Winshear Metals Corp. · TSXV:WINS
Winshear Metals — Investor Presentation (March 2026)
20 slides from Winshear Metals's investor presentation, March 2026
Slide 1: Focused on Discovery
FOCUSED ON DISCOVERY TSX-V: WINS, FRA:9HR March 2026
Slide 2: Forward Looking Statements
Forward Looking Statements This presentation may contain forward looking statements which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements
Slide 3: Our Projects
Our Projects PORTSOY Nickel – Copper – Cobalt Project – Aberdeenshire, Scotland • Option to earn a 100% interest from Peak Nickel Ltd • Near surface, massive sulphide mineralisation • Multiple drill targets • 24 drill holes completed in 2023 / 2024 confirm continuity along strike and to depth • Dril
Slide 4: Corporate Structure
Corporate Structure Shares Issued 69,251,965 Warrants 6,655,667 (at $0.12) Warrants 12,959,000 (at $0.20) Stock Options 3,700,000 (at $0.13) Fully Diluted 92,566,632 Massive sulphide mineralisation from the TSX-V: WINS, FRA:9HR Rodburn Target, Portsoy Project, Scotland 4
Slide 5: Portsoy Ni-Cu-Co Project – 250km2
Portsoy Ni-Cu-Co Project – 250km2 JORC Exploration Target +10-20Mt grading 1% - 2% NiEq at Rodburn Target • High-grade critical metals project in Scotland - good jurisdiction, excellent infrastructure • Discovered early 1970s by Rio / Goldfields JV – no work for 50 years • Massive and semi-massive s
Slide 6: Portsoy Project
Portsoy Project • Inverness to Aberdeen railway runs through the project area Inverness Rodburn • Main road within 5 miles of the Rodburn target • One hour drive from Aberdeen Airport Aberdeen • Easy access to nickel smelters in Scandinavia RBD018 TSX-V: WINS, FRA:9HR 6
Slide 7: Portsoy Project – Key Points
Portsoy Project – Key Points • Mining projects get permitted in the UK, e.g. Woodsmith (polyhalite), Hemerdon (tungsten-tin), South Crofty (tin), and Cononish (gold). • 250km2 exploration licence over numerous regional targets • 100-year mining rights on the farms hosting the Rodburn target and stri
Slide 8: Rodburn Target - 2023/2024 Drill Program
Rodburn Target - 2023/2024 Drill Program Hole ID From (m) Length (m) Ni (%) Cu (%) Co (ppm) % NiEq RBD001 40.52 12.48 0.63 0.54 403 0.97 incl. 45.00 6.00 0.96 0.73 601 1.42 RBD002 50.60 35.40 0.71 0.30 473 0.93 incl. 70.00 12.00 1.42 0.54 929 1.82 RBD003 103.94 14.06 0.34 0.40 242 0.58 incl. 114.00
Slide 9: Rodburn Target
Rodburn Target RBD002: 12.0m @ 1.42% Ni, 0.54% Cu, 0.09% Co (1.82% NiEq) from 70.0m RBD009: 13.8m @ 1.76% NiEq from 51.6m incl. 5.4m @ 2.04% Ni, 0.56% Cu, 0.10% Co (2.46% NiEq) from 60m TSX-V: WINS, FRA:9HR 9
Slide 10: Rodburn Target
Rodburn Target TSX-V: WINS, FRA:9HR 10
Slide 11: Rodburn Target
Rodburn Target • Two mineralised zones drilled to date (the South and North Zones) • Geologically similar & 600m apart • Both zones wide open • More drilling needed to test true strike & down-dip potential • Geochemical & geophysical signatures indicate structures are over 3km long • Numerous other
Slide 12: Rodburn Target
Rodburn Target North Zone - Section C-D South Zone – Section A-B TSX-V: WINS, FRA:9HR 12
Slide 13: Rodburn Target – 2026 planned drilling
Rodburn Target 2026 planned drilling Section X-Y TSX-V: WINS, FRA:9HR 13
Slide 14: Portsoy Project Summary
Portsoy Project Summary • Geochem anomalies indicate district-scale potential for Ni-Cu-Co mineralisation • Rodburn is the most advanced / highest grade Ni-Cu-Co target in the UK • Drilling indicates potential for a large near- surface Ni-Cu-Co resource • Exploration and mineral rights secured – 100
Slide 15: Thunder Bay Gold Project
Thunder Bay Gold Project • Eastern extension of the Archaean Shebandowan Greenstone Belt • Very little historic exploration • Excellent infrastructure • Potential for orogenic gold, volcanogenic massive sulphide, and Ni-Cu-Co-PGE deposits TSX-V: WINS, FRA:9HR 15
Slide 16: Thunder Bay Gold Project - Geology
Thunder Bay Gold Project - Geology 40km x 5km Timiskaming-like pull-apart basin in the Older Greenwater Shebandowan Greenstone Belt Assemblage (dashed line) Kashabowie Group 2690Ma (Felsic and Komatiitic Volcanics) Shebandowan Group 2670-2680Ma (Coarse Sediments, Alkaline Volcanics and Felsic Intrus
Slide 17: Thunder Bay Gold Project - Location
Thunder Bay Gold Project - Location MOSS LAKE GOLD PROJECT EUREKA GOLD PROJECT THUNDER BAY GOLD • Ind. Resource – 1.5 Moz at 1.23 g/T Au Geologic Target PROJECT AREA • Inf. Resource – 5.2 Moz at 1.11 g/T Au 60 Mt at +1g/T Au Shebandowan Structural Zone 25 km TSX-V: WINS, FRA:9HR 17
Slide 18: Phase 1 Till Sampling – Inflection Target
Phase 1 Till Sampling – Inflection Target Inflection is located at the intersection of several major structures and along the southern margin of a rigid granite body TSX-V: WINS, FRA:9HR 18
Slide 19: Board and Management
Board and Management Stephen Leahy - Chairman Former CEO & Chairman of North American Tungsten, Director of Oroco Resource Corp Richard Williams - CEO & Director Co-Founder of Winshear, former CEO & Director of Cornish Metals Patricio Varas - President & Director Former CEO of Western Potash, and ex
Slide 20: Thank You
THANK YOU for further inquiries please contact: Richard Williams richard@winshear.com winshear.com TSX-V: WINS, FRA:9HR