    Slide 1: Q3 Results and Business Update

    HOLDINGS Q3 Results and Business Update November 2023 1

  2. Slide 2: Preamble

    Slide 2: Preamble

    Preamble The following content is Our goal is to share with you The content is in line with our completely qualified by the some of our strategic thinking and principles of being legal disclosures on the slide financial analysis we are using to accountable and transparent following this one. guide t

  3. Slide 3: Legal Disclosure & Disclaimer

    Slide 3: Legal Disclosure & Disclaimer

    Legal Disclosure & Disclaimer This presentation includes forward-looking statements within the meaning of the Private Securities Litigation Reform Act that reflect our current views with respect to, among other things, our operations, business strategy, interpretation of prior development activities

  4. Slide 4: Company Overview

    Slide 4: Company Overview

    Company Overview 4

  5. Slide 5: We buy curtailed energy from renewable power plants

    Slide 5: We buy curtailed energy from renewable power plants

    We buy curtailed energy from renewable power plants and convert it to clean, low-cost global computing. Bitcoin Mining and Excess energy from High Performance renewable sources Computing 5

  6. Slide 6: Not all renewable energy produced can be used because the grid is inflexible

    Slide 6: Not all renewable energy produced can be used because the grid is inflexible

    Not all renewable energy now being produced can be used because the grid is inflexible… $ 6.75B Annually lost revenue due to wasted energy* *Based $30/MWh Global Average LCOE – 2019 Lazard Report 6

  7. Slide 7: How We're Solving the Wasted Energy Problem

    Slide 7: How We're Solving the Wasted Energy Problem

    How We’re Solving the Wasted Energy Problem We build data centers that consume curtailed renewable energy. 150 MW Wind Farm + 50 MW Data Center +150 MW Data Center 7

  8. Slide 8: Unique Interconnection Strategy

    Slide 8: Unique Interconnection Strategy

    Unique Interconnection Strategy Behind-the-Meter Structure Allows Our Modular Data Centers to Remain Flexible, Drawing Power from the Grid or Renewable Power Plant and Provide Ancillary Services Wind Farm HV MV Meter Meter Grid Substation Solar Farm MV 3 Meter MV LV MV Switchgear 2600 kVA 1.2 MW per

  9. Slide 9: How We Source Power for Our Data Centers

    Slide 9: How We Source Power for Our Data Centers

    How We Source Economic/Technical curtailment from Power for CURTAILED negative LMP. ENERGY Our Data We purchase energy at a fixed Centers price. MDC* Energy that would Energy that is sourced have gone to grid from the grid in excess without the load. SUBTRACTIVE GRID of plant production. We purchase

  10. Slide 10: Our Data Centers Can Do More Than Mine Bitcoin

    Slide 10: Our Data Centers Can Do More Than Mine Bitcoin

    Our Data Centers Purpose-built to efficiently convert curtailed renewable Can Do More Than energy into high performance Mine Bitcoin computing. Power Input: Monitoring: Emergency Shutdown Configurable, Nominal Full Remote Monitoring for Time: 416/240 VAC 3-phase Operations and Security 2s Power Load

  11. Slide 11: MaestroOS Is Our Force Multiplier

    Slide 11: MaestroOS Is Our Force Multiplier

    MaestroOS Is Our Force Multiplier Control Operations Power Enhancing equipment lifespan and reducing Real-time tracking of miners, PDUs, Extensible architecture allows for quick failures through multiple redundancies. networking equipment, and power adaptation of algorithms, facilitating infrastruct

  12. Slide 12: $120B+ market opportunity

    Slide 12: $120B+ market opportunity

    $120B+ $9B+* Digital currencies market $5B* opportunity Scientific research Our long-term strategy is to dominate a few relatively small niche markets (Bitcoin mining, GPU cloud, etc.) by offering a truly zero-carbon cloud to a variety of end $50B+* markets that are currently not served by data cent

  13. Slide 13: How Soluna Makes Money

    Slide 13: How Soluna Makes Money

    How Prop Bitcoin High Performance Soluna Mining Computing Makes • Soluna or JV owned Bitcoin mining machines • Bitcoin sold daily • GPU Cloud – AI/ML, simulation, visualization, predictive analytics, and deep learning Money • Soluna provides Managed Infrastructure Services • GPU machines could be ho

  14. Slide 14: The Soluna Way

    Slide 14: The Soluna Way

    Source The low-cost curtailed Soluna power from IPPs Way Grow pipeline Build, own, operate MDCs with 2-yr ROIC We tackle wasted energy through digital infrastructure. As we optimize the grid and serve our customers, we fuel our growth, funding further expansion to make renewable Grow AUM Attract ene

  15. Slide 15: Operational Highlights

    Slide 15: Operational Highlights

    Operational Highlights 15

  16. Slide 16: Key Operating Metrics

    Slide 16: Key Operating Metrics

    Key Operating Metrics1 TICKER MW MANAGED INSTALLED HASHRATE SLNH / SLNHP 75 MW 291 MW3 2.6 EH/s2 AVERAGE POWER COST CURTAILED ENERGY MONETIZED POWER USAGE EFFECTIVENESS (PUE) <$30 / MWh 4,003 MWh 1.01 BITCOIN MINERS DEPLOYED AVERAGE J / TH/s 23,6552 ~30 J / TH/s (1) All numbers are as of October 31s

  17. Slide 17: Project Dorothy 1A

    Slide 17: Project Dorothy 1A

    Project Dorothy 1A CAPACITY MODEL 25 MW Hosting INSTALLED HASHRATE ENERGIZATION 950 PH/s Operational POWER USAGE EFFECTIVENESS AVERAGE ANNUAL LCOE 1.01 ~$27 / MWh POWER SOURCE PARTNER Wind Spring Lane Capital CURTAILED ENERGY CONSUMED 2,501 MWh 17

  18. Slide 18: Project Dorothy 1B

    Slide 18: Project Dorothy 1B

    Project Dorothy 1B CAPACITY MODEL 25 MW Prop Mining INSTALLED HASHRATE ENERGIZATION 816 PH/s Operational POWER USAGE EFFECTIVENESS AVERAGE ANNUAL LCOE 1.01 ~$27 / MWh POWER SOURCE PARTNER Wind Navitas Global CURTAILED ENERGY CONSUMED 1,502 MWh 18

  19. Slide 19: Project Sophie

    Slide 19: Project Sophie

    Project Sophie CAPACITY MODEL 25 MW Hosting INSTALLED HASHRATE ENERGIZATION 844 PH/s Operational POWER USAGE EFFECTIVENESS AVERAGE ANNUAL LCOE 1.02 ~$28 / MWh POWER SOURCE PARTNER Hydro/Grid None All numbers are as of October 2023. 19

  20. Slide 20: Project Pipeline

    Slide 20: Project Pipeline

    Project Pipeline 20

  21. Slide 21: Project Dorothy

    Slide 21: Project Dorothy

    Project Dorothy 2 CAPACITY MODEL 50 MW Hosting & AI POWER SOURCE ENERGIZATION Wind Design and Planning PARTNER AVERAGE ANNUAL LCOE TBD ~$27 / MWh 21

  22. Slide 22: Project Kati

    Slide 22: Project Kati

    Project Kati CAPACITY MODEL 166 MW Hosting POWER SOURCE ENERGIZATION Wind Development PARTNER AVERAGE ANNUAL LCOE TBD ~$30 / MWh 22

  23. Slide 23: We Have a Growing Pipeline of Projects

    Slide 23: We Have a Growing Pipeline of Projects

    We Have a Growing Pipeline of Projects Data 25MW 100MW 166MW 2GW+ long-term Centers & Sophie Dorothy Kati pipeline with Pipeline 50MW Design & large IPPs and Operating Operating Development* infrastructure Powered by funds in the US and beyond 23 *Design – design and development activities with the

  24. Slide 24: Financial Results

    Slide 24: Financial Results

    Financial Results 24

  25. Slide 25: 2023 Corporate Focus On Track

    Slide 25: 2023 Corporate Focus On Track

    2023 Corporate Focus On Track Oct ‘23 Energize Cash Expand Grow Dorothy Flow+ Flagship Pipeline Shift flagship site from Sign 50MW of Target the Sign term sheets for construction to hosting at Dorothy development of up to 100MW of additional operations. Energize and Sophie, ramp 50 MW of Dorothy 2 b

  26. Slide 26: Quarterly Financials YTD 2023

    Slide 26: Quarterly Financials YTD 2023

    Quarterly Financials YTD 2023 Quarterly Financials Q1 23 Q2 23 Q3 23 YTD 23 Cryptocurrency Mining Revenue 2,796 915 1,786 5,497 Data Hosting Revenue 286 1,153 4,011 5,451 Total Revenue 3,082 2,068 5,797 10,948 % Change in Revenue -33% 180% Cost of Cryptocurrency Mining Revenue, excl. Depreciation 2,

  27. Slide 27: Quarterly Financials YTD 2023

    Slide 27: Quarterly Financials YTD 2023

    Quarterly Financials YTD 2023 $4,500 $4,000 $3,500 $3,000 $2,500 $2,000 $1,500 $1,000 $500 $- Q1 23 Q2 23 Q3 23 Cryptocurrency Mining Revenue Data Hosting Revenue 27

  28. Slide 28: Condensed Consolidated Balance Sheet

    Slide 28: Condensed Consolidated Balance Sheet

    Condensed Consolidated Balance Sheet (1)Prior period results have been adjusted to reflect the Reverse Stock Split of the Common Stock at a ratio of 1-for-25 that became effective October 13, 2023. 28

  29. Slide 29: Condensed Consolidated Statement of Operations

    Slide 29: Condensed Consolidated Statement of Operations

    Condensed Consolidated Statement of Operations (1)Prior period results have been adjusted to reflect the Reverse Stock Split of the Common Stock at a ratio of 1-for-25 that became effective October 13, 2023. 29

  30. Slide 30: Non-GAAP Measures

    Slide 30: Non-GAAP Measures

    Non-GAAP Measures EBITDA Reconciliation from Net Loss to EBITDA, which excludes impact of: 1-Interest 2-Taxes 3-Depreciation 4-Amortization Adjusted EBITDA Reconciliation from EBITDA, which excludes impact of: 1-Stock based compensation 2-Loss on sale of fixed assets 3-Impairment on equity investmen

  31. Slide 31: Connect With Us

    Slide 31: Connect With Us

    Connect With Us Twitter LinkedIn Newsletter @SolunaHoldings Soluna Holdings bit.ly/solunasubscribe 31

  32. Slide 32: Appendix

    Slide 32: Appendix

    Appendix 32

  33. Slide 33: Meet the Soluna Leadership Team

    Slide 33: Meet the Soluna Leadership Team

    Meet the Soluna Leadership Team John Belizaire David Michaels Larbi Loudiyi Phillip Ng Jessica Thomas Chief Executive Officer Chief Financial Officer VP, Power VP, Corporate Development Chief Accounting Officer Michael Toporek Mary O’Reilly Dipul Patel Chase Stowell Executive Chairman Chief People O

  34. Slide 34: Soluna's Expertise

    Slide 34: Soluna's Expertise

    Soluna’s Expertise Implementing our modular data centers is a low-risk, low-friction process because of our five pillars of expertise. Project Energy Computing Project Data Center Development Markets Technology Finance Operations 34

  35. Slide 35: Our Intellectual Property Pipeline

    Slide 35: Our Intellectual Property Pipeline

    Our Intellectual Property Pipeline # / Patent Stage 35 23 14 9 3 IDEATION IN PATENT PREFILING/ FILED FILED FULL PATENT (Big Ideas) DOCKET DRAFTING PROVISIONAL APPLICATION Patent Summary • Modular Data Center (Flexible/Modular • Modular Computer Array Architecture) (Flexible/Modular Compute Capabilit

  36. Slide 36: MaestroOS Is Our Optimization Platform

    Slide 36: MaestroOS Is Our Optimization Platform

    MaestroOS Is Our Optimization Platform Primary Dashboard Power Dashboard 36

  37. Slide 37: Generative AI Market Growth

    Slide 37: Generative AI Market Growth

    Generative AI Market Growth $126.5B The global generative AI market size was valued at USD 8.2 Billion in 2021, and is projected to reach USD 126.5 1543% Billion by 2031, growing at a CAGR of 32% from 2022 to 2031. $8.2B 2021 2031 37 Source: https://reports.valuates.com/market-reports/ALLI-Manu-0E89

  38. Slide 38: Global AI Market Size

    Slide 38: Global AI Market Size

    Europe Global AI Market Size North Market America Latin Share by The global artificial intelligence (AI) market size America Region, was estimated at US$ 119.78 billion in 2022 and 2021 it is expected to hit US$ 1,591.03 billion by 2030 Middle East & Africa with a registered CAGR of 38.1% from 2022

  39. Slide 39: Learn more at solunacomputing.com

    Slide 39: Learn more at solunacomputing.com

    Learn more at solunacomputing.com 39