVIEW FOCUS ON THE LEACHABLE ZONES WITHIN THE OVERALL RESOURCE GOLD OXIDE – COPPER-GOLD OXIDE - SILVER Filo South GOLD COPPER-GOLD SILVER 7

  8. Slide 8: Key Outcomes

    KEY OUTCOMES • Significant increase to overall resource • 98% conversion of Inferred to Indicated – Shows a robust and accurate geological model • Resource constrained by open pit ~1:1 strip ratio • Improved definition of zones – Now broken out by metallurgical characteristics • Gold oxide • Copper-

  9. Slide 9: Updated Resource Estimate

    UPDATED RESOURCE ESTIMATE SEE AUGUST 21, 2017 NEWS RELEASE FOR DETAILS Total Resource Tonnes Cu Au Ag lbs Cu Ounces Au Ounces Ag Zone Cutoff Category (millions) (%) (g/t) (g/t) (millions) (thousands) (thousands) Indicated 52.5 0.05 0.42 3.0 59 710 5,060 AuOx 0.20 g/t Au Inferred 31.7 0.08 0.36 2.4 5

  10. Slide 10: Zones at Varying Cut Off Grades

    ZONES AT VARYING CUT OFF GRADES BASE CASE HIGHLIGHTED; SEE AUGUST 21, 2017 NEWS RELEASE FOR DETAILS Gold Oxide Tonnes Cu Au Ag lbs Cu Ounces Au Ounces Ag Zone Cutoff Category (millions) (%) (g/t) (g/t) (millions) (thousands) (thousands) Indicated 79.2 0.05 0.33 2.6 82 832 6,600 0.10 g/t Au Inferred

  11. Slide 11: Oxide Copper Zone

    OXIDE COPPER ZONE POTENTIAL FOR SIMPLE, LOW COST, HEAP LEACH PROJECT + = WATER SOLUBLE COPPER 11

  12. Slide 12: Column Leach Testwork

    COLUMN LEACH TESTWORK VERY ENCOURAGING Leach Recoveries By Zone • Gold Zone: 93% gold; 70% silver • Copper-Gold Zone: 82% copper*; 87% gold**; 71% silver** • Silver zone***: 61% copper, 63% gold, and 73% silver NOTES * Good results with minimal minimal sulfuric acid addition; ** Gold and silver reco

  13. Slide 13: Heap Leaching Is a Simple, Low Cost Process

    HEAP LEACHING IS A SIMPLE, LOW COST PROCESS COMMONLY USED TO RECOVER GOLD, SILVER, AND COPPER FROM OXIDE ORES • Ore is mined and placed on leach pads or “heaps” • It is sprinkled with a solution that dissolves the metals • Metals are then recovered from the solution by various methods • Produces ~16

  14. Slide 14: Next Steps

    NEXT STEPS • Phase II metallurgical test work complete • Engineering work underway • Targeting PEA by Q1 2018 14