Winshear Metals Corp. · TSXV:WINS

Winshear Metals — Investor Presentation (March 2026)

20 slides from Winshear Metals's investor presentation, March 2026

  1. Slide 1: Focused on Discovery

    FOCUSED ON DISCOVERY TSX-V: WINS, FRA:9HR March 2026

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation may contain forward looking statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements

  3. Slide 3: Our Projects

    Our Projects PORTSOY Nickel – Copper – Cobalt Project – Aberdeenshire, Scotland • Option to earn a 100% interest from Peak Nickel Ltd • Near surface, massive sulphide mineralisation • Multiple drill targets • 24 drill holes completed in 2023 / 2024 confirm continuity along strike and to depth • Dril

  4. Slide 4: Corporate Structure

    Corporate Structure Shares Issued 69,251,965 Warrants 6,655,667 (at $0.12) Warrants 12,959,000 (at $0.20) Stock Options 3,700,000 (at $0.13) Fully Diluted 92,566,632 Massive sulphide mineralisation from the TSX-V: WINS, FRA:9HR Rodburn Target, Portsoy Project, Scotland 4

  5. Slide 5: Portsoy Ni-Cu-Co Project – 250km2

    Portsoy Ni-Cu-Co Project – 250km2 JORC Exploration Target +10-20Mt grading 1% - 2% NiEq at Rodburn Target • High-grade critical metals project in Scotland - good jurisdiction, excellent infrastructure • Discovered early 1970s by Rio / Goldfields JV – no work for 50 years • Massive and semi-massive s

  6. Slide 6: Portsoy Project

    Portsoy Project • Inverness to Aberdeen railway runs through the project area Inverness Rodburn • Main road within 5 miles of the Rodburn target • One hour drive from Aberdeen Airport Aberdeen • Easy access to nickel smelters in Scandinavia RBD018 TSX-V: WINS, FRA:9HR 6

  7. Slide 7: Portsoy Project – Key Points

    Portsoy Project – Key Points • Mining projects get permitted in the UK, e.g. Woodsmith (polyhalite), Hemerdon (tungsten-tin), South Crofty (tin), and Cononish (gold). • 250km2 exploration licence over numerous regional targets • 100-year mining rights on the farms hosting the Rodburn target and stri

  8. Slide 8: Rodburn Target - 2023/2024 Drill Program

    Rodburn Target - 2023/2024 Drill Program Hole ID From (m) Length (m) Ni (%) Cu (%) Co (ppm) % NiEq RBD001 40.52 12.48 0.63 0.54 403 0.97 incl. 45.00 6.00 0.96 0.73 601 1.42 RBD002 50.60 35.40 0.71 0.30 473 0.93 incl. 70.00 12.00 1.42 0.54 929 1.82 RBD003 103.94 14.06 0.34 0.40 242 0.58 incl. 114.00

  9. Slide 9: Rodburn Target

    Rodburn Target RBD002: 12.0m @ 1.42% Ni, 0.54% Cu, 0.09% Co (1.82% NiEq) from 70.0m RBD009: 13.8m @ 1.76% NiEq from 51.6m incl. 5.4m @ 2.04% Ni, 0.56% Cu, 0.10% Co (2.46% NiEq) from 60m TSX-V: WINS, FRA:9HR 9

  10. Slide 10: Rodburn Target

    Rodburn Target TSX-V: WINS, FRA:9HR 10

  11. Slide 11: Rodburn Target

    Rodburn Target • Two mineralised zones drilled to date (the South and North Zones) • Geologically similar & 600m apart • Both zones wide open • More drilling needed to test true strike & down-dip potential • Geochemical & geophysical signatures indicate structures are over 3km long • Numerous other

  12. Slide 12: Rodburn Target

    Rodburn Target North Zone - Section C-D South Zone – Section A-B TSX-V: WINS, FRA:9HR 12

  13. Slide 13: Rodburn Target – 2026 planned drilling

    Rodburn Target 2026 planned drilling Section X-Y TSX-V: WINS, FRA:9HR 13

  14. Slide 14: Portsoy Project Summary

    Portsoy Project Summary • Geochem anomalies indicate district-scale potential for Ni-Cu-Co mineralisation • Rodburn is the most advanced / highest grade Ni-Cu-Co target in the UK • Drilling indicates potential for a large near- surface Ni-Cu-Co resource • Exploration and mineral rights secured – 100

  15. Slide 15: Thunder Bay Gold Project

    Thunder Bay Gold Project • Eastern extension of the Archaean Shebandowan Greenstone Belt • Very little historic exploration • Excellent infrastructure • Potential for orogenic gold, volcanogenic massive sulphide, and Ni-Cu-Co-PGE deposits TSX-V: WINS, FRA:9HR 15

  16. Slide 16: Thunder Bay Gold Project - Geology

    Thunder Bay Gold Project - Geology 40km x 5km Timiskaming-like pull-apart basin in the Older Greenwater Shebandowan Greenstone Belt Assemblage (dashed line) Kashabowie Group 2690Ma (Felsic and Komatiitic Volcanics) Shebandowan Group 2670-2680Ma (Coarse Sediments, Alkaline Volcanics and Felsic Intrus

  17. Slide 17: Thunder Bay Gold Project - Location

    Thunder Bay Gold Project - Location MOSS LAKE GOLD PROJECT EUREKA GOLD PROJECT THUNDER BAY GOLD • Ind. Resource – 1.5 Moz at 1.23 g/T Au Geologic Target PROJECT AREA • Inf. Resource – 5.2 Moz at 1.11 g/T Au 60 Mt at +1g/T Au Shebandowan Structural Zone 25 km TSX-V: WINS, FRA:9HR 17

  18. Slide 18: Phase 1 Till Sampling – Inflection Target

    Phase 1 Till Sampling – Inflection Target Inflection is located at the intersection of several major structures and along the southern margin of a rigid granite body TSX-V: WINS, FRA:9HR 18

  19. Slide 19: Board and Management

    Board and Management Stephen Leahy - Chairman Former CEO & Chairman of North American Tungsten, Director of Oroco Resource Corp Richard Williams - CEO & Director Co-Founder of Winshear, former CEO & Director of Cornish Metals Patricio Varas - President & Director Former CEO of Western Potash, and ex

  20. Slide 20: Thank You

    THANK YOU for further inquiries please contact: Richard Williams richard@winshear.com winshear.com TSX-V: WINS, FRA:9HR

Winshear Metals — Investor Presentation (March 2026) on 6ix