Metals Creek Resources Corp. · TSXV:MEK

Metals Creek Resources — Investor Presentation (February 2016)

33 slides from Metals Creek Resources's investor presentation, February 2016

  1. Slide 1: Metals Creek Resources

    METALS CREEK RESOURCES TSX-V: MEK Finding Gold in the Shadow of Headframes Experienced Team, Endless Opportunities

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements – Certain statements included in this presentation are forward-looking statements which are made pursuant to the “safe harbor” provisions of the United States Private Securities Litigation Reform Act of 1995. They include estimates and statements that describe the Company’

  3. Slide 3: Metals Creek's Projects

    Metals Creek’s Projects OGDEN PROJECT - FLAGSHIP PROPERTY jy GOLD PROJECT We BASE METAL PROJECT

  4. Slide 4: Ogden Gold Project, Timmins Gold Camp, Ontario

    Ogden Gold Project, Timmins Gold Camp, Ontario

  5. Slide 5: Mineralized Trend, Timmins Gold Camp

    Timmins Gold Camp Mineralized Trend

  6. Slide 6: Ogden Gold Project – 50/50 JV with Goldcorp Inc.

    Ogden Gold Project – 50/50 JV with Goldcorp Inc. Metals Creeks Flagship Property. Drilling in the shadow of the Head Frames in Canada’s most prolific Gold Camp. Metals Creek have formed a 50/50 joint venture with Goldcorp, MEK is operator. Over 8km of strike length of the Porcupine-Destor Break, the

  7. Slide 7: Thomas Ogden Zone

    Thomas Ogden Zone Historic results from the Thomas Ogden Zone 1.51 g/t Au over 21.4 m 1.01 g/t Au over 37.2 m within a mineralized porphyry. MEK results from recent drilling 210.19 g/t Au over 12.53 m, including 2732.6 g/t (2.73 kg) over 0.93 m 49.96 g/t Au over 9m April 2013 1.94g/t over 94m Februa

  8. Slide 8: Highlights 2012/13 Drilling

    Highlights 2012/13 Drilling Drill Hole Number Meters From Meters to Total Meters Gold g/t (Grammes per tonne) TOG 11-11 78.00 172.00 94.00 1.94 TOG 12-03 90.50 118.00 27.50 1.14 and 148.00 171.30 23.30 5.73 TOG 12-05 141.30 185.00 43.70 2.34 including 170.00 185.00 15.00 5.04 TOG 12-06 146.60 162.87

  9. Slide 9: Ogden Property, Timmins: Schematic Cross Section

    Se canen | TOG-13-38 1.89g/t Au over $4,65m inch. Fragmental 2.79g/t Au over 25.70m TOG-13-37 0.50g/t Au over 7.85m 2732.64g/t Au over 0.93m Ulizamafies NY OGDEN PROPERTY, TIMMINS: Schematic ross Section MZVS25W

  10. Slide 10: Thomas Ogden Zone Schematic Section

    TOG-13;24, 4.A;1git-Au, over, 1/1.40m, incl. THOMAS; ODGEN ZONE: SCHEMATIC SECTION|TZ_1493W, Looking Southwest Tetamity Metals Creek,

  11. Slide 11: Proposed Hole

    N o Proposed Hole. T0G-15-39

  12. Slide 12: Schematic Section 1200W

    SAAA AAA Ww AABH A HAM” ae = ——+ Fragmental Unit Chlorite Schist (High strain deformation zone) Exploration Potential zm Ultramafics Sedimentary Unit (Argillite, Greywacke and Conglomerate) Porphyry TOG-11-01 3.16 g/t Au / 13.40m incl. ] Felsic Dike 5.37 git Au/ 5.2m ey Gold Mineralization | 100m TO

  13. Slide 13: Thomas Ogden Showing

    Thomas Ogden Showing (grabs up to 15.77g/t Au) T0G-13-27 49.96q/t Au over 9.00m (uncut) incl. T0G-12.08 3.97 git Auover 17.00m \ T0G-13-36 incl, 18.44 gft Au over 3.0m 4.91 git gold over 17.05m — r Wf T06-12.03 m& TOG-13-38 6,09 git gold over 21.865m 2.79 g/t Au over 25.70m TOG-12-07 TOG-13-37: 9.46

  14. Slide 14: Thomas Ogden Porphyry 5.26 g/t Au over 23.4m

    Thomas Ogden Porphyry 5.26 g/t Au over 23.4m

  15. Slide 15: Visible Gold in Core

    Visible Gold in Core

  16. Slide 16: Visible Gold in Core

    A“, Visible Gold in Core

  17. Slide 17: Visible Gold in Core

    A Visible Gold in Core " = PA ea ) 4 ue 7 oe > * pe 75 aan ce le " ae ; aa: =@

  18. Slide 18: Mineralized Porphyries

    Ogden Gold Property Mineralized Porphyries

  19. Slide 19: Naybob South Zone

    Naybob South Zone Historic Results 6.33 g/t Au over 5.37m 11.85 g/t Au over 1.83m MEK recent drill results 9.24 g/t Au over 6.61m 6.22 g/t Au over 6.63m Press released January 10. 2012  all with visible gold at less than 100 meters vertical depth.  close to existing infrastructure.

  20. Slide 20: Naybob South Longsection

    Naybob South Longsection 300 mN 200 mN Osa. 100 mN —omN 100 mN © ws © 20 Sos a. Naybob South Gold Mineralization Grade x Thickness

  21. Slide 21: Schematic Longsection

    BUFFALO-ANKERITE TIMMINS WEST PAYMASTER MINE DEPOSIT THUNDER CREEK DISCOVERY THOMAS OGDEN ZONE THO S OGDEN ZONE 4 t{(? Jr ees Bw } bs “4 os al ww ‘a af vy. ee re Ogden Property is = ( 3) (Western Extent) = Ogden Property (Eastern Extent)

  22. Slide 22: Project Location! Location! Location!

    Key Points about the Ogden Gold Project Location ! Location ! Location ! - Located in the Prolific Timmins Gold Camp - 50/50 Joint Venture with Goldcorp/ MEK is the operator and sets the budget - Sandwiched between the Dome Mill approx 8 km from the claim boundary to the east and Lakeshore Gold’s de

  23. Slide 23: Squid East Gold Project

    Squid East Gold project METALS CREEK RESOURCES YUKON GOLD PROJECT fe ld Ang Prudhoe Bay bre *: 4 ? N.W.T. (CAN) : ats xt Farbanks pags \ SSE am ete Ss es ubexap itt ~~~ "> s=., Datgone_ RRM ( Nikon Rete: Cet ea ‘a Grek =e) Baia ani a am, ea EE ge soa s, = SS Sigma a? gal com al Se ‘Ss a = anchorage

  24. Slide 24: Squid East Property Location Map

    ALASKA YUKON 5 a co z g im g > a a & 3 2 5 MATSON PLACER CAMPS © sixty MILE METALS CREEK'S SQUID EAST ~ PROPERTY LOCATION MAP SQUID EAST PROPERTY S } * ® ipRoss ROSEBUTE QV PROJECTS GOLDEN SADDLE COFFEE Metals Creek - 0 Rese@egreaees 25 50 kilometers

  25. Slide 25: Newly Discovered Exploits Zone

    Newly Discovered Exploits Zone • Recent trenching 1.96 g/t Gold and 160.6 g/t Silver over the entire width of the 22 meter Trench • High grade section of 6.39 g/t Gold and 513.5 g/t silver over 4 meters • Drilling recently completed, 1.54 g/t Gold and 114 g/t silver over 21m • Oxidized Mineralizatio

  26. Slide 26: Soil Terrain

    Soil Terrain minimum 450m long with sous up to 1086.5 ppb Au 78.5 ppm Ag 50.9 ppm As 209.8 ppm Sb 2370 ppm Ba 36.32 ppm Hz

  27. Slide 27: Squid East Gold Project

    on ae “EXPLOITS TRENCH" including 6.39g/t Au + 513.50g/t Ag + 0.86% Pb / 4.0m $E13-001 1.70g/t Au + 81.78g/t ae + 0.31% Pb / 12.00m SE13-002 ‘ 1.55g/t Au + 114.12g/t Ag + 0.32% Pb / 21.00m including 2.43g/t Au + 185.25g/t Ag + 0.47% Pb / 12.00m SE13-003 i 0.37g/t Au + 39. side Ag + 0.66% Pb / 6.50m

  28. Slide 28: Exploits Zone

    -Exploits Zone- Trenching results of 1.96g/t Au and 160.6gA Ag over 22.0m incl. 6.39g/t Au and 513.5g/t Ag over 4.0m Sericite Schist SE13-007 SE13-002 EXPLOITS ZONE - SQUID EAST DRILL SECTION (FACING NORTH) Sten Metals Creek

  29. Slide 29: Gold Zone

    Gold/Zone 7,047,750 mN_ 520,250 mE 520,000 mE 519,750 mE 519,500 mE 519,250 mE 519,000 mE NUL OSE BPOL NU 000°8PO'L

  30. Slide 30: Squid East Gold Project – Matson Creek Placer Camp

    Squid East Gold Project Matson Creek Placer Camp

  31. Slide 31: Investor Information

    Investor Information Nov 2015 Market cap………………………………….…..Cdn $2.6 million Trading symbols……………………………..…TSX:V – MEK Issued and Outstanding……………………….24.6million Current Share Price…………………………...0.105 Website……………………www.metalscreek.com

  32. Slide 32: Officers & Directors

    Officers & Directors Sandy Stares, President and CEO and Director Michael MacIsaac, VP Exploration Nick Tsimidis, CFO & Director Wayne Reid, Director Mick Stares, Director Patrick Mohan, Director Malvin Spooner, Director Lorne Woods, Director Darin Wagner, Advisor Richard Nemis, Advisor

  33. Slide 33: Thank You

    METALS CREEK RESOURCES MEK TSX-V The Best Place to Look For Gold is in the Shadow of Headframes Thank You Experienced Team, Endless Opportunities

Metals Creek Resources — Investor Presentation (February 2016) on 6ix