Foran Mining Corporation

Foran Mining — Investor Presentation (June 2020)

31 slides from Foran Mining's investor presentation, June 2020

  1. Slide 1: Corporate Presentation June 2020

    TSXV: FOM US OTC: FMCXF foranmining.com CORPORATE PRESENTATION June 2020 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  2. Slide 2: Forward Looking Statement

    F O R W A R D L O O K I N G S TAT E M E N T This presentation contains "forward-looking information" (also referred to as "forward looking statements"), which relate to These forward looking statements are made as of the date hereof and, except as required by applicable securities regulations, futur

  3. Slide 3: McIlvenna Bay

    McIlvenna Bay Zinc | Copper | VMS 3 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  4. Slide 4: Top Canadian Mining Jurisdiction

    S A S K AT C H E W A N Top Canadian Mining Jurisdiction* McILVENNA BAY Ranked #11 globally *Fraser Institute Annual Survey of Mining Companies 2019 4 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  5. Slide 5: Flin Flon Greenstone Belt

    F L I N F LO N G R E E N S TO N E B E LT HANSON LAKE FLIN FLON SNOW LAKE DISTRICT DISTRICT DISTRICT LALOR McILVENNA BAY Largest undeveloped deposit along trend 777 TARGET A BALSAM BIGSTONE THUNDER ZONE 225km 5 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  6. Slide 6: Hanson Lake VMS District

    HANSON LAKE VMS DISTRICT 10 Km 6 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  7. Slide 7: McIlvenna Bay Pre-Feasibility Study Results

    M c I LV E N N A B AY PRE-FEASIBILITY STUDY RESULTS Canadian dollars unless otherwise indicated Pre-Tax NPV (7.5%) ($M) 218.6 Metal Prices 3 year trailing average (USD) (2) Pre-Tax IRR (%) 23.4% After-Tax NPV (7.5%) ($M) 147.1 Zinc (lb) 1.26 After-Tax IRR (%) 19.2% Copper (lb) 2.82 Undiscounted Afte

  8. Slide 8: PFS Capital and Operating Cost Summary

    M c I LV E N N A B AY PRE-FEASIBILITY STUDY RESULTS Canadian dollars unless otherwise indicated Capital Cost Summary Operating Cost Summary Pre- CAD/t Sustaining Total Production processed Mine 72.7 273.9 346.6 Mining 41.19 Mill 100.6 7.2 107.8 Milling 19.55 Infrastructure 50.8 0.0 80.8 Infrastructu

  9. Slide 9: Metallurgical Recovery and Concentrate Grades

    M c I LV E N N A B AY PRE-FEASIBILITY STUDY RESULTS Canadian dollars unless otherwise indicated Metallurgical Recovery Copper Zinc Gold Silver (LOM Average) Massive Sulphide Recovery % 80.9 81.8 68.8 53.7 CSZ Recovery % 96.2 10.0 97.5 78.5 Blended Recovery % 88.2 80.0 79.1 58.0 Concentrate Grades Co

  10. Slide 10: Revenue by Metal

    M c I LV E N N A B AY REVENUE BY METAL ZINC 48% COPPER 38% SILVER 4% GOLD 11% 10 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  11. Slide 11: Probable Mineral Reserves

    M c I LV E N N A B AY PROBABLE MINERAL RESERVES McIlvenna Bay Mineral Reserve Statement (@US$100/t NSR cut-off) Note: 2019 Mineral Resource Estimate was based on US$60/t NSR cut off GRADE Probable Tonnes Zn Cu Au Ag (%) (%) (g/t) (g/t) Massive Sulphide 7,773,176 5.71 0.88 0.51 25.24 Copper Stockwork

  12. Slide 12: VMS Deposit Size Comparison

    62.5 VMS DEPOSITS 35 Flin Flon – Snow Lake – McIlvenna Bay McIlvenna Bay 30 22.95 Mt (Indicated) 11.15 Mt (Inferred) 25 VMS Deposits form in clusters • Majority of deposits in each cluster are 3–5 Mt • Potential for 1-2 large (+20Mt) to very large (+50Mt) deposits Deposit Size 20 (Mt) 15 10 5 0 McIl

  13. Slide 13: McIlvenna Bay Development Milestones

    M c I LV E N N A B AY D E V E L O P M E N T M I L E S T O N E S 2018 2019 2020 2021 2022 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Data Compilation Metallurgical Testing Resource Estimate (McIlvenna Bay) EIA / Permitting Pre-Feasibility Study Feasibility Study Community Engagement Production Decision Deta

  14. Slide 14: Zinc and Copper Demand

    ZINC AND COPPER DEMAND MINIMUM SUPPLY NEEDED from new projects by 2027/28 “Prepare for a decade 4.2 Mt 4.7 Mt of Dr. Copper on steroids.” COPPER ZINC Citigroup Inc.– Max Layton and Tracy Liao, July 2018 Source: Teck Corporate Presentation, Feb 2019 14 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  15. Slide 15: Foran Elements of Success

    FORAN ELEMENTS OF SUCCESS VMS PROJECT Zinc | Copper Large tonnage Pre-feasibility Saskatchewan Past success Historicc LOCATION PEOPLE Leadership Infrastructuree Community Synergy Glencore Production decision Target A Demandd Thunder Zone TIMING GROWTH Supply deficitt Bigstone 15 | TSXVFOM | OTCFMCXF

  16. Slide 16: Contact Us

    C O N TA C T U S 904-409 Granville Street Vancouver, BC, Canada V6C 1T2 P: 604-488-0008 E: ir@foranmining.com W: www.foranmining.com 16 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  17. Slide 17: Appendix

    APPENDIX 17 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  18. Slide 18: Resource Update

    2 0 1 9 R E S O U R C E U P D AT E * 65% increase in 11.15 million indicated resources tonnes Now 22.95 million tonnes Inferred resources 1.5 billion lbs Zn 450 million lbs Zn 590 million lbs Cu 340 million lbs Cu Contained metals (indicated) Contained metals (inferred) *Released May 28, 2019 – see

  19. Slide 19: 2019 Mineral Resource Estimate

    M c I LV E N N A B AY 2019 Mineral Resource Estimate Tonnes Cu Zn Pb Au Ag CuEq ZnEq Zone (Mt) (%) (%) (%) (g/t) (g/t) (%) (%) 2019 Main Lens – 9.25 0.90 6.43 0.40 0.52 25.97 10.25 Massive Sulphide Lens 3 1.99 0.85 3.29 0.14 0.27 14.71 6.45 INDICATED Stringer Zone 0.70 1.38 0.62 0.04 0.35 13.34 1.73

  20. Slide 20: Foran Share Structure

    FORAN SHARE STRUCTURE COMMON COMMON SHARES OPTIONS WARRANTS SHARES Issued & Outstanding* Fully Diluted 139.9 M 5.8 M 3.6 M 149.3 M TSXVFOM PRICE SHAREHOLDERS 3 Month $0.08 - $0.17 18% 16% Management & Directors High Net Worth 52 Week Hi/Lo $0.31/$0.08 1% (incl. Pierre Lassonde ~10.7%) Institutional

  21. Slide 21: Leadership Team

    LEADERSHIP TEAM Darren Morcombe Patrick Soares Executive Chairman President & CEO DIRECTORS Maurice Tagami David M. Petroff Technical Ambassador Former President, CEO & Director Wheaton Precious Metals Breakwater Resources Darren Morcombe Patrick Soares Executive Chairman President & CEO MANAGEMENT

  22. Slide 22: Feasibility Drilling Plan Map

    FEASIBILITY DRILLING PLAN MAP 22 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  23. Slide 23: Long Section Massive Sulphide

    LONG SECTION MASSIVE SULPHIDE 23 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  24. Slide 24: Long Section Copper Stockwork

    LO N G S E C T I O N CO P P E R STO C KW O R K 24 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  25. Slide 25: Typical Cross Section

    TYPICAL CROSS SECTION 25 | TSXVFOM | OTCFMCXF | FORANMINING.COM

  26. Slide 26: Community

    COMMUNITY The Peter Ballantyne Cree Nation communities of Amisk Lake, Pelican Narrows and Deschambault are near the McIlvenna Bay Project. It is important to the team at Foran to maintain a good relationship with community members and leaders, as well as work with local consulting firms and companie

  27. Slide 27: Exploration

    E X P L O R AT I O N THUNDER McILVENNA ZONE BAY1 First new discovery FLAGSHIP DEPOSIT in 30 years Updated Resource Discovery Hole issued May 2019 3.70m @ 4.07%Cu and 0.43g/tAu 10km Discovery Hole 1000m 1 Effective date May 7, 2019; Metal prices used are US$3.30/lb. Cu, US$1.25/lb. Zn, US$1.00/lb. Pb

  28. Slide 28: Thunder Zone

    THUNDER ZONE First new discovery in Discovery 30 years1 Hole: • Cu and Zn-rich VMS • 3.70m @ 4.07% Cu and mineralization 0.43g/tAu • Discovered using updated geophysics THUNDER ZONE Higher grades than Open along McIlvenna Bay strike • 2015 drilling confirmed • Thickening down and expanded plunge dis

  29. Slide 29: Bigstone

    B I G S TO N E Historic resource1 Infill Drilling to NI43-101 • 2015 drilling – 6 holes • Specific gravity • High grade Cu +/- Zn underestimated 18.4% Zn2 2.0% Cu2 • Over 12 m, including: • Over 105 m, including: • 27.0% Zn over 7.6m • 4.1% Cu over 20.0 m • 1.4% Cu over 10.6m BIGSTONE • 3.4% Cu over

  30. Slide 30: McIlvenna Bay 2019 Resource Footnotes

    M c I LV E N N A B AY 2019 RESOURCE FOOTNOTES 1 Effective date May 7, 2019; CIM definitions were 3 Mr. William Lewis, P.Geo., of Micon International Limited, followed for Mineral Resources; CuEq = copper prepared this mineral resource estimate. Mr. Lewis is equivalent; ZnEq = zinc equivalent; NSR =

  31. Slide 31: Vancouver Office Contact Details

    904 – 409 Granville St. Vancouver, BC, Canada V6C 1T2 Tel: 604.488.0008 www.foranmining.com TSXV: FOM US OTC: FMCXF 31 | TSXVFOM | OTCFMCXF | FORANMINING.COM