Stanmore Resources Ltd · ASX:SMR

Stanmore Resources — Q4 2025 Earnings Presentation

23 slides from Stanmore Resources's earnings presentation, Jan 27, 2026

  1. Slide 1: 2025 Half Year Financial Results

    2025 Half Year Financial Results Six months ended June 30, 2025 Invest or Pr esent at ion August 25, 2025

  2. Slide 2: Important Information

    Impor t ant Infor mat ion Forward-looking statements This document contains certain “forward-looking statements”. The words “forecast”, “estimate”, “like”, “anticipate”, “project”, “opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify forward looking st

  3. Slide 3: 1H 2025 Highlights

    1H 2025 Highlights Safety Production 0.00 SAFR 6.5 Mt Industry Average of 0.68 1 6.8Mt, 1H 2024 FOB Cash Cost2 Underlying EBITDA3 89 US$ /t 147 US$ m US$91/t, 1H 2024 US$375m, 1H 2024 Operating Cash Flow Net Debt / (Cash)4 151 US$ m 99 US$ m US$209m, 1H 2024 US$(192)m, 1H 2024 STANMORE | 2025 HALF Y

  4. Slide 4: Operating Performance

    Operating Per for mance

  5. Slide 5: Operating Achievements and Challenges

    Oper at ing Achievement s and Challenges Ongoing recovery from significant wet weather impacts without compromising safety or cost discipline St r ong Safet y Per for mance Oper at ional Resilience Cost Discipline • Serious Accident Frequency Rate (‘SAFR’) • Year-to-date rainfall in the Moranbah regi

  6. Slide 6: Portfolio Performance Highlights

    Por t folio Per for mance Highlight s Mine plans adjusted to prevailing conditions with recovery into 2H 2025 Sout h Walker Cr eek Poit r el Isaac Plains Complex 3.0 Mt 82 US$ /t 139 US$ /t 2.5 Mt 94 US$ /t 128 US$ /t 1.3 Mt 101 US$ /t 125 US$ /t Saleable FOB Cash Average Saleable FOB Cash Average S

  7. Slide 7: Consolidated Operating Summary

    Consolidat ed Oper at ing Summar y Second half performance to recover with further improvement in strip ratios and higher production Saleable Production Strip Ratio8 • FOB Cash Cost within (Mt) Guidance range 13.8 – 14.4 10.0 6.5 13.6 despite weather 13.2 impacts Mt 9.0 Saleable • Saleable Productio

  8. Slide 8: Operational Financial Performance

    Oper at ional Financial Per for mance Lower FOB Cash Costs supporting positive Underlying EBITDA despite uncontrollable headwinds FOB Cash Cost Walk-Forward Analysis2 (US$/t) Uncontrollable Impacts Controllable Benefi ts • Strong operational cost and productivity improvements 5 have mitigated inflati

  9. Slide 9: Financial Results

    Financial Result s

  10. Slide 10: Financial Scorecard

    Financial Scor ecar d Solid profitability and a strong balance sheet supporting Stanmore through the coal price cycle Total Underlying • Strong operational Income EBITDA3 performance with resilient 872 US$ m 1 47 US$ m operational cash generation and underlying EBITDA despite headwinds 1,327 US$ m 1H

  11. Slide 11: Summarised Financial Results

    Summar ised Financial Result s Positive EBITDA margins maintained, though lower coal prices and sales volumes do impact bottom line Profit and Loss Statement (US$m)14 1H 2025 1H 2024 • Revenue from coal sales 34% lower year-on- year following a 25% reduction in Average Sales Price and 436Kt less sale

  12. Slide 12: Cash Flow Analysis

    Cash Flow Analysis Despite market conditions, the Group continues to deleverage and provide shareholder returns 1H 2025 Cash Flow Walk-Forward (US$m) US$96m Cash Flows for Deleveraging & (36) 404 Shareholder Returns (25) 151 • Net cash generated from operations after capital expenditure totalled (10

  13. Slide 13: Production, Cost and Capital Guidance

    Pr oduct ion, Cost and Capit al Guidance Reduced cost 2025 Public Guidance reaffirmed, with second half production recovery anticipated Year To Dat e June 2025 Full Year 2025 Saleable Production • Year to date June 2025 saleable Implied Guidance6,21 Actuals Guidance6,21 production is currently track

  14. Slide 14: Projects & Growth

    Projects & Gr owt h

  15. Slide 15: Capital Program

    Capit al Pr ogr am Capital returns to a more steady-state sustaining profile in 2H 2025, given recent project completions Step-Change in Capital Spend 170 (US$m) 2024 marked a timely completion of a major, multi-year capital investment phase (47%) of more than US$330 million, Despite the natural step

  16. Slide 16: Organic Growth Pipeline

    Or ganic Gr owt h Pipeline Significant optionality within organic development pipeline Core Development Projects to Strengthen St r at egic ‘Mor anbah’ Complex Other Gr owt h & Sust aining Projects Isaac Downs Ext ension Lancewood Isaac Monetisation of non-core, southern portion of broader ‘Wards Pla

  17. Slide 17: Isaac Downs Extension Project Outline

    Isaac Downs Ext ension Pr oject Out line Currently our highest priority strategic project within the Group, with EIS preparation underway Indicative Optimal Timeline and St age-Gates Preliminary Pit Shell and Pr oject Summar y External Stakeholder Dependent Stanmore Driven • Isaac Downs Extension re

  18. Slide 18: Metallurgical Coal Market Outlook

    Metallurgical Coal Mar ket Out look

  19. Slide 19: Historical Pricing Analysis

    Hist or ical Pr icing Analysis Range bound pricing environment amidst global macro-economic uncertainty Historical Metallurgical Coal Pricing (US$/t) • Pricing conditions remained subdued “Australian Australian coking coal coal metallurgical prices havehave prices remained range-bound remained at or

  20. Slide 20: Trade Flow Dynamics

    Tr ade Flow Dynamics Elevated Chinese steel exports continues to supress steel margins ex-China, impacting met coal demand and prices, partially offset by subdued metallurgical coal supply from Australia Annualised Monthly China Steel Exports Monthly Queensland Metallurgical Coal Exports (Mt, Annual

  21. Slide 21: Market Outlook

    Mar k et Out look Continued growth in aggregate crude steel production ex-China driven mostly by India Annualised Quarterly Ex-China Crude Steel Production Forecast Change in Metallurgical Coal Exports by Region (Mt) (Mt) • Growth in aggregate crude Continued growth in Indian steel production in 202

  22. Slide 22: Contacts

    Cont act s Invest or s Investors@stanmore.net.au +61 (7) 3238 1000 Media Media@stanmore.net.au +61 (7) 3238 1000 Regist er ed Addr ess Level 32, 12 Creek Street Brisbane, QLD, Australia, 4000 GPO Box 2602 Brisbane, QLD, Australia, 4000

  23. Slide 23: Footnotes

    Foot not es 1. Rolling 12 month average as of March 31, 2025 reported as of August 22, 2025 by Resources Safety and Health Queensland for surface mines 2. FOB cash cost per tonne sold (excluding third party coal purchases), including IFRS-16 lease accounting and excluding inventory movement, State r

Stanmore Resources — Q4 2025 Earnings Presentation on 6ix