Boral — Corporate Update (June 2017)
33 slides from Boral's corporate update, Jun 8, 2017
Slide 1: Boral Teven Quarry Whole of Community Meeting 8 June 2017
Build something great™ BORAL TEVEN QUARRY > Whole of Community Meeting 8 June 2017 Ballina RSL Club, Ballina
Slide 2: Agenda
Agenda ˃ Welcome and introductions, safety moment ˃ Previous Community Consultative Committee (CCC) meeting and matters arising ˃ 2 November 2016 (minutes available from www.boral.com.au/tevenquarry) ˃ Confirmation of CCC community representatives 2017-19 and Terms of Reference review ˃ Quarry opera
Slide 3: Introductions and safety moment
Introductions and safety moment ˃ Richard Tomkins Operations Manager (Country North), Boral Quarries (NSW/ACT) ˃ Scott Gillieatt Quarry Manager, Boral Teven Quarry ˃ Rod Johnson Environment Manager (NSW/ACT), Boral HSE ˃ Ronnie Lawton HSE Advisor (Northern NSW), Boral HSE ˃ Rod Wallace Planning & De
Slide 4: Previous CCC meeting and matters arising
Previous CCC meeting and matters arising ˃ Previous meeting of the Community Consultative Committee ˃ 2 November 2016 ˃ Note: Presentations and meeting notes from previous meetings are available from the quarry’s website – www.boral.com.au/tevenquarry ˃ Any matters arising? ˃ Contact with Council re
Slide 5: Community Consultation Committee 2017-19
Build something great™ BORAL TEVEN QUARRY > Community Consultation Committee 2017-19
Slide 6: CCC Terms of Reference and membership
CCC Terms of Reference and membership ˃ The original Boral Teven Quarry CCC Terms of Reference were developed with community input and endorsed at the first ‘whole of community’ meeting in 2011. ˃ The ToRs were re-endorsed at the 2013 and 2015 WoC meetings. ˃ When originally developed, the ToRs incl
Slide 7: CCC Terms of Reference and membership
CCC Terms of Reference and membership ˃ At the WoC meeting of 19 May 2011, we committed to: ˃ Stage a WoC meeting every 18 to 24 months for all interested residents and stakeholders to hear about progress at the operations, and ˃ Use the WoC meetings to elect/re-elect the community representatives t
Slide 8: Quarry operations update 2015-17
Build something great™ BORAL TEVEN QUARRY > Quarry operations update 2015-17
Slide 9: Current and future projects
Current and future projects Highway upgrade – Pimlico to Teven Highway upgrade – Woolgoolga to Ballina Construction of the new Harwood bridge Construction of Ferngrove residential estate Local projects Internal supply to Boral Concrete plants Internal supply to Boral Asphalt plant
Slide 10: PM10 monitor and wheel wash improvements
PM10 monitor installed Situated near Manager’s Cottage Operates for a continuous 24 hour period every 6 days (as per EPA standard) Wheel wash improvements Galvanized metal grid has been installed Additional sprays installed underneath grid to spray inside of tyres Continuous hire of ro
Slide 11: i uM J i pa
i uM J i pa
Slide 12: Slide 12
Slide 13: Environmental management update 2015-17
Build something great™ BORAL TEVEN QUARRY > Environmental management update 2015-17
Slide 14: Site water management
Site water management Two extra sediment basins Electric pumps with float valves Clean water diversion at the NW end of the quarry Grated drain across the quarry entrance
Slide 15: Weed Control Man Hours
Weed Control Man Hours 45 40 35 30 25 20 15 10 5 0 Jan Feb Mar April May Areas worked
Slide 16: Noise bund
Noise bund 3500 tonnes of material been placed at 4.6 metres high to create a noise bund on the eastern side of the workshop 560 native trees and shrubs planted with walls grass seeded
Slide 17: New site weather station
New site weather station Provides instantaneous weather data via internet for Boral (restricted access) Records past weather observations Data will be used to help interpret air quality monitoring results (Deposited Dust and PM10) The weather station is solar powered
Slide 18: Native seedlings growing on earth bund in basalt pit
Native seedlings growing really well on earth bund in basalt pit 1550 trees and grasses planted in October 2014 The trees today, some standing around 4 metres tall, providing a great visual barrier
Slide 19: Tree planting north (NE Corner)
Tree planting north (NE Corner) 1216 native seedlings planted - have taken off well
Slide 20: Average dust deposition (insoluble solids)
Averaging Period g/m2/montha Deposited Dustb Annual 4.00 a – Maximum total deposited dust level b – Dust is assessed as insoluble solids as defined by AS3580.10.1-1991 (AM-19) (At the nearest existing or likely future off-site sensitive receptor) Source: Table 7.1 (Page 28) of the Approved Methods f
Slide 21: Annual Average Dust Deposition 0.34 g/m2/month
Annual Average Dust Deposition (Insoluble Solids) 0.34 g / m2 / month
Slide 22: Annual Average Dust Deposition 0.76 g/m2/month
Annual Average Dust Deposition (Insoluble Solids) 0.76 g / m2 / month
Slide 23: Annual Average Dust Deposition 1.78 g/m2/month
Annual Average Dust Deposition (Insoluble Solids) 1.78 g / m2 / month
Slide 24: Annual Average Dust Deposition 0.53 g/m2/month
Annual Average Dust Deposition (Insoluble Solids) 0.53 g / m2 / month
Slide 25: PM10 Monitoring: Teven Quarry
BORAL. PM10 Monitoring: Teven Quarry 60.00 50.00 40.00 lm Daily Average g 3 30.00 —Sample Annual Average-Progressive 20.00 ~ Maximum Concentration Standard 24- hr Average (50,.g/m3) 10.00 ————— ——— Maximum Concentration Standard | | | Annual Average (25y1g/m3) 0.00 | | I s Fs so se se se s se s se S
Slide 26: Water quality limits from EPA Licence No 2261
Water quality limits for Boral Teven Quarry from EPA Licence No 2261
Slide 27: Blast overpressure and vibration results
Date Time Overpressure [dB] Peak Vibration [mm/s] Tuesday, 8 September 2015 11:48:58 109.9 2.0 Tuesday, 22 September 2015 13:20:50 114.4 1.5 Boral Teven Quarry Blast Limits; Thursday, 1 October 2015 13:03:07 106.0 2.1 • Only 1 blast per day Friday, 16 October 2015 13:32:00 107.0 2.1 • Only blast bet
Slide 28: Planning consent (from Nov 2016)
Build something great™ BORAL TEVEN QUARRY > Planning consent (from Nov 2016)
Slide 29: Consent modification approved
Consent modification approved ˃ Council approved the modification on 24 November 2016 ˃ The consent will lapse on 27 June 2026 ˃ New operating hours for processing: ˃ Monday to Friday – 7am to 6pm ˃ Saturday - None ˃ Mobile crushing under strict conditions (not yet undertaken) ˃ Additional commitmen
Slide 30: Community activities and general business
Build something great™ BORAL TEVEN QUARRY > Community activities and general business
Slide 31: Community activities 2015-17
Community activities 2015-17 ˃ The Teven Quarry has continued its efforts to be an active corporate citizen of Teven-Tintenbar and the greater Ballina community since the last WoC meeting. ˃ Our major community partnership with the Tintenbar Community Aid Network (TinCAN) has been sustained througho
Slide 32: General business and contacts
General business and contacts ˃ Items of general business ˃ Next meeting of the Community Consultative Committee ˃ Likely to be around Oct 2017 ˃ Next WoC meeting will be arranged for the first half of 2019 ˃ Boral Teven Quarry contacts: ˃ Scott Gillieatt Quarry Manager 6687 8360 / scott.gillieatt@b
Slide 33: Thank you for your attendance
Build something great™ BORAL TEVEN QUARRY > Thank you for your attendance