Northern Star Resources Ltd · ASX:NST

Northern Star Resources — Corporate Update (November 2023)

23 slides from Northern Star Resources's corporate update, Nov 21, 2023

  1. Slide 1: Exploration Market Update

    Exploration Market Update November 2023

  2. Slide 2: Forward Looking Statements and Disclosures

    Forward Looking Forward Looking Statements Statements and Northern Star Resources Limited has prepared this announcement based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or Disclosures correctness of the infor

  3. Slide 3: Presentation team

    Presentation team Steven McClare Chief Technical Officer Mr McClare is a mining engineer with over 30 years of technical, operational and project experience in the mining industry. His extensive career includes building multi-billion dollar caving projects and bringing mines from design through to p

  4. Slide 4: Our framework to generate superior returns

    Our framework to _ generate superior returns Our Purpose To generate superior returns for our shareholders Generate superior returns while providing positive benefits for our stakeholders through operational effectiveness, exploration and Strong cash flow generation active portfolio management World

  5. Slide 5: Exploration drives optionality across all production centres

    Exploration drives optionality _ across all production centres A$ 150M FY24 exploration guidance ALASKA Pogo +130,000m AUSTRALIA FY24 drill metres (to date) Yandal Kalgoorlie increased organic growth optionality 5

  6. Slide 6: Organic growth across the Group

    Organic growth across the Group _ geology a key value driver 20.2Moz 57.4Moz Ore Mineral Reserves Resources + A$ 10YR 31/OZ Reserve-backed Cost of Resource production profile additions 6

  7. Slide 7: Kalgoorlie Production Centre

    Kalgoorlie Production Centre _ a dominant and growing pillar KALGOORLIE PRODUCTION CENTRE KCGM Carosue Dam Operations FY23 GOLD SOLD MINERAL RESOURCE ORE RESERVE Kalgoorlie Operations Rest of Rest of Rest of KCGM Group Group Group KCGM KCGM CDO Kal CDO Ops Kal Kal CDO Ops Ops 7

  8. Slide 8: KCGM a key global gold asset

    KCGM _ a key global gold asset 28Moz Mineral Resource 12Moz Ore Reserve +20Years Mine Life 65Moz gold mined over 130 years 8

  9. Slide 9: KCGM Oroya Brownhill (East Wall) cutback

    KCGM _ Oroya Brownhill (East Wall) cutback 3Yrs 5Yrs KCGM: FY25-26 Lower Material Movement (Fimiston South Waste Elevated cutback only) Movement Gold Grades Strip ratio reduces to ~7:1 ▪ Expected completion late FY24 ▪ Enables access to ~1.6Moz gold ▪ 1.2Moz Golden Pike North (~1.8g/t) ▪ 0.4Moz OBH

  10. Slide 10: KCGM growing underground feed

    KCGM _ growing underground feed KCGM Underground Resources 10 8 Ounces (Moz) 6 4 2 0 FY20 FY21 FY22 FY23 Mt Charlotte Fimiston UG Exploration success enables platform for production growth 10

  11. Slide 11: KCGM significant ore feed optionality

    KCGM _ significant ore feed optionality EXPLORATION FEASIBILITY DEVELOPMENT PRODUCTION OPEN PIT OPEN PIT OPEN PIT OPEN PIT FIMISTON BLC Mt Percy Fimiston South Oroya Brownhill PROCESSING Naruto Red Hill Stage 2 Fimiston South Stage 1 PLANT Golden Pike North Hannans North 13Mtpa Hercules TODAY UNDERG

  12. Slide 12: Yandal Production Centre

    Yandal Production Centre _ regional optionality YANDAL PRODUCTION CENTRE Jundee Thunderbox (TBO) FY23 GOLD SOLD MINERAL RESOURCE ORE RESERVE TBO TBO TBO Rest of Rest of Jundee Rest of Jundee Group Group Group Jundee 12

  13. Slide 13: Yandal hub strategy

    Yandal _ hub strategy 14Moz Yandal gold mined over 30 years 9.8Moz 3.8Moz 9Mtpa MILLING Mineral Resource Ore Reserve CAPACITY Jundee 5.4Moz 1.5Moz 3Mtpa 3.6g/t MILLING Mineral Resource Ore Reserve CAPACITY Thunderbox 4.4Moz 2.3Moz 6Mtpa 1.8g/t MILLING Mineral Resource Ore Reserve CAPACITY 13 The Bro

  14. Slide 14: Jundee the mine that keeps on giving

    Jundee _ the mine that keeps on giving 5.4Moz Mineral Resource 1.5Moz Ore Reserve +10Years Mine Life 14

  15. Slide 15: Jundee long-life, low-cost mine

    Jundee _ long-life, low-cost mine EXPLORATION FEASIBILITY DEVELOPMENT PRODUCTION MILL FEED Gateway South Griffin UG Barton JUNDEE MINE Extension 2Mtpa Zodiac Deakin Jundee Northern South Underground Deeps Cook UG Armada Atlantis SATELLITE FEED 1Mtpa Millrose Vause Ramone LEGEND Ziggy UNDERGROUND OPE

  16. Slide 16: Thunderbox growing future feed sources FY24 - FY25 +FY26

    Thunderbox _ growing future feed sources FY24 - FY25 +FY26 EXPLORATION FEASIBILITY DEVELOPMENT PRODUCTION MILL FEED PRODUCTION MILL FEED THUNDERBOX MINE THUNDERBOX THUNDERBOX D ZONE STOCKPILE A Zone 4Mtpa 2Mtpa Cutback THUNDERBOX THUNDERBOX UNDERGROUND UNDERGROUND Golder Sundowner JV* ORELIA ORELIA

  17. Slide 17: Thunderbox mill feed sequencing

    Thunderbox _ mill feed sequencing Production Areas FY24 FY25 FY26 FY27 FY28 FY29 FY30 Underground Thunderbox Wonder Open Pit TBO Zone D Orelia Otto Bore Bannockburn Stockpiles Reserve Stockpiles 17 *Northern Star has 70% interest in Sundowner JV.

  18. Slide 18: Thunderbox Wonder remains open at depth

    Thunderbox _ Wonder remains open at depth ▪ The Wonder complex is 25km south of the Thunderbox processing plant ▪ Wonder UG commenced FY24, Resource of 920koz, Reserve of 590koz ▪ Golden Wonder discovery continued to deliver impressive results including 15.5m @ 2.6g/t ,170m below the current Mineral

  19. Slide 19: Pogo Production Centre

    Pogo Production Centre _ preparing for the next decade FY23 GOLD SOLD MINERAL RESOURCE ORE RESERVE Pogo Pogo Pogo Rest of Rest of Rest of Group Group Group 19

  20. Slide 20: Pogo preparing for the next decade

    Pogo _ preparing for the next decade 7.3Moz ▪ High-grade Resource +10g/t; Reserve at Mineral Resource 8.5g/t ▪ Lowering costs through 1.6Moz Ore Reserve growth and optimisation ▪ In-mine and near regional +10Years Mine Life opportunity 4.8Moz gold mined over 17 years 20

  21. Slide 21: Pogo entering a new exploration phase

    Pogo _ entering a new exploration phase ▪ Star, 1.3km south of Pogo, comprises a Liese-style quartz vein system ▪ Expanded mineralised footprint to 1.1km by 450m ▪ FY24 geology interpretation and economic assessment ▪ FY25 targeted infill drilling program to quantify resource potential 21

  22. Slide 22: Our commitment to our profitable growth plan

    Our commitment to _ our profitable growth plan SUSTAINABLE 2.00Moz 1.8-2.2Moz BUSINESS KALGOORLIE 1.1Moz 3–5 of which PRODUCTION CENTRES 1.75Moz KCGM 650koz KCGM 900koz to Grade increase at KCGM Mill Expansion 1.8–2.2Moz GOLD SOLD 1.60Moz YANDAL 600koz 1st Half Realising full potential COST CURVE PO

  23. Slide 23: Northern Star a global gold leader

    Northern Star _ a global gold leader Geology drives organic Investor Enquiries: Sophie Spartalis T: +61 8 6489 2488 E: investorrelations@nsrltd.com value creation W: www.nsrltd.com 23

Northern Star Resources — Corporate Update (November 2023) on 6ix