  1. Slide 1: Community Consultative Committee 13th July 2023

    Community Consultative Committee 13th July 2023

  2. Slide 2: Business Arising

    Business Arising a. Liz Wyatt (Stratum Archaeology) to attend June meeting and present on Ashton’s cultural heritage management

  3. Slide 3: Ashton Mine Statistics YTD 2022

    Ashton Mine Statistics YTD 2022 Ashton Coal Key Statistics 2023 Budget 2023 Actual (31.05.2023) (31.05.2023) ROM (Mt) 0.8 0.5 Product Coal (Mt) 0.4 0.3 Total Coal Sales (Mt) 0.4 0.3 Total Recordable Injuries (TRI) 10 2 Total Employees (FTE) 351.6 316 Complaints 0 0 Environmental Incidents 0 0

  4. Slide 4: Current Mining Plan

    7 Current Mining Plan ULLD Seam 2023 to end May As Mined meee" 2023 from June Proposed Mined Pikes Gully Seam 2023 to end May As Mined mummmm= 2023 from June Proposed Mined E +t — 4 L, Stel. 4 Set all ef * | WHEL Sil g = a s = sila — 5 }__} ASHTON UNDERGROUND MINE ne Coal 2023 MINED TO JUNE AND 2023

  5. Slide 5: Environment Monitoring Data

    Environment Monitoring Data  Refer to monitoring data attachment

  6. Slide 6: Complaints and Incidents

    Complaints and Incidents  There have been no community complaints since the last meeting.  Nil environmental incidents YTD.

  7. Slide 7: Environmental Update

    Environmental Update  Monthly noise monitoring undertaken. No issues identified.  Ancillary approvals progressing (Mining Lease, Management Plans etc).  Works are underway on raising the western block banks in Bowman’s Creek.  Bi‐annual aquatic ecology monitoring completed in May • Considerably

  8. Slide 8: Environmental Update

    Environmental Update  Lemington Rd Subsidence Monitoring and Maintenance Program (complete) • A‐Plus Contracting conducted monitoring and maintenance works over a number of months.  Minimal maintenance repairs were completed.  Further works will be communicated ahead of mining in LW207B later in

  9. Slide 9: Environmental Update

    Environmental Update  Archaeological salvage works – LW207A. • Throughout February‐June, our archaeologist (Liz Wyatt) from Stratum Archaeology has been onsite with representatives of the Registered Aboriginal Parties to continue artefact salvage works ahead of mining in LW207A. The current excavat

  10. Slide 10: Ashton-Ravensworth Integration (RUMEx)

    Ashton‐Ravensworth Integration (RUMEx) Modification Applications Update  Management Plan updates to integrate RUMEx ongoing.  Noise Management Plan, Air Quality & Greenhouse Gas Management Plan, Heritage Management Plan and Environmental Management Strategy approved.  Water Management Plan and Fl

  11. Slide 11: IEA Actions

    Condition DA 309-11-2001-i Schedule 3 Condition 12 Schedule S Condition 1 Non-compliance Ashton exceeded the 24-hour PMaothree times between 12 September 2021 and 29 October 2021. These exceedances were reported in the 2021 annual review. The most recent modification of the development consent has n

  12. Slide 12: Condition

    Condition Statement of Compliance Modification 6, Condition 7.1 M2.1 Non-compliance condition, no corrective action is proposed. The bed and bank of Bowmans Creek are required to be surveyed every five years. This assessment was due to be undertaken in 2022, however was delayed until 2023. A non-com

  13. Slide 13: Non-compliance

    Non-compliance Refer to M2.1 for discussion meteorological data capture rate of regarding data capture in 95% for the duration of the Annual relation to the provisions of Return reporting period M24. No further action required. M2.3 One monthly surface water No corrective action 127mm of rainfall ha

  14. Slide 14: Non-compliance

    Non-compliance period finished on 31 December 2019. The Annual returns for 2020 and 2021 reporting period were submitted to the EPA within the 60 day timeframe. No corrective actions are proposed. Corrective action Standard Conditions Mining Regulation 2016 Schedule 8A Part 2 16 (2) 16 (3) DA 309-11

  15. Slide 15: 2023 Ashton Coal Community Support Program

    2023 Ashton Coal Community Support Program  Ashton Community Support Program funded fourteen community groups across the Upper Hunter Valley region, sharing in $85,000.  Funding will help purchase equipment, buy school gear, fund training, upgrade buildings and facilities and run various community

  16. Slide 16: Camberwell update

    Camberwell update  33 Residential Tenancy Agreements  11 Dwellings in Asset Maintenance Program  16 Vacant residential lots  2 Commercial agreements  10 rural areas occupied

  17. Slide 17: Any Questions?

    Any Questions?