Slide 1: Cerro de Oro PEA Results - Presentation
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY Cerro de Oro PEA Results - Presentation October 4th 2022 TSX-V: MAI / OTCQX: MAIFF1 www.mineraalamos.com
Slide 2: Forward Looking Statements
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY Forward Looking Statements This presentation contains certain “forward-looking statements”. All statements, other than Darren Koningen, P. Eng., President of Minera Alamos is the Qualified Person (within the meaning statements of historical fact, that a
Slide 3: Cerro de Oro - 100% Owned - Zacatecas State
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY CERRO DE ORO - 100% OWNED1 - ZACATECAS STATE LOCATION / INFRASTRUCTURE • Accessible by paved highway • 25 km N of Newmont’s 8M oz Au/471 Moz Ag Peñasquito Mine MINE PLAN/STAGE • Near-term development opportunity; extensive metallurgical studies already
Slide 4: Cerro de Oro PEA Economic Summary
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY Cerro de Oro PEA Economic Summary After-Tax NPV (5%) After-Tax IRR US$150.5 million 93% 111% After-Tax Payback Period 11 months STRONG IRR After-Tax Ave. Annual Production 58,400 oz gold Preproduction Capital US$28 million (including 30% contingency) US
Slide 5: Cerro de Oro PEA Economic Key Highlights
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY Cerro de Oro PEA Economic Key Highlights PRODUCTION HIGHLIGHTS • Average annual gold production 60,000 to 70,000 oz in years 1-4 • Average AISC of $763/oz in years 1-4 • Largely Run of Mine operation with approx. 30% of higher-grade material expected to
Slide 6: Cerro de Oro Updated Resource Statement
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY Cerro de Oro Updated Resource Statement MINERAL RESOURCE ESTIMATE Resource Category Material Type Cut-off Grade Tonnes (t) Average Grade Contained Au Au (g/t) Au (g/t) (oz) Inferred Oxide 0.15 67,000,000 0.37 790,000 Notes: • The independent and QP for
Slide 7: Cerro de Oro Surface Rights
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY Cerro de Oro Surface Rights Key step achieved in advancing CdO into permitting in the coming months 7 TSX.V: MAI OTCQX: MAIFF www.mineraalamos.com
Slide 8: Cerro de Oro Timeline
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY Cerro de Oro Timeline 2022 2023 2024 Q4 Q1 Q2 Q3 Q4 H1 Permit Applications Submission Permit Receipt Infill and Expansion Drilling Additional Metallurgical Testwork Cerro de Oro Anticipated Construction Cerro de Oro Anticipated Start-up Note: Notwithsta
Slide 9: Achieving Escape Velocity – How a Junior Producer can be more than just that
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY Achieving Escape Velocity – How a Junior Producer can be more than just that… Many Junior gold producers often remain junior gold producers which begs the question – Why? • Leading cause is more than likely permitting time lines • Secondly, capital requ
Slide 10: Thank you
BUILDING THE NEXT MID-TIER GOLD MINING COMPANY Thank you For more information contact us: info@mineraalamos.com Or follow us at : 10 www.mineraalamos.com TSX.V: MAI OTCQX: MAIFF