Lion Copper Corp. · CSE:LCU
Lion Copper — Lion Copper and Gold — Investor Presentation (November 2021)
29 slides from Lion Copper's investor presentation, November 2021

Slide 1: A Copper-Gold Exploration & Development Company
A COPPER-GOLD EXPLORATION & DEVELOPMENT COMPANY Copper exploration and development for tomorrow’s clean energy future TSX-V: LEO | OTCQB: LCGMF www.lioncg.com INVESTOR PRESENTATION November 2021 TSX-V: LEO | OTCQB: LCGMF 1

Slide 2: Cautionary Notes to US Persons & Forward-Looking Statements Disclaimer
Cautionary Notes to US Persons & Forward- Looking Statements Disclaimer The information contained in this presentation is provided solely for general knowledge purposes. This presentation is not intended to be a comprehensive review of all matters and developments concerning the Company and we assum

Slide 3: Properties
Properties PIPELINE PROJECT FLAGSHIP PROJECT Chaco Bear Property MacArthur Copper BC, Canada Mason Valley, Nevada PIPELINE PROJECT Ashton Property BC, Canada Yerington Deposit Bear Deposit Butte Valley Mason Valley, Nevada Ely, Nevada 3

Slide 4: Lion CG: Clean Energy Begins with Copper
Lion CG: Clean Energy Begins with Copper Canadian-based company advancing the MacArthur Copper Project in Mason Valley, Nevada, in addition to exploration projects including the Chaco Bear and Ashton properties in British Columbia, Canada. TSX-V: LEO | OTCQB: LCGMF 4

Slide 5: Corporate Profile
Corporate Profile AS AT OCT. 30 2021 SHARE MARKET CAP PRICE 12-MONTH HIGH/LOW 30 DAY AVG VOL OTCQB: LCGMF US$38.5M US$0.13 US$0.24/$0.04 300,000 TSX-V: LEO C$47.4M C$0.16 C$0.30/$0.05 320,000 SHARES OUT FULLY DILUTED OPTIONS WARRANTS SHARE STRUCTURE 296 Million 401 Million 21.6 Million 83 Million (w

Slide 6: Management & Directors
Management & Directors EXPERIENCE & VISION C. Travis Naugle, P.E. CEO, DIRECTOR Seasoned executive and officer in the gold, copper and strategic mining sector. Industrial track record includes the Kupol mine project for Bema Gold (sold to Kinross for $3 billion), the Kensington mine project for Coeu

Slide 7: Mason Valley Copper Projects
Mason Valley Copper Projects MASON VALLEY IS THE SITE OF A LARGE, HISTORIC COPPER CAMP IN A PREMIER JURISDICTION 50 MILES SOUTH-EAST OF RENO, NEVADA • The MacArthur Project represents the advancement of a large oxide copper deposit toward the production of pure cathode copper. • In addition to the o

Slide 8: Positive Positioning of the MacArthur Project
Positive Positioning of the MacArthur Project COMMUNITY SUPPORT Local mining experience, supportive local, tribal, state and federal governments CENTRAL POSITION IN THE DISTRICT Strategic for mine development & district consolidation EXCELLENT LOCATION For plant, equipment, earthen facilities; acces

Slide 9: MacArthur Copper Deposit
MacArthur Copper Deposit A LARGE-SCALE, LOW-COST HEAP LEACH PROJECT WITH POTENTIAL FOR NEAR TERM PRODUCTION OF PURE COPPER CATHODE COPPER OXIDE 676M lbs M&I Resource at 0.21%* 980M lbs Inferred Resource at 0.20%* (Cutoff grade %TCu: Oxide 0.12) Source: MacArthur Copper Project 2012 Preliminary Econo

Slide 10: MacArthur Copper Deposit Resources
MacArthur Copper Deposit Resources OXIDE AND CHALCOCITE MATERIAL PRIMARY MATERIAL Cutoff Contained Cutoff Avg. Contained Tons Avg. Grade Tons COPPER Grade (x1000) (%Tcu) Copper Grade (%Tcu) (x1000) Grade Copper RESOURCES (%Tcu) (lbs x 1000) (%Tcu) (lbs x 1000) 0.25 29,589 0.364 217,075 0.25 507 0.41

Slide 11: MacArthur Project Pre-Feasibility Study (PFS)
MacArthur Project Pre-Feasibility Study (PFS) TARGETING THE COMPLETION OF THE PFS BY Q3 2022 ► ESG Focus ► Update Resource Model ► Enhance Metallurgical Approaches ► Higher Prices in the Copper Cycle ► Optimize the Production Schedule ► Permitting & Execution Plan Drilling at the MacArthur Project T

Slide 12: MacArthur 2021 Drill Program
MacArthur Pro2021 Drill Program OBJECTIVES: ▶ Upgrade oxide resources to M&I ▶ Expand oxide resource ▶ Further explore sulfide targets ▶ Obtain representative metallurgical sample for PFS ▶ Updated resource estimate in Q1 2022 TSX-V: LEO | OTCQB: LCGMF 12

Slide 13: MacArthur Sulfide Upside Potential
MacArthur Sulfide Upside Potential SULFIDE DEPOSIT UNDERLYING THE OXIDE CAP OFFERS OPPORTUNITY FOR EXPANSION N Mineralization open at depth: 16 holes bottomed in >0.25% Cu sulfide High grade sulfide mineralization open to the north: Northernmost hole QM-164 intersected 64 ft av 1.31% Cu @1,673ft (In

Slide 14: Chaco Bear Property and Ashton Property
PIPELINE PROJECT Chaco Bear Property BC, Canada PIPELINE PROJECT Ashton Property BC, Canada 14

Slide 15: BC Copper-Gold Prospects
BC Copper-Gold Prospects PARALLEL TO METAL-RICH SYSTEMS THROUGHOUT THE PACIFIC RIM Evidence of all 3 distinct ore systems on both properties: 1. Porphyry Copper-Gold 2. High-Sulphidation Epi- Mesothermal Copper-Gold 3. Porphyry related Low Sulphidation Epi- Mesothermal Gold THESE SYSTEMS OF ORE DEPO

Slide 16: Chaco Bear: Regional Geology
Chaco Bear REGIONAL GEOLOGY GOLDEN TRIANGLE STRIKING SIMILARITIES BETWEEN THE ESKAY CREEK AND CHACO BEAR LITHOLOGIES COPPER CORRIDOR TSX-V: LEO | OTCQB: LCGMF 16

Slide 17: Chaco Bear
Chaco Bear Location: – Northern B.C., Driftwood River, Bear Lake Area Andesite flows and tuffs Geological Info: – Located within the Stikine Terrane – Mineralization hosted by the Telkwa Rusty Lake: Formation of the Hazelton Group, separated Highest stream from the younger Hazelton formations by a s

Slide 18: Chaco Bear: Primary Exploration Targets
Chaco Bear PRIMARY EXPLORATION TARGETS • Eskay Creek type mineralization east (above) rhyolite unit • Epithermal Gold at Round Lake • Epithermal Gold & Base Metals at Dave/Ron & BearNx Zones • Step-outs at Coccola - drill intercepts with Cu/Au mineralization in rhyolite • Porphyry Copper near Rusty

Slide 19: Ashton
Ashton PORPHYRY COPPER GOLD POTENTIAL Location: • Within 10 km of Lytton in southern BC • Spences Bridge Gold Belt • 19 km south of Spences Bridge on the east bank of the Thompson River • Within a few hundred meters of the Trans‐Canada Highway and the mainline of the Canadian Pacific Railway History

Slide 20: Ashton: Spences Bridge Gold Belt
Ashton SPENCES BRIDGE GOLD BELT TSX-V: LEO | OTCQB: LCGMF 20

Slide 21: Ashton: Going Forward Exploration Strategy
Ashton GOING FORWARD – EXPLORATION STRATEGY ► Additional geological mapping and surface prospecting ► Further mapping and surface sampling will be focused on the southern portion of the Ashton Project where there are extensive gold in soil anomalies ► Drilling to evaluate a potential gold skarn ► Th

Slide 22: www.lioncg.com
LION COPPER & GOLD CORP. Corporate Communications info@lioncg.com (778) 898-0057 www.lioncg.com TSX-V: LEO | OTCQB: LCGMF TSX-V: LEO | OTCQB: LCGMF 22

Slide 23: Mason Valley Properties
APPENDIX A Mason Valley Properties • Besides the flagship MacArthur Project, the 51 mi. sq. land package includes a portfolio of deposits with brownfields redevelopment opportunity, significant exploration upside: – Yerington pit with sulfide and oxide resources* and potential for expansion – Bear p

Slide 24: Bear Copper Deposit
APPENDIX A Bear Copper Deposit ► Discovered 1961 by Anaconda through condemnation drilling ► Partially delineated by Anaconda in the 1960s and Phelps Dodge in the 60s and 70s; but never consolidated ► Lion CG has data from 49 historic holes totaling 126,400 feet defining a system covering 3 to 4 sq.

Slide 25: Bear Copper Deposit
APPENDIX A Bear Copper Deposit SIX HOLES DRILLED FOR TOTAL OF 20,274 FEET (2015-16) B-052 B-049 ► B-048 supported historic assays from Hole 23B by Anaconda in 1966 B-051 B-050 ► Four step-out holes (B-049 to B052) extended known mineralization 2,000 ft N-NE by 3,000 ft B-048 NW-SE ► Mineralized inte

Slide 26: Yerington Pit
APPENDIX A Yerington Pit • The Yerington deposit includes 11 sq. mi. of patented claims and fee mineral properties centered on the former Anaconda open pit copper mine. • SPS commenced exploration on the Yerington deposit with a drilling program comprising 21,856 feet in 42 holes during the last Pit

Slide 27: Mason Valley Copper Resources
APPENDIX A Mason Valley Copper Resources* Deposit Date Ox/S Category Cu c/o Tons x1000 Avg Grade Lbs Cu x1000 Measured 0.15 31,000 0.33 205,000 YERINGTON S Indicated 0.15 74,000 0.30 428,000 Nov Inferred 0.15 128,000 0.23 600,000 2013 Measured 0.12 6,500 0.25 33,000 O Indicated 0.12 17,000 0.25 85,0

Slide 28: Butte Valley, Nevada
APPENDIX B Butte Valley, Nevada ► Large potential, based on Butte Valley amplitude of magnetic anomaly, size of IP anomaly and volume of alteration system drilled to date ► Near the Robinson porphyry copper deposit held by KGHM ► 38 miles NNW of Ely, Nevada ► 21 square miles of claims Ely Robinson P

Slide 29: Groundhog Copper Prospect, SW Alaska
APPENDIX C Groundhog Copper Prospect, SW Alaska Groundhog differs from other Alaska resource projects through an advantageous ownership structure and indigenous participation through Kijik Corp, the nearby village corporation formed under the Alaska Native Claims Settlement Act 58,800 acres immediat
Source: Internet Archive copy of lioncg.com
More decks from Lion Copper Corp.
Investor Presentation (November 2026)21 slides · November 2026
Investor Presentation (October 2026)21 slides · October 2026
Investor Presentation (October 2026)20 slides · October 2026
Investor Presentation (September 2026)20 slides · September 2026
Corporate Update (November 2022)7 slides · Nov 14, 2022
Investor Presentation (January 2022)18 slides · January 2022