Metals Creek Resources Corp. · TSXV:MEK
Metals Creek Resources — Investor Presentation (February 2016)
33 slides from Metals Creek Resources's investor presentation, February 2016
Slide 1: Metals Creek Resources
METALS CREEK RESOURCES TSX-V: MEK Finding Gold in the Shadow of Headframes Experienced Team, Endless Opportunities
Slide 2: Forward-Looking Statements
Forward-Looking Statements – Certain statements included in this presentation are forward-looking statements which are made pursuant to the “safe harbor” provisions of the United States Private Securities Litigation Reform Act of 1995. They include estimates and statements that describe the Company’
Slide 3: Metals Creek's Projects
Metals Creek’s Projects OGDEN PROJECT - FLAGSHIP PROPERTY jy GOLD PROJECT We BASE METAL PROJECT
Slide 4: Ogden Gold Project, Timmins Gold Camp, Ontario
Ogden Gold Project, Timmins Gold Camp, Ontario
Slide 5: Mineralized Trend, Timmins Gold Camp
Timmins Gold Camp Mineralized Trend
Slide 6: Ogden Gold Project – 50/50 JV with Goldcorp Inc.
Ogden Gold Project – 50/50 JV with Goldcorp Inc. Metals Creeks Flagship Property. Drilling in the shadow of the Head Frames in Canada’s most prolific Gold Camp. Metals Creek have formed a 50/50 joint venture with Goldcorp, MEK is operator. Over 8km of strike length of the Porcupine-Destor Break, the
Slide 7: Thomas Ogden Zone
Thomas Ogden Zone Historic results from the Thomas Ogden Zone 1.51 g/t Au over 21.4 m 1.01 g/t Au over 37.2 m within a mineralized porphyry. MEK results from recent drilling 210.19 g/t Au over 12.53 m, including 2732.6 g/t (2.73 kg) over 0.93 m 49.96 g/t Au over 9m April 2013 1.94g/t over 94m Februa
Slide 8: Highlights 2012/13 Drilling
Highlights 2012/13 Drilling Drill Hole Number Meters From Meters to Total Meters Gold g/t (Grammes per tonne) TOG 11-11 78.00 172.00 94.00 1.94 TOG 12-03 90.50 118.00 27.50 1.14 and 148.00 171.30 23.30 5.73 TOG 12-05 141.30 185.00 43.70 2.34 including 170.00 185.00 15.00 5.04 TOG 12-06 146.60 162.87
Slide 9: Ogden Property, Timmins: Schematic Cross Section
Se canen | TOG-13-38 1.89g/t Au over $4,65m inch. Fragmental 2.79g/t Au over 25.70m TOG-13-37 0.50g/t Au over 7.85m 2732.64g/t Au over 0.93m Ulizamafies NY OGDEN PROPERTY, TIMMINS: Schematic ross Section MZVS25W
Slide 10: Thomas Ogden Zone Schematic Section
TOG-13;24, 4.A;1git-Au, over, 1/1.40m, incl. THOMAS; ODGEN ZONE: SCHEMATIC SECTION|TZ_1493W, Looking Southwest Tetamity Metals Creek,
Slide 11: Proposed Hole
N o Proposed Hole. T0G-15-39
Slide 12: Schematic Section 1200W
SAAA AAA Ww AABH A HAM” ae = ——+ Fragmental Unit Chlorite Schist (High strain deformation zone) Exploration Potential zm Ultramafics Sedimentary Unit (Argillite, Greywacke and Conglomerate) Porphyry TOG-11-01 3.16 g/t Au / 13.40m incl. ] Felsic Dike 5.37 git Au/ 5.2m ey Gold Mineralization | 100m TO
Slide 13: Thomas Ogden Showing
Thomas Ogden Showing (grabs up to 15.77g/t Au) T0G-13-27 49.96q/t Au over 9.00m (uncut) incl. T0G-12.08 3.97 git Auover 17.00m \ T0G-13-36 incl, 18.44 gft Au over 3.0m 4.91 git gold over 17.05m — r Wf T06-12.03 m& TOG-13-38 6,09 git gold over 21.865m 2.79 g/t Au over 25.70m TOG-12-07 TOG-13-37: 9.46
Slide 14: Thomas Ogden Porphyry 5.26 g/t Au over 23.4m
Thomas Ogden Porphyry 5.26 g/t Au over 23.4m
Slide 15: Visible Gold in Core
Visible Gold in Core
Slide 16: Visible Gold in Core
A“, Visible Gold in Core
Slide 17: Visible Gold in Core
A Visible Gold in Core " = PA ea ) 4 ue 7 oe > * pe 75 aan ce le " ae ; aa: =@
Slide 18: Mineralized Porphyries
Ogden Gold Property Mineralized Porphyries
Slide 19: Naybob South Zone
Naybob South Zone Historic Results 6.33 g/t Au over 5.37m 11.85 g/t Au over 1.83m MEK recent drill results 9.24 g/t Au over 6.61m 6.22 g/t Au over 6.63m Press released January 10. 2012 all with visible gold at less than 100 meters vertical depth. close to existing infrastructure.
Slide 20: Naybob South Longsection
Naybob South Longsection 300 mN 200 mN Osa. 100 mN —omN 100 mN © ws © 20 Sos a. Naybob South Gold Mineralization Grade x Thickness
Slide 21: Schematic Longsection
BUFFALO-ANKERITE TIMMINS WEST PAYMASTER MINE DEPOSIT THUNDER CREEK DISCOVERY THOMAS OGDEN ZONE THO S OGDEN ZONE 4 t{(? Jr ees Bw } bs “4 os al ww ‘a af vy. ee re Ogden Property is = ( 3) (Western Extent) = Ogden Property (Eastern Extent)
Slide 22: Project Location! Location! Location!
Key Points about the Ogden Gold Project Location ! Location ! Location ! - Located in the Prolific Timmins Gold Camp - 50/50 Joint Venture with Goldcorp/ MEK is the operator and sets the budget - Sandwiched between the Dome Mill approx 8 km from the claim boundary to the east and Lakeshore Gold’s de
Slide 23: Squid East Gold Project
Squid East Gold project METALS CREEK RESOURCES YUKON GOLD PROJECT fe ld Ang Prudhoe Bay bre *: 4 ? N.W.T. (CAN) : ats xt Farbanks pags \ SSE am ete Ss es ubexap itt ~~~ "> s=., Datgone_ RRM ( Nikon Rete: Cet ea ‘a Grek =e) Baia ani a am, ea EE ge soa s, = SS Sigma a? gal com al Se ‘Ss a = anchorage
Slide 24: Squid East Property Location Map
ALASKA YUKON 5 a co z g im g > a a & 3 2 5 MATSON PLACER CAMPS © sixty MILE METALS CREEK'S SQUID EAST ~ PROPERTY LOCATION MAP SQUID EAST PROPERTY S } * ® ipRoss ROSEBUTE QV PROJECTS GOLDEN SADDLE COFFEE Metals Creek - 0 Rese@egreaees 25 50 kilometers
Slide 25: Newly Discovered Exploits Zone
Newly Discovered Exploits Zone • Recent trenching 1.96 g/t Gold and 160.6 g/t Silver over the entire width of the 22 meter Trench • High grade section of 6.39 g/t Gold and 513.5 g/t silver over 4 meters • Drilling recently completed, 1.54 g/t Gold and 114 g/t silver over 21m • Oxidized Mineralizatio
Slide 26: Soil Terrain
Soil Terrain minimum 450m long with sous up to 1086.5 ppb Au 78.5 ppm Ag 50.9 ppm As 209.8 ppm Sb 2370 ppm Ba 36.32 ppm Hz
Slide 27: Squid East Gold Project
on ae “EXPLOITS TRENCH" including 6.39g/t Au + 513.50g/t Ag + 0.86% Pb / 4.0m $E13-001 1.70g/t Au + 81.78g/t ae + 0.31% Pb / 12.00m SE13-002 ‘ 1.55g/t Au + 114.12g/t Ag + 0.32% Pb / 21.00m including 2.43g/t Au + 185.25g/t Ag + 0.47% Pb / 12.00m SE13-003 i 0.37g/t Au + 39. side Ag + 0.66% Pb / 6.50m
Slide 28: Exploits Zone
-Exploits Zone- Trenching results of 1.96g/t Au and 160.6gA Ag over 22.0m incl. 6.39g/t Au and 513.5g/t Ag over 4.0m Sericite Schist SE13-007 SE13-002 EXPLOITS ZONE - SQUID EAST DRILL SECTION (FACING NORTH) Sten Metals Creek
Slide 29: Gold Zone
Gold/Zone 7,047,750 mN_ 520,250 mE 520,000 mE 519,750 mE 519,500 mE 519,250 mE 519,000 mE NUL OSE BPOL NU 000°8PO'L
Slide 30: Squid East Gold Project – Matson Creek Placer Camp
Squid East Gold Project Matson Creek Placer Camp
Slide 31: Investor Information
Investor Information Nov 2015 Market cap………………………………….…..Cdn $2.6 million Trading symbols……………………………..…TSX:V – MEK Issued and Outstanding……………………….24.6million Current Share Price…………………………...0.105 Website……………………www.metalscreek.com
Slide 32: Officers & Directors
Officers & Directors Sandy Stares, President and CEO and Director Michael MacIsaac, VP Exploration Nick Tsimidis, CFO & Director Wayne Reid, Director Mick Stares, Director Patrick Mohan, Director Malvin Spooner, Director Lorne Woods, Director Darin Wagner, Advisor Richard Nemis, Advisor
Slide 33: Thank You
METALS CREEK RESOURCES MEK TSX-V The Best Place to Look For Gold is in the Shadow of Headframes Thank You Experienced Team, Endless Opportunities
Metals Creek Resources — Investor Presentation (February 2016) on 6ix