  1. Slide 1: Pivotal Energy Development

    Pivotal Energy Development Dana Grams President, Pivotal Energy Development 1

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Statements in this presentation that are not historical facts, including statements regarding our estimates, beliefs, expectations, intentions, strategies or projections, may be “forward-looking statements” as defined in the Private Securities Litigation Reform Act of 1995

  3. Slide 3: Non-GAAP Measures

    Non-GAAP Measures Company management evaluates segment financial performance based on earnings before interest and taxes (EBIT), which includes the effects of corporate expense allocations. EBIT is a non-GAAP (accounting principles generally accepted in the United States of America) financial measur

  4. Slide 4: Underground Natural Gas Storage

    Underground Natural Gas Storage • Process • Geology to cavern creation to operations • Fundamentals • Project status • Golden Triangle • Jefferson Island Storage and Hub expansion • Other project development efforts 4

  5. Slide 5: Geology to Cavern Creation to Operations

    Geology to Cavern Creation to Operations 5

  6. Slide 6: One Key Issue - Brine Disposal

    One Key Issue - Brine Disposal • Between 7 and 8 barrels of water Well Logs are needed to create 1 barrel of indicating nearly cavern space (GTS caverns are 1,800 feet of 8.2 million barrels in size) permeable sand disposal zones • Saturated brine (about 10 times more concentrated than sea water) is

  7. Slide 7: Fundamentals

    Fundamentals It may take up to $5 700 World Wide billion of capital for Liquefaction every 8 million tons 600 (1.0 Bcf/d) of new liquefaction installed 500 400 Possible Planned 300 Under Construction Operating Large volumes of gas 200 will head toward the Gulf coast coming from either 100 LNG or hig

  8. Slide 8: Storage Additions Lag Behind Use

    Storage Additions Lag Behind Use 4.25 Annual Storage Capacity Additions Installed Storage Capacity 4.00 Annual Maximum Stored Capacity 3.75 3.8 Tcf 3.5 Tcf 3.50 3.25 100 3.00 80 60 2.75 40 20 2.50 Source: Wood Mackenzie, EIA, Pivotal On average from 1995 through 2007 the growth in storage capacity h

  9. Slide 9: Project Status - JISH and JISH Expansion

    Project Status - JISH and JISH Expansion Crosstex LIG Existing Expanded Configuration Configuration Texas Gas • Total Capacity 10.0 MMDth Columbia Gulf • Working Gas 7.2 MMDth • Number of Caverns 2 Tennessee • Max Injection Capability 360 MDth/Day • Max Withdrawal Capability 720 MDth/Day Jefferson I

  10. Slide 10: Project Status - JISH and JISH Expansion

    Project Status - JISH and JISH Expansion • Actively proceeding with litigation, but negotiations continue with the State • Upgraded facilities – Leach plant complete – New Trunkline interconnect – Additional interconnects planned – MAOP of header increased – Added capacity at key meters – 8,000 HP a

  11. Slide 11: Project Status - Golden Triangle

    Project Status - Golden Triangle Beaumont Disposal Line • Two, 6 Bcf caverns • 15,000 Hp of compression • 6 pipeline interconnections – Kinder Morgan, Centana, Golden Pass, Energy Transfer Co., Texas Eastern, Florida Gas • 9 Miles of twin 24 inch pipeline • In service - late 2010, late 2012 11

  12. Slide 12: Project Status - Golden Triangle

    Project Status - Golden Triangle • Permits – FERC permit received Dec. 31, 2007 – Texas RR Commission well permit received Dec. 3, 2007 – Applications for other permits progressing on schedule g US Corp of Engineers - - Wetlands g Texas Historical Commission - SHPO clearance g Texas Railroad Commiss

  13. Slide 13: GTS Schedule

    GTS Schedule 2007 2008 2009 210 2011 2012 Completed Work 06 | Qi @2,~ 03 ~=6G4] a1 G2 03 ~O4 Qi_ G2) Q3~=6G4/ Qi G2) 34 a4 | Qi_ a2 Q3 Q4/ ai a2 3 a4 Stage 1 (Assessment) Stage 2 (Definition & Planning) File FERC Application (6/2907) Stage 3 (Initial Design & Preparation) Receive FERC Initial Ops Ce

  14. Slide 14: The Next Project ...

    The Next Project ... • Option on site in hand • Similar characteristics to GTS – 2 caverns – 6 Bcf working capacity each - expandable to 8 Bcf with watering / dewatering – Maximum injection of 300 MMscf/d – Maximum withdrawal of 600 MMscf/d – Up to 8 interconnects • Schedule – Pre-filing - anticipat