Klondex Mines Ltd.

Klondex Mines — Denver Gold Forum 2015

22 slides from Klondex Mines's conference presentation, Sep 23, 2015

  1. Slide 1: Denver Gold Forum, 20-23 September 2015

    DENVER GOLD FORUM, 20-23 SEPTEMBER 2015 TSX : KDX OTCQX : KLNDF 1 WWW.KLONDEXMINES.COM

  2. Slide 2: Forward-Looking Information

    FORWARD-LOOKING INFORMATION Qualified Person (“QP”) Brian Morris, Klondex Mines non-independent QP as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101"), reviewed and is responsible for the technical information contained in this presentation. Cautiona

  3. Slide 3: Our Focus: People, Properties, Profitability

    OUR FOCUS PEOPLE – PROPERTIES – PROFITABILITY OUTPERFORMED 2014 PRODUCTION GUIDANCE BY 25%; ON TRACK FOR DELIVERING IN 2015 PEOPLE • Industry leading safety performance Recovered GEO’s • Experienced, efficient and invested team 140,000 PROPERTIES - Gold and Silver Operations in Nevada 120,000 • Fire

  4. Slide 4: Priding Ourselves on Safety First

    PEOPLE PRIDING OURSELVES ON SAFETY FIRST No Lost Time Accidents at Fire Creek: 1062 days as of September 11, 2015 TSX : KDX OTCQX : KLNDF 4 WWW.KLONDEXMINES.COM

  5. Slide 5: A Strong Leadership and Operations Team

    PEOPLE A STRONG LEADERSHIP AND OPERATIONS TEAM Paul Huet, A.Sc.T. – President, CEO and Director Richard J. Hall, Chairman • 28 yrs of mining experience within North America, • Seasoned mining executive, involved in building and acquiring precious focused on underground narrow vein gold and metals co

  6. Slide 6: Improving the Profitability of Midas

    PEOPLE IMPROVING THE PROFITABILITY OF MIDAS Reducing Dilution Rates Improving Efficiencies Increasing Mineral 400% 250 220 Resources 340% 600 350% 200 300% 500 250% 150 400 110 200% 98 300 140% 100 75 562 150% 200 384 100% 50 268 100 50% 75 0 0 0% Headcount Mobile Pre-KDX 2015 Mineral Pre-KDX KDX Eq

  7. Slide 7: Properties: Low Risk

    PROPERTIES LOW RISK KLONDEX IN NEVADA • Mining-friendly jurisdiction • Low permitting risk • High grades • Low costs – significant operational synergies MIDAS MINE AND MILL • Fully-permitted • Extending mine life • Decreasing dilution; increasing grades • 1,200 tpd mill onsite FIRE CREEK PROJECT • E

  8. Slide 8: Highest Grade Gold Operators in the World

    PROPERTIES - HIGH GRADE HIGHEST GRADE GOLD OPERATORS IN THE WORLD TOP 10 HIGHEST GRADE UNDERGROUND GOLD MINES. Au Grade, g/t 50 45 40 35 30 25 20 15 10 5 0 Fire Creek Macassa Kedrovka Turquoise Toguraci Orcopampa Dvoinoye Pinson Midas Pimenton (South Mine) Ridge http://www.mining.com/the-worlds-high

  9. Slide 9: Increasing Mineral Resources; Increasing M&I

    PROPERTY – HIGH GRADE INCREASING MINERAL RESOURCES; INCREASING M&I 473 +13% M&I FIRE CREEK 287 420 FIRE CREEK MINERAL RESOURCE 428 442 363 DEC-13 DEC-14 JUN-15 526 562 MIDAS +7% M&I 384 MIDAS MINERAL RESOURCE 287 268 75 Gold equivalent ounces represented in thousands JAN-15 AUG-15 MAY-15 Fire Creek

  10. Slide 10: Midas Mine: Disciplined Mining and Expansion

    PROPERTIES - MIDAS MINE DISCIPLINED MINING AND EXPANSION RECENT EXPLORATION Location Elko County, Nevada Mine Type Underground, gold and silver Ownership 100% Proven and Probable 133 koz Reserves 0.55 opt (18.8 g/T) - 242.1 k tons AuEq M&I Mineral Resources 562 koz AuEq (inclusive of reserves) 0.49

  11. Slide 11: Midas Exploration Targets

    PROPERTIES - MIDAS EXPLORATION TARGETS FOLLOW-UP DRILLING ON PREVIOUS DISCOVERIES TSX : KDX OTCQX : KLNDF 11 WWW.KLONDEXMINES.COM

  12. Slide 12: Midas Mill: Simple Processing

    PROPERTIES - MIDAS MILL SIMPLE PROCESSING Capacity: 1,200tpd, Recovery: 94% Au, 95% Ag • Conventional leach technology and Merrill Crowe precipitation Currently Operating Midas Mill at 700 tpd Klondex Mill feed from: • Fire Creek and Midas • Toll milling TSX : KDX OTCQX : KLNDF 12 WWW.KLONDEXMINES.C

  13. Slide 13: Fire Creek Drilling Targets

    PROPERTIES - FIRE CREEK DRILLING TARGETS UPSIDE POTENTIAL TO THE NORTH VEINS OPEN IN ALL DIRECTIONS West Expansion TSX : KDX OTCQX : KLNDF 13 WWW.KLONDEXMINES.COM

  14. Slide 14: Fire Creek Project: High Grade Significant Upside Potential

    PROPERTIES - FIRE CREEK PROJECT HIGH GRADE SIGNIFICANT UPSIDE POTENTIAL Location Lander County, Nevada Mine Type Underground, gold and silver • High-grade Ownership 100% • Ramp access, grid power Proven and Probable 241 koz Reserves 1.3 opt (44.6 g/T) – 185.8 k • Disciplined mining approach AuEq ton

  15. Slide 15: Karen Vein-Drift Long Section

    KAREN VEIN-DRIFT LONG SECTION AVERAGE DILUTED GRADES & WIDTHS FROM FACE SAMPLING WT’D AVG OF 7.9FT WIDE @ SOUTH 5.167 AUEQ OPT OVER 152FT NORTH 5500 Level WT’D AVG OF 10.2FT WIDE @ 3.941 AUEQ OPT OVER 482FT 5450 Level WT’D AVG OF 12.1FT WIDE @ 1.700 AUEQ OPT OVER 698FT 5420 Level WT’D AVG OF 7.8FT W

  16. Slide 16: Strengthening the Balance Sheet

    PROFITABILITY STRENGTHING THE BALANCE SHEET Cash (June 30, 2015) ~ C$68 M ~C$26 million bought deal Closed September 10, 2015 Inventories (June 30, 2015) C$24 M Senior Notes principal @ 11% (June 30, Use of proceeds: C$23 M - Repay Senior Notes principal, saves ~C$4 2015) million of interest expense

  17. Slide 17: AISC Breakdown per Ounce, Six Months Ending June 30, 2015

    PROFITIBILITY - AISC BREAKDOWN PER OUNCE ($US) SIX MONTHS ENDING, JUNE 30, 2015 $1,200 $1,000 $800 $600 $400 $695 $200 $- Production Cost G&A Sustaining Decomissioning Silver Revenues AISC 2015 GUIDANCE AISC: US$750-$800 per gold ounce sold Production Cost: US$575-$625 per GEO Please see slide 22 fo

  18. Slide 18: Continuing to Invest in Our Properties

    PROFITABILITY - CAPITAL ALLOCATION CONTUING TO INVEST IN OUR PROPERTIES TOTAL FY 2015 CAPITAL EXPENDITURE $43 MILLION H2 2015 CAPEX ~$20 million MIDAS MINE AND MILL FIRE CREEK PROJECT (55%) (45%) CAPITAL SPLIT CAPITAL SPLIT 25% 21% 31% 53% 22% 48% Development Drilling Other Development Drilling Othe

  19. Slide 19: Continuing to Deliver on Our Commitments

    KLONDEX – CONTINUING TO DELIVER ON OUR COMMITMENTS Milestones Achieved to Date:  Acquired Midas Mine and Mill – February 2014  First Year of Production, ~108,000 GEO’s – 2014  Secured Financing of ~C$26 million to Eliminate 11% Senior Notes – September 2015  Reported +1 Million AuEq Ounces of M&

  20. Slide 20: For More Information

    FO R M O RE I NFO RM ATI O N: JO HN SEAB E RG O 775-621-5512 M 303-668-7991 JSEABERG@KLONDEXMINES.COM TSX : KDX OTCQX : KLNDF WWW.KLONDEXMINES.COM

  21. Slide 21: Global Reserves and Resources

    GLOBAL RESERVES AND RESOURCES Mineral Reserves Au AuEq Ag Ounces Tons Category Au opt Ag opt Au Eq opt Ounces Ounces (000's) (000's) (000's) (000's) Proven Reserves 1.462 1.108 1.479 118.2 89.6 119.6 80.9 Fire Creek Probable Reserves 1.149 0.787 1.161 120.5 82.6 121.8 104.9 Proven + Probable 1.285 0

  22. Slide 22: Footnotes

    FOOTNOTES Price assumptions in mineral reserves and resources use US dollars unless otherwise stated. All Midas and Fire Creek mineral resources and reserves are prepared by Practical Mining LLC. Mineral resources and mineral reserve estimates have been prepared in accordance with the Canadian Insti

Klondex Mines — Denver Gold Forum 2015 on 6ix