  1. Slide 1: ASX cover letter for financial community presentation

    Head office Level 10, TIO Centre, 24 Mitchell St, Darwin NT 0800 GPO Box 2394, Darwin NT 0801, Australia T +61 8 8924 3500 F +61 8 8924 3555 Ranger mine Locked Bag 1, Jabiru NT 0886 Australia T +61 8 8938 1211 F +61 8 8938 1203 www.energyres.com.au ABN 71 008 550 865 A member of the Rio Tinto Group

  2. Slide 2: ERA update

    ERA update For personal use only Rob Atkinson – Chief Executive Steeve Thibeault – Chief Financial Officer November 2012 1

  3. Slide 3: Acknowledge Traditional Owners

    Acknowledge Traditional Owners For personal use only • The mining operations of Energy Resources of Australia Ltd (ERA) are located on Aboriginal land and are surrounded by, but separate from, Kakadu National Park • ERA respectfully acknowledges the Mirarr, Traditional Owners of the land on which th

  4. Slide 4: Forward-looking statement

    Forward-looking statement For personal use only • This presentation has been prepared by Energy Resources of Australia Ltd (“ERA”) and consists of the slides for a presentation concerning ERA. By reviewing/attending this presentation you agree to be bound by the following conditions. Forward-looking

  5. Slide 5: Agenda

    Agenda For personal use only • Safety • People • Mining • Plant • Production profile • Water management • Brine Concentrator • Ranger 3 Deeps • Financial update • Market outlook • Summary 4

  6. Slide 6: Safety performance

    Safety performance • ERA maintained its very strong focus on safety and achieved an All Injury Frequency Rate of 0.61 year to date For personal use only • Five recordable injuries have occurred to date in 2012 – Three Lost Time Injuries (a sprained wrist from an employee slipping in a shower, a stra

  7. Slide 7: Our people

    Our people Indigenous employment For personal use only • ERA is a major employer in the West Arnhem region, and one of the leading employers of Indigenous people in the Northern Territory • As at 31 October – – ERA had 591 employees, which includes 102 Indigenous employees (17%) – 110 female employe

  8. Slide 8: Mining in Pit will be completed in November 2012

    Mining in Pit 3 will be completed in November 2012 For personal use only • All in-situ reserves have been successfully mined • Mine performance in 2012 has been at a high level • Since dewatering the pit, the Mine team have moved material at an annualised rate of 17.2 million tonnes • There is curre

  9. Slide 9: Stockpiles will be the only source of ore from mid 2013

    Stockpiles will be the only source of ore from mid 2013 For personal use only • The ROM stockpiles will be processed by mid 2013 (purple) • Average grade of all stockpiled ore reserves (excluding Waste ROM) is 0.12% U3O8 • From mid 2013, Ranger operations will ROM only mill low grade ore Ore from ex

  10. Slide 10: Ranger production forecast

    Ranger production forecast ERA expects to produce between 3,500 to 3,700 tonnes of uranium oxide in 2012 For personal use only Constant mill rate of 2.0 - 2.4 Mt/pa Post 2016 production is dependent on the outcome of further studies on processing low grade ore and prevailing economic conditions1 Cur

  11. Slide 11: Plant continues to perform strongly

    Plant continues to perform strongly For personal use only • Record levels of plant utilisation, through-put and laterite production • Annual shutdown completed injury free, on time and under budget • Achieved an average 20% reduction in plant operations cash costs per unit since July 2011 • Strong f

  12. Slide 12: Good progress with water management initiatives

    Good progress with water management initiatives For personal use only • Successfully completed Tailings Storage Facility (TSF) 2.3m lift • 200ML/day TSF contingency pumping system installed • 1 GL retention pond constructed, which will provide additional pond water storage capacity • ERA is in a str

  13. Slide 13: Brine Concentrator on schedule and budget

    Brine Concentrator on schedule and budget For personal use only • ERA Board approved the project on 1 February 2012 with estimated expenditure of $220 million • The Brine Concentrator is being provided by HPD LLC, a subsidiary of Veolia Water Solutions and Technologies • Site works on schedule and m

  14. Slide 14: Ranger Deeps projects on schedule

    Ranger 3 Deeps projects on schedule For personal use only Ranger 3 Deeps Date Indicative milestones to production Regulatory approval for exploration decline granted Commenced box cut excavation Decline tunnel construction commences Ranger 3 Deeps mine referral January 20131 submitted to government

  15. Slide 15: Ranger Deeps exploration decline tunnel underway

    Ranger 3 Deeps exploration decline tunnel underway For personal use only Commencement of construction of the underground exploration decline tunnel • The project is on time and on budget • Construction of the decline tunnel commenced in early November and it is expected to be ~100 metres further adv

  16. Slide 16: Exploration update

    Exploration update For personal use only • Exploration drilling since July 2012 – Drilling concentrated at Ranger 18, Ranger 19, and Georgetown • Significant results HOLE ID PROJECT INTERVAL FROM WIDTH GRADE UNIT R19PD52 R19 3 656 5 0.102 Chem Ranger 19 R19PD52 R19 4 667 10 0.243 Chem R19PD52*** R19

  17. Slide 17: Long term market outlook encouraging

    Long term market outlook encouraging For personal use only • Near term market will be challenging – Japan’s slow recovery is expected to keep market quiet in the near term: • Two reactors operating at present time, however limited restarts may occur in near future • It appears unlikely that Japan wi

  18. Slide 18: Financials

    Financials For personal use only • The rehabilitation provision is currently being reviewed as part of the Integrated Tailings, Water and Closure Prefeasibility Study. The assessment will be disclosed in ERA’s 2012 full year results • In 2012, ERA purchased a total of 500 tonnes of spot material to

  19. Slide 19: Strategic focus

    Strategic focus For personal use only • Continue to strengthen relationship with the GAC and Mirarr • Demonstrate successful treatment of water • Commence progressive rehabilitation on key areas on Ranger Project Area • Reduce footprint of our operations • Transition from open pit mining to a potent

  20. Slide 20: Summary

    Summary For personal use only • Continued strong safety and environmental performance • Pit 3 ahead of schedule and will be completed in November 2012. Backfilling of Pit 3 will commence in December 2012 • Water management initiatives continue to be successfully implemented • 2012 production of uran

  21. Slide 21: Strategic project milestones

    Strategic project milestones For personal use only 2012 2013 2014 Project N D J F M A M J J A S O N D J F M A M J J A S O N D Ranger Project Area Exploration Ranger 3 Deeps exploration decline construction Ranger 3 Deeps exploration decline drilling Ranger 3 Deeps mine prefeasibility study Ranger 3

  22. Slide 22: Ranger Deeps exploration decline

    Ranger 3 Deeps exploration decline For personal use only Brine Concentrator Ranger 3 Deeps exploration decline 21

  23. Slide 23: Ranger mine

    Ranger mine For personal use only Ranger 3 Deeps exploration decline Brine Concentrator 22

  24. Slide 24: For personal use only

    Pit 3 z al £ ir gS £ 3 s < = ° an o o g Ss ° an o oe > OD we o i wu