TinOne Resources Inc · TSXV:TORC

TinOne Resources — Investor Presentation (October 2023)

34 slides from TinOne Resources's investor presentation, October 2023

  1. Slide 1: Corporate Presentation

    Corporate Presentation October 2023 An Inventa Capital Company TSXV: TORC OTCQB: TORCF

  2. Slide 2: Disclaimer

    Disclaimer General This corporate presentation is intended to provide an overview of the business of TinOne Resources Inc. (the "Company"). It has been prepared for informational purposes only and does not purport to be complete. The information in this presentation is not intended to be relied upon

  3. Slide 3: TinOne Resources

    TinOne Resources TinOne is focused on the exploration and growth of prospective tin, lithium and tin/tungsten projects in Australia, with a focus on Tasmania Quality asset portfolio Building a significant position A portfolio of highly prospective tin, lithium and Expanding district scale exploratio

  4. Slide 4: Company Snapshot

    Company Snapshot 1 Year Share Performance Raised C$2.21 million in August 2022 36% owned by Directors, Management & Advisors Shareholder Base Attractive valuation relative to peers Share Structure & Cash (MILLIONS) Tin price reached a high of US$51k/t in April 2022, Shares Outstanding 85.5 dropped t

  5. Slide 5: Why Tin?

    Why Tin? Every component of the carbon reduced and growing data-driven economy requires tin, without it, electrons don’t flow. Metals Most Impacted by New Technology1 Autonomous Advanced Energy Advanced Key Highlights Renewable & Electric Vehicles Robotics Energy Storage Computation & IT • 50% of co

  6. Slide 6: Driving Force Behind Tin Demand – Growth in End Consumption

    Driving Force Behind Tin Demand – Growth in End Consumption Electric Vehicle Base Case Growth Rate1 Global Growth In Semi-Conductors2 Number of Estimate Vehicles, Millions Semi-Conductor Market Value Vertical. Indicative, $B 2016-30 % CARG1 +CAGR, 2021-30, 120 7% 60 Wired Communication Global produc

  7. Slide 7: Supply Constrained

    Supply Constrained Supply constrained by limited number of new projects and lack of expansion by existing producers Limited Industry Supply Structural Deficit Caused By Lack of Development - 20301 • According to World Bureau of Metal Statistics; Refined Tin Market in A Supply Deficit of 500 2030 11,

  8. Slide 8: Geopolitical Outlook

    Geopolitical Outlook The global critical metal outlook has become a geopolitical tug of war between certain countries Key Geopolitical Policies Top 10 Global Tin Production by Country5 01 Indonesia is set to ban exports of all unprocessed metal ore in June 2023 to develop processing refining facilit

  9. Slide 9: The Case for Tin - Now!

    The Case for Tin - Now! • YTD price increase of 50,000 30,000 ~+1.3%. The LME cash price LME Tin Cash-Settlement LME Tin stock is US$25,061.50 / t which is strong considering current 45,000 economic conditions and 25,000 positive relative to other 40,000 poor performing industrial metals (e.g. coppe

  10. Slide 10: TinOne's Portfolio of Key Tin Assets

    TinOne’s Portfolio of Key Tin Assets TinOne holds a dominant ground position over the prospective lithium-hosting granites in north-east Tasmania A Great Pyramid Project - Tin • Historical resource of 10,000 tonnes contained tin (Sn) at 0.2%1 • 90% of historical resource is within 40m of surface • C

  11. Slide 11: Why we like Tasmania

    Why we like Tasmania Location & access to infrastructure/utilities creates an efficient exploration platform Major Ports Burnie, Devonport & Bell Bay Easy access to Efficient, fast Launceston projects via permitting and Major city with a population of ~110,472 network of licencing system Great Pyram

  12. Slide 12: Great Pyramid Tin Project

    Great Pyramid Tin Project A highly prospective tin project with a historical resource that has seen no modern, systematic exploration Location Tier 1 Jurisdiction, NE Tasmania, Australia ~135 km from Launceston Significant resource growth potential Recently completed drill program near surface histo

  13. Slide 13: Great Pyramid – What we know

    Great Pyramid – What we know The deposit’s nature and extent are not constrained laterally or vertically, and the deposit is considered open for expansion in all directions. Great Pyramid Deposit Overview Great Pyramid Historic Resource - Oblique View Bulk mineable sheeted vein style tin Deposit beg

  14. Slide 14: The Opportunity

    The Opportunity Tin projects are highly leveraged and high margin operations High Level Overview1 Open Pit Tin Projects,2 120 Mt Lindsay, • The average open pit All In Sustaining Cost (AISC) for undeveloped PFS tin projects is approximately $US17.5k per ton tin produced 100 Contained Sn (kt) – M&I o

  15. Slide 15: Great Pyramid – Drilling Program Summary

    Great Pyramid – Drilling Program Summary Great Pyramid Program Aims and Results Drill hole plan showing Sn grades and key selected intersections Confirm historical drilling & resource estimate Weighted average tin grade for all 2022 recorded intersections was 0.23% Sn Highlights: • 22GPRC016: 51m @

  16. Slide 16: Great Pyramid – Upside

    Great Pyramid – Upside Modern geophysical surveys conducted by TinOne have identified several key exploration targets Great Pyramid Potential Interpreted granite source not encountered, therefore mineralization remains entirely open at depth open Mineral Resources Tasmania geophysical modelling inte

  17. Slide 17: Aberfoyle Tin, Tungsten & Lithium Project

    Aberfoyle Tin, Tungsten & Lithium Project A past producing, highly prospective tin district that has seen no modern exploration Aberfoyle Tin Project Located NE Tasmania ~95 km from Launceston Property Size 96 km2 over two blocks Ownership 100% TinOne Resources Inc Easy access due to a network of we

  18. Slide 18: Aberfoyle – Lithium Focused Exploration

    Aberfoyle – Lithium Focused Exploration Most recent sampling program has confirmed and expanded previously reported lithium discovery Key Highlights • Lithium mineralization zone expanded from initial sampling program • 10 samples from tin-focussed sampling program returned lithium values 0.1% Li2O

  19. Slide 19: Aberfoyle – Tin / Tungsten

    Aberfoyle – Tin / Tungsten Extensive areas of known geological systems have seen little to no systematic exploration Aberfoyle tin / tungsten project overview Past producing tin district • Aberfoyle historic production1 2.1Mt @ 0.9% Sn and 0.3% WO3 • Multi-kilometre scale vein corridors with sparse

  20. Slide 20: Rattler Range – Tin & Lithium Prospect

    Rattler Range – Tin & Lithium Prospect Significant tin district with historical exploration data containing highly elevated lithium grades1 Rattler Range Located NE Tasmania ~64 km from Launceston Property Size 32 km2 Ownership 100% Owned Easy access due to a network of well maintained Infrastructur

  21. Slide 21: Execution Plan

    Execution Plan TinOne’s clear strategy to effectively deliver Achieved In Progress Next Steps Great Pyramid Great Pyramid Great Pyramid  Successful 4,687m exploration • Geological modelling and Phase II • Quantify results from the initial drill program drilling design program • Confirmed historical

  22. Slide 22: Board of Directors & Management

    Board of Directors & Management A highly diversified board team with all aspects of local exploration, development and capital markets Chris Michael Ota Karlene Liz Donaldson Konnert Hally Collier Monger Executive Chairman Director & Interim CEO Director Director Director 25-year track record raisin

  23. Slide 23: Advisors

    Advisors Strengthening through discovery track record and local expertise Dr. Chris Craig Paul Scott Leslie Parry Matysek Halley Technical Advisor Technical Advisor Technical Advisor Technical Advisor • Economic geologist with over 15 years of • Co-founder and Partner of Inventa • 40+ year mining en

  24. Slide 24: Our takeaways

    Our takeaways Underexplored projects in highly prospective tin, tungsten and lithium Location districts in Tasmania, Australia that are currently zoned for future commercial production Bringing the discovery track record and capital markets expertise of the Team team to the tin sector Acquiring pros

  25. Slide 25: APPENDIX

    eflinOne APPENDIX

  26. Slide 26: Great Pyramid – Drilling Program Summary

    Great Pyramid – Drilling Program Summary Great Pyramid drill hole plan showing Sn grades and key selected intersections. The mineralization is open in all directions laterally and at depth. 26 TSXV: TORC tinone.ca

  27. Slide 27: Aberfoyle – Soil Sampling Results

    Aberfoyle – Soil Sampling Results Lithium Tin Aberfoyle project lithium ppm soil sampling results, highlighting the coherent lithium Aberfoyle project tin ppm soil sampling results, highlighting the coherent tin anomaly anomaly defined in the Dead Pig-Guinea Pig and Rex Hill area. Results from sampl

  28. Slide 28: Peers; The Development Life Cycle

    Peers; The Development Life Cycle Lower pre-production capital required to develop a tin deposit compared to other commodities Tin mines Study results from several tin deposits Units The Achmmach1 Heemskirk2 Oropesa3 Taronga4 South Crofty5 Year complete 2018 2019 2021 2014 2017 Study type PFS Scopin

  29. Slide 29: NSW Tin Projects – Exploration Pipeline

    NSW Tin Projects – Exploration Pipeline Significant prospective tin land holdings in NSW, Australia New South Wales NE NSW: Emmaville, Glen Innes & Tingha Located S NSW: Tin Hill Emmaville, Glen Innes & Tingha: 512 km2 Property Size Tin Hill: 530 km2 Ownership 100% TinOne Resources Inc. Key Highligh

  30. Slide 30: Panama Gold Project – Qualifying Property

    Panama Gold Project – Qualifying Property Exploring historic gold districts in Tasmania, Australia Panama Located 85 km from Launceston Property Size 28 km2 Ownership 75% owned by TinOne with an option to acquire 100% Key Highlights • Target-rich environment – defined targets, historic workings and

  31. Slide 31: Panama Gold Project

    Panama Gold Project Exploring historic gold districts in Tasmania, Australia Panama Valley Prospect • Extensive area of historic workings, gold at surface undrilled • Historic drilling at the smaller Potoroo prospect returned @ 66m @ 0.6 g/t Current work programs include: • 7 holes for 420 metres •

  32. Slide 32: Inventa Capital

    Inventa was founded in 2017 by Craig Parry and Michael Konnert to seize emerging opportunities in the natural resource sector. Today, Inventa has grown into a premier investment group with a first-rate portfolio of companies and a world-class team focused on providing the elements that the world nee

  33. Slide 33: Disclaimer

    Disclaimer Forward-Looking Statements This presentation contains “forward looking statements” regarding the Company within the meaning of applicable securities legislation, including statements as to future events, results and plans. Forward- looking statements are sometimes but not always identifie

  34. Slide 34: Contact the Team

    Contact the Team Chris Donaldson (Executive Chairman) - Canada chris@tinone.ca www.tinone.ca TSXV: TORC OTCQB: TORCF

TinOne Resources — Investor Presentation (October 2023) on 6ix