Pure Gold Mining — Investor Presentation (April 2018)
30 slides from Pure Gold Mining's investor presentation, April 2018
Slide 1: Developing Ontario's next gold mine
Developing Ontario’s next gold mine. April 2018 PGM:TSX-V
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on fact, including without limitation, statements regarding the Company’s expectations in respect of its fut
Slide 3: Madsen Gold Project
Pure Gold Mining MADSEN GOLD PROJECT There is a global scarcity of near-term, high grade, quality gold projects in mining friendly jurisdictions. Madsen is one of a select few. We aim to build a long life mine with highly attractive economics. We have a strong foundation. Madsen is extremely well pl
Slide 4: Team, Grade, Jurisdiction
Pure Gold Mining MADSEN GOLD PROJECT TEAM Owners team in place with expert technical knowledge Madsen Project mineral resources – 1,744,000 ozs at 8.7 g/t Gold GRADE in 6.24 Mt Indicated and 296,000 ozs at 7.9 g/t Gold in 1.16 Mt Inferred(1) JURISDICTION Red Lake, Ontario, Canada – an established mi
Slide 5: Company Builders
Pure Gold Mining COMPANY BUILDERS Extensive experience in project execution, operations, exploration, and capital markets with vision to become Canada’s next iconic gold company EXECUTIVE MANAGEMENT BOARD OF DIRECTORS Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Terrane Metals,
Slide 6: Capital Structure
Pure Gold Mining CAPITAL STRUCTURE Capital Structure (as at March 16, 2018) Key Shareholders (2) Shares Outstanding 223.3 million Management & Directors 3.6% Options Outstanding Strategic Shareholders 26.7% Weighted average exercise 18.3 million AngloGold Ashanti 11.4% price $0.38 Evanachan (Robert
Slide 7: Madsen Gold Project - Red Lake Mining District
Red Lake Mining District CANADIAN HIGH GRADE GOLD BELT Madsen Gold Project 2.45 million oz HISTORICAL PRODUCTION (1) 1.74 million oz INDICATED RESOURCE (1) 0.30 million oz INFERRED RESOURCE (1) Current Project Mineral Resources(1): 1,744,000 ozs at 8.7 g/t Gold in 6.24 Mt Indicated 296,000 ozs at 7.
Slide 8: Madsen Development Plan
Red Lake Mining District MADSEN DEVELOPMENT PLAN Production Expansion Exploration MADSEN MINE RUSSET SOUTH / FORK +5km GOLD SYSTEM DFS in progress Two new satellite deposits Multiple targets with near Production decision Open for expansion surface gold mineralization; in Q4 2018 Provides scalability
Slide 9: Low Capital, High Margin
Madsen Gold Project LOW CAPITAL, HIGH MARGIN 2017 PEA(1) Project Attributes High grade 10.3 g/t • • 14 year mine life HEAD GRADE • Low initial capital Low permitting risk 0.91 million • • Scalable operation with potential for expansions OZ GOLD LIFE OF MINE • Skilled workforce, locally sourced ~$51M
Slide 10: Infrastructure in Place
Madsen Gold Project INFRASTRUCTURE IN PLACE 200 m 9
Slide 11: Preliminary Economic Assessment - Initial Capital
Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT Initial Capital (C$50.9M) Low Capital Hurdle Total Initial Capital 50.9 (C$M) Underground Development Sustaining Capital 134.7 $14.3M (C$M) Electrical Mill $2.4M $9.6M Surface $4.8M Contingency $6.6M Mobile Scalable low capital platform Water Venti
Slide 12: Preliminary Economic Assessment - High Margin Detail
Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT High Margin Detail (US$/oz @ US$1,275/oz) Low Cost Profile Power, $66 G&A, $112 Total Cash Cost 595 (US$/oz) Processing, $74 Mining Cost, All-in Sustaining Cash 714 $342 Cost (US$/oz) Sustaining Capital, $118 44% NET FCF Margin (pre-tax) per PEA @
Slide 13: Modern Science Driving Exploration
Madsen Gold Project MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being advanced section 12
Slide 14: Multiple Gold Zones Open for Expansion
Madsen Target Settings MULTIPLE GOLD ZONES OPEN FOR EXPANSION (1) The resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical report “Technical Report for the Madsen Gold Project - Restated Preliminary Economic Assessment and Initial Satellite Deposit Mine
Slide 15: Satellite Deposits - Expansion
Madsen Gold Project SATELLITE DEPOSITS - EXPANSION Satellite Resources 96,000 OZ GOLD INDICATED 118,000 OZ GOLD INFERRED • Both Russet South and Fork deposits outcrop and are wide open for expansion • Both deposits are located approximately 1.5 km from existing milling infrastructure • Offers mine s
Slide 16: Exploration - Wedge Target
Madsen Gold Project EXPLORATION- WEDGE TARGET • Targeted gold structures controlling Madsen and Fork into Wedge Area • 3 km south by road from Madsen milling infrastructure • Highlights:(1) • 33.3 g/t Au over 8.3 m • 21.3 g/t Au over 10.3 m • 25.2 g/t Au over 2.1 m • 22.0 g/t Au over 2.0 m • 27.8 g/
Slide 17: Exploration - Wedge Target
Madsen Gold Project EXPLORATION- WEDGE TARGET • Near surface mineralization in multiple target areas with gold mineralization intersected over a strike distance of 1,000m and to depth of 300m (1) See news release dated October 31, 2016, January 31, 2018 and March 22, 2018 16
Slide 18: Growth Through Exploration
Madsen Gold Project GROWTH THROUGH EXPLORATION 2 NEW SATELLITE DEPOSITS 14 DRILL READY TARGETS 47 KM2 LAND PACKAGE • 3rd largest land package in Red Lake • 10 km of Madsen trend • Controls on mineralization well understood • Wedge Target discovery 17
Slide 19: Emerging Canadian Developer
Madsen Gold Project EMERGING CANADIAN DEVELOPER Development • Definitive feasibility study initiated • 7,200t bulk sample Q2 2018 • Environmental baseline work to support operational permitting • Production decision Q4 2018 Exploration • Surface drilling – identify and extend new zones of gold miner
Slide 20: Appendix
APPENDIX
Slide 21: Benchmarking vs. Peers - Resource Grade
Pure Gold Mining BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 11.53 M&I Resource Grade (g/t Au) 10.0 8.90 8.42 8.41 7.85 8.0 6.16 5.87 6.0 4.0 2.66 1.63 2.0 0.0 (1) (2) (3) Dalradian Pure Gold Osisko Harte Auryn Eastmain Sabina Gold ATAC Midas Gold Inferred Resource Grade 14.0 Inf
Slide 22: Benchmarking vs. Peers - Market Cap
Pure Gold Mining BENCHMARKING VS. PEERS – MARKET CAP Market Cap + Pre-Production Capital $1,100 Market Cap + Capex (C$mm) $850 $806 $771 $604 $576 $600 $350 $272 $261 $176 $100 Sabina Gold Osisko Dalradian Victoria Gold Harte Gold Goldquest Pure Gold Market Capitalization $600 $530 $500 Market Cap (
Slide 23: Current Mineral Resource
Madsen Gold Project CURRENT MINERAL RESOURCE Grade Contained Gold Deposit Classification Tonnes g/t Au (oz.) Madsen Indicated 5,785,000 8.9 1,648,000 Madsen Inferred 587,000 9.4 178,000 Fork Indicated 194,000 6.5 40,000 Fork Inferred 255,000 5.8 47,000 Russet South Indicated 259,000 6.7 56,000 Russe
Slide 24: PEA
Madsen Gold Project PEA 2017 PEA (1) Project Attributes Mineable Resource 3.0 Mt @ 10.3 g/t • Total gold production of ~911,500 Initial CAPEX ounces over a 14 year mine life at an $51 million average diluted head grade of 10.3 g/t gold (1) After-Tax Payback 2.8 years Underground mining operation C
Slide 25: PEA Details
Madsen Gold Project PEA DETAILS Parameters • Underground mining via a combination of conventional cut & fill and shrinkage methods • $50.9 million in pre-production capital costs over a 12-month period Majority of cost for mill upgrades, ramp and surface development New ventilation and dewaterin
Slide 26: Project Enhancement Opportunities
Madsen Gold Project PROJECT ENHANCEMENT OPPORTUNITIES Resource Expansion Potential • Initial satellite deposits add 96,000 ounces indicated, 118,000 ounces inferred - open • Exploration expansion opportunities at Madsen Optimization of Mine Plan • Investigate mechanized cut and fill and long hole mi
Slide 27: Madsen - Starratt Corridor
Madsen Gold Project MADSEN – STARRATT CORRIDOR • 5 kilometre mineralized system • Other targets to develop 26
Slide 28: Near Term Development
Madsen Gold Project NEAR TERM DEVELOPMENT • Underground drilling – de-risk early mine life stopes and test extensions to resources • Results to date confirm resources and expand gold mineralized zones proximal to existing underground infrastructure (1) See news releases dated September 5, 2017, Sept
Slide 29: +5km Mineralized System
Madsen Property +5km MINERALIZED SYSTEM Fork McVeigh Starratt Austin Significant Gold Mineralized System, Scale Potential • Austin open down plunge – • hole AD-11-01 returns 14.3 g/t gold over 2.0 m at 2.1 km vertical depth • Hole PG17-456 returns 34.6 g/t gold over 4.3 m in South Austin at 1.4 km v
Slide 30: Corporate Inquiries
Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca
Pure Gold Mining — Investor Presentation (April 2018) on 6ix