  1. Slide 1: Australian Energy and Minerals Investor Conference

    Australian Energy and Minerals Investor Conference 17 March 2021

  2. Slide 2: Disclaimer

    Disclaimer This document is for information purposes only. It is not a prospectus, disclosure document The estimated petroleum reserves and resources referred to in this presentation or offering document under Australian law or under any other law and does not constitute an were first announced to t

  3. Slide 3: Winchester Energy Limited Summary

    Winchester Energy Limited Summary Pumpjack in Winchester’s Mustang Oil Field, Nolan County, Texas • Established US oil and gas explorer and producer • Listed on ASX in 2014 (ASX Code: “WEL”) • Operations office in Houston, Texas • Corporate office in Perth, Western Australia • Winchester operates 18

  4. Slide 4: Company Snapshot Corporate

    Company Snapshot Corporate Key Metrics Operating Metrics ASX Code • WEL Daily Production2 • 252 boepd gross; 187 boepd net to WI Shares on issue • 691 m Lifting Costs • US$8.46 / barrel Unlisted options on issue • 45 m Qtly Net Revenue (Q4 2020)2 • A$507 K Share price • A$0.023 (12 March 2021) Lease

  5. Slide 5: Company Snapshot Technical

    Company Snapshot Technical WEL Reserves and Resources as of 31 December 20202,3 • Large lease position in the Permian Eastern Shelf (Nolan / Coke Counties) Reserves - WEL Net Interests - Nolan County, 31 December 2020 Net Reserves BO equiv. • High Working Interests; Established Production Category O

  6. Slide 6: Permian Basin, Texas

    Permian Basin, Texas Winchester active on Eastern Shelf “The Permian Basin Is Now The World's Top Oil Producer”1 WEL Area Of Operations – Permian Eastern Shelf - Nolan & Coke Counties Permian Basin Stacked, proven, prolific oil producing horizons Technical Remaining Recoverable 20 billion bo & 16 TC

  7. Slide 7: Nolan County Project - Land and Lease Status

    Nolan County Project - Land and Lease Status Eastern Shelf - Nolan and Coke Counties SW Nolan County – Winchester leases and recent wells Winchester’s Nolan County Project covers a large contiguous position, with over 19,500 net acres under lease, primarily in Nolan County. Thomas Ranch Whiteside Br

  8. Slide 8: Nolan County Project – Depositional Environments

    Nolan County Project – Depositional Environments Key Zones and Potential Eastern Shelf Stratigraphy (in part) • Local production from multiple clastic and carbonate Shelf Carb Tertiary – sporadic porosity/pay – serendipity play reservoirs in the Cambrian, Shelf Clastic Tertiary – sporadic porosity/p

  9. Slide 9: Nolan County Project – Historical Production and WEL 3D Seismic

    Nolan County Project – Historical Production and WEL 3D Seismic Winchester properties and 3D seismic overlying local production • Over 18,856 contiguous net acres under WEL 3D Seismic lease, primarily in Nolan County. 65 sq mi Maryneal S Doris • Leases covered by 65 mi2 of 3D seismic – Nena exclusiv

  10. Slide 10: Nolan County Project - Prospect and Play Summary

    Nolan County Project - Prospect and Play Summary 2021 Review - Multiple Prospects and Play Types Winchester Energy leases and oil fields, prospects and leads • Mustang Field (Fry Sand, Elbgr) Winchester • Bast Field (Bast Sand) Production • Lightning (Cisco) Winchester • Greater Lightning Resources

  11. Slide 11: Nolan County Project - Prospect and Play Summary

    Nolan County Project - Prospect and Play Summary Gross Resources (Unrisked)1 Gross Contingent Resources P90 mboe P50 mboe P10 mboe Lightning Cisco 2,174.2 4,822.5 11,015.3 Bast Field (Primary) 143.0 438.5 935.2 Bast Field (Secondary) 242.2 471.7 932.0 Total 2,559 5,733 12,883 Gross Prospective Resou

  12. Slide 12: Nolan County Project Proposed Forward Program

    Nolan County Project Proposed Forward Program Q2/Q3 2021 Q3/Q4 2021 2022 • Ongoing production from Mustang • Ongoing production • Ongoing production and vertical drilling and Bast oil fields. • Low/Med-risk drill/workover program with • Introduce horizontal drill program (Lightning • Low-risk drill/

  13. Slide 13: Upcoming Activity

    Nolan County Project Upcoming Activity  2021 Q2/Q3 Program  Bast Deep  Mustang Development  Workovers AEMIC 17 March 2021 13

  14. Slide 14: Bast Deep - High Impact Potential

    Bast Deep - High Impact Potential Successful Cambrian Test will be “Game-Changer” for Winchester Bast Deep Bast Deep Prospect 0.95 million boe (P50/Best Estimate) Gross Prospective Resources1 2.34 million boe (P10/High Estimate) Primary Target Cambrian Sandstone (4 way dip) Secondary Target Ellenbur

  15. Slide 15: Cambrian – High Impact Exploration Play

    Nolan County Cambrian – High Impact Exploration Play Cambrian Prospectivity - Regional Cambrian Production Summary – Fort Chadbourne Fault trend Cambrian Fields – Fort Chadbourne Fault Trend Field Cum Production Producing Zones White Flat 13.4 mmBO Cambrian, Ellenburger, Caddo Dora North 7.7 mmBO Ca

  16. Slide 16: Cambrian – High Impact Exploration Play

    Nolan County Cambrian – High Impact Exploration Play Cambrian Prospectivity – Regional Charge Model Cambrian Charge Model Cambrian Fields and Potential Traps Nolan County Line of Section Permian Basin Pre-Cambrian Structure AEMIC 17 March 2021 16

  17. Slide 17: Cambrian – High Impact Exploration Play

    Nolan County Cambrian – High Impact Exploration Play Cambrian Prospectivity - Regional Cambrian Prospects and Leads Bast Deep Prospect Cambrian Play to be drilled in May • Primary Target – Structural closures at Cambrian Sandstone level. • This thick, porous widespread reservoir has produced from ne

  18. Slide 18: Bast Deep – Strawn Sands offer additional low risk target

    Bast Deep – Strawn Sands offer additional low risk target Bast Deep well to also penetrate western side of existing oil field Bast Field - Strawn Sst Depth Structure Map showing Production and proposed Bast Deep location. Bast Deep • Secondary Target is the Upper Strawn sandstone. This 10’ sand has

  19. Slide 19: Upcoming Activity

    Nolan County Project Upcoming Activity  2021 Q2/Q3 Program  Bast Deep  Mustang Development  Workovers AEMIC 17 March 2021 19

  20. Slide 20: Mustang development well – WHR 21-06

    Nolan County Project – 2021 Q2/Q3 Program Mustang development well – WHR 21-06 WHR 21-06 Reserves (PUD) 74 mboe Mustang Field Primary Target Strawn (Fry Sand; 5,000- 6,000 ft) Secondary Target Ellenburger Fm (7,000 ft) Additional Targets None Programmed Total Depth 7,200 ft DHC: US$350,000 Estimated

  21. Slide 21: Development Program Fry Sand Step-out

    Nolan County Project – Development Program Fry Sand Step-out Mustang Field – Proven and Undeveloped Prodn over Hilbert Amp Field Mapping  The Mustang Oil Field is a stratigraphic trap formed by the up-dip pinch- out of the westerly dipping Fry Sst. The Fry was deposited from the Mustang Proved Must

  22. Slide 22: Development Program Fry Sand Step-out

    Nolan County Project – Development Program Fry Sand Step-out Fry Net Pay from Wells – Hilbert Amp Guidance Field Mapping  The Mustang Oil Field is a stratigraphic trap formed by the up-dip pinch-out of the westerly dipping Fry Sst. The Fry was deposited from the adjoining shelf to the east via a se

  23. Slide 23: Upcoming Activity

    Nolan County Project Upcoming Activity  2021 Q2/Q3 Program  Bast Deep  Mustang Development  Workovers AEMIC 17 March 2021 23

  24. Slide 24: Workovers - fracture stimulate Cisco Sands

    Nolan County Project – 2021 Q2/Q3 Program Workovers - fracture stimulate Cisco Sands Bast #1 / McLeod 17-03 Workovers McLeod 17-03 Estimated Recovery per well 15 mbo each Bast #1 Primary Stimulation target Cisco Sands Secondary Target None Additional Targets None Estimated Workover Costs (100%) US$1

  25. Slide 25: Bast #1 proposed workover

    Nolan County Project – 2021 Q2/Q3 Program Bast #1 proposed workover (log analysis identifies untested potential pay) Cisco Zones for Test AEMIC 17 March 2021 25

  26. Slide 26: McLeod 17-03 proposed workover

    Nolan County Project – 2021 Q2/Q3 Program McLeod 17-03 proposed workover (log analysis identifies good, unstimulated pay) Cisco Zones for Stimulation AEMIC 17 March 2021 26

  27. Slide 27: Nolan County Project – 2021 Q3/Q4 Program

    Nolan County Project – 2021 Q3/Q4 Program Nolan County Project  2021 Q3/Q4 Candidate Prospect Details  Meteor  Spitfire  El Dorado  Mustang North 63-01  Hurricane 64-02  Lightning Upper Cisco Horizontal AEMIC 17 March 2021 27

  28. Slide 28: Meteor Cambrian Prospect

    Nolan County Project – 2021 Q3/Q4 Program Cambrian Prospect Meteor Gross Prospective 1.94 mmboe (P50) Resources1 4.69 mmboe (P10) Meteor Primary Target Cambrian Sandstone (7,800 ft) Secondary Target Ellenburger Fm (7,000 ft) Additional Targets Odom Programmed Total Depth 7,800 ft DHC: US$500,000 Est

  29. Slide 29: Meteor Prospect High Impact Cambrian Test – 7,800 ft

    Meteor Prospect High Impact Cambrian Test – 7,800 ft Depth Structure Map – Top Cambrian Fm Meteor • Primary Target - Cambrian Sandstone at 7,800 ft. • 4 way dip structural closure mapped on high quality 3D Meteor seismic. • None of the local wells penetrate the Cambrian but out-of-structure Cambrian

  30. Slide 30: Meteor Prospect High Impact Cambrian Test – 7,800 ft

    Meteor Prospect High Impact Cambrian Test – 7,800 ft 21-2G Nearby Cambrian Penetration Seismic Cross Section shown proposed Meteor location (Hilbert) Meteor Meteor Dolomite TD ~7800’ Igneous AEMIC 17 March 2021 30

  31. Slide 31: Nolan County Project – 2021 Q3/Q4 Program

    Nolan County Project – 2021 Q3/Q4 Program Nolan County Project  2021 Q3/Q4 Candidate Prospect Details  Meteor  Spitfire  El Dorado  Mustang North 63-01  Hurricane 64-02  Lightning Upper Cisco Horizontal AEMIC 17 March 2021 31

  32. Slide 32: Spitfire Prospect Strawn Channel Test – 7,200 ft

    Spitfire Prospect Strawn Channel Test – 7,200 ft Spitfire Gross Prospective 2.7 mmboe (P50) Resources1 6.0 mmboe (P10) Spitfire Strawn Sandstone Channel Primary Target (6,000 – 6,500 ft) Secondary Target Ellenburger Fm (7,000 ft) Additional Targets Nil Programmed Total Depth 7,200 ft DHC: US$500,000

  33. Slide 33: Spitfire Prospect Strawn Channel Test – 7,200 ft

    Spitfire Prospect Strawn Channel Test – 7,200 ft Spitfire – Seismic Interpretation Spitfire Spitfire Spitfire • The Spitfire Prospect will test a channel feature mapped on 3D seismic. The interval was penetrated at the channel edge in the McLeod 213 Amerac #1, where it penetrated 30 feet of gross sa

  34. Slide 34: Spitfire Prospect Seismic Anomaly Extent

    Spitfire Prospect Strawn Channel Test – 7,200 ft; Seismic Anomaly Extent Spitfire – Mapped Anomaly Spitfire - 3D Seismic Definition • Prospect is defined on high quality 3D seismic and covers up to 1,200 acres. • Prospective areas (used in resource assessment):  P90 = 320 ac;  P10 = 1,050 ac • Cal

  35. Slide 35: Spitfire Prospect Drill Location Correlation

    Spitfire Prospect Drill Location Correlation Spitfire Prospect - Correlation Spitfire • The seismic anomaly is at the same level as the thin tight Gardner Spitfire stringers at 213-1 Amerac, which may be oil bearing. • The well to the east at Base 2 Carb Mustang are tight shale and limestone at this

  36. Slide 36: Nolan County Project – 2021 Q3/Q4 Program

    Nolan County Project – 2021 Q3/Q4 Program Nolan County Project  2021 Q3/Q4 Candidate Prospect Details  Meteor  Spitfire  El Dorado  Mustang North S63  Mustang North (Hurricane) 64-02  Lightning Upper Cisco Horizontal AEMIC 17 March 2021 36

  37. Slide 37: El Dorado Prospect Cambrian / Ordovician Test – 8,000 ft

    El Dorado Prospect Cambrian / Ordovician Test – 8,000 ft El Dorado Gross Prospective 1.36 mmboe (P50/Best Estimate) Resources1 3.52 mmboe (P10/High Estimate) El Dorado Cambrian Sandstone Primary Targets Ellenburger Fm (7,000 ft) Secondary Target Cisco Sands (4,000 – 4,800 ft) Additional Targets Odom

  38. Slide 38: El Dorado Prospect Cambrian / Ordovician Test – 8,000 ft

    El Dorado Prospect Cambrian / Ordovician Test – 8,000 ft Faults from wells El Dorado Prospect Ellenburger Formation Fields, Lineaments and Cum Production Faults from seismic • Closed structure of over 1000 ac. Ellenburger Fields Bridgford Big Silver • Ellenburger shows structural All wells >6000’ cl

  39. Slide 39: El Dorado Prospect Cambrian / Ordovician Test – 8,000 ft

    El Dorado Prospect Cambrian / Ordovician Test – 8,000 ft Isochron Map: Interval from Big Red Shale to Ellenburger Formation El Dorado Prospect - Ellenburger Data limitations / edge effects • The superior data quality of the South Antelope cube allows an isochron to the Possible deep faults Ellenburg

  40. Slide 40: El Dorado Prospect Cambrian / Ordovician Test – 8,000 ft

    El Dorado Prospect Cambrian / Ordovician Test – 8,000 ft El Dorado Prospect Depth Structure Map – Top Ellenburger Formation • El Dorado - closed structure of over 1000 acres • Ellenburger shows structural closure and processing has suggested changes in velocity of the carbonates that may correspond

  41. Slide 41: El Dorado Prospect

    El Dorado Prospect El Dorado Prospect • El Dorado - closed structure of over 1000 acres • Ellenburger shows structural closure and processing has suggested changes in velocity of the carbonates that may correspond to potential areas of fracture and potentially karstification. • Four way closure also

  42. Slide 42: El Dorado Prospect Cisco Sands - El Dorado Incision

    El Dorado Prospect Cisco Sands - El Dorado Incision – Traverse from Lightning El Dorado Prospect El Dorado Seismic Section – Cisco incision • Cisco Sand potential at El Dorado based on well location that should intersect interpreted Cisco Sand Channel – separate from Lightning Cisco. Cisco El Dorado

  43. Slide 43: Nolan County Project – 2021 Q3/Q4 Program

    Nolan County Project – 2021 Q3/Q4 Program Nolan County Project  2021 Q3/Q4 Candidate Prospect Details  Meteor  Spitfire  El Dorado  Mustang North S63  Hurricane 64-02  Lightning Upper Cisco Horizontal AEMIC 17 March 2021 43

  44. Slide 44: Mustang North Prospect - WHR 6301

    Mustang North Prospect - WHR 6301 WHR 6301 - Low-risk field extension Mustang North - WHR 6301 Gross Prospective 623 mboe (P50/Best Estimate) Resources1 1,344 mboe (P10/High Estimate) Mustang North Primary Targets Strawn (Fry Sand; 5,000- 6,000 ft) Secondary Target Canyon Reef; Ellenburger Fm Additi

  45. Slide 45: Mustang North Prospect - WHR 6301

    Mustang North Prospect - WHR 6301 Amplitude – Top Fry (Hilbert) – Gross Sand Overlay WHR 6301 WHR 6301 - Mustang North Mustang North 63-01 • Remapping of 3D seismic indicates productive trend at Mustang Central potentially extending to the north- east into Sections 38 and 63. Mustang North • Initial

  46. Slide 46: Mustang North Prospect - WHR 6301

    Mustang North Prospect - WHR 6301 Low-risk field extension Fry Interpreted Fans – Mustang – Mustang North and Extension WHR 6301 - Mustang North Mustang North Fan Mustang North Separate deposition but may be single 63-01 • Remapping of 3D seismic indicates flow unit with Mustang Central. productive

  47. Slide 47: Nolan County Project – 2021 Q3/Q4 Program

    Nolan County Project – 2021 Q3/Q4 Program Nolan County Project  2021 Q3/Q4 Candidate Prospect Details  Meteor  Spitfire  El Dorado  Mustang North 63-01  Hurricane 64-02  Lightning Upper Cisco Horizontal AEMIC 17 March 2021 47

  48. Slide 48: Hurricane Prospect Canyon Reef and Fry potential

    Hurricane Prospect Canyon Reef and Fry potential with substantial follow-up Hurricane 64-02 1.04 mmboe (P50/Best Estimate) Gross Prospective Resources1 1.91 mmboe (P10/High Estimate) Hurricane 6402 Primary Target Canyon Reef Secondary Target Fry Sand Additional Targets Ellenburger Fm (7,000 ft) Prog

  49. Slide 49: Hurricane Prospect Canyon Reef Potential

    Hurricane Prospect Canyon Reef Potential Isopach - 1 Carbonate (Canyon Reef) Mustang North – Hurricane 64-02 Gross porous zone SS top porosity • Prospective area covers 1,300 acres (from well control). There are five wells in the area with log pay; net pay ranges up to 200 ft and is expected to aver

  50. Slide 50: Hurricane Prospect Canyon Reef Potential

    Hurricane Prospect Canyon Reef Potential Stratigraphic Cross secn – Canyon Reef 6402 PL Mustang North Pod 1300 acres x 20’ x 40 bbls/acre-ft 1 Carb Log Pay 1 mmbls AEMIC 17 March 2021 50

  51. Slide 51: Hurricane Prospect Canyon Reef analog well: 1991 Rendova Oil

    Hurricane Prospect Canyon Reef analog well: 1991 Rendova Oil: Tubb-Christopher, Melvin C #1 - 68 feet interpreted pay Log Analysis: 64-1 Rendova (API: 35332161) Isopach - 1 Carb (Canyon Reef) Rendova 64-1 AEMIC 17 March 2021 51

  52. Slide 52: Hurricane Prospect Canyon Reef analog well: 1986 Sun Expln

    Hurricane Prospect Canyon Reef analog well: 1986 Sun Expln: Alderman, Ray “B” #1 Log Analysis: Sun Alderman B 64-1 (API: 353331958) Isopach - 1 Carb (Canyon Reef) Sun Alderman, Ray “B” #1 AEMIC 17 March 2021 52

  53. Slide 53: Nolan County Project – 2021 Q3/Q4 Program

    Nolan County Project – 2021 Q3/Q4 Program Nolan County Project  2021 Q3/Q4 Candidate Prospect Details  Meteor  Spitfire  El Dorado  Mustang North S63  Mustang North (Hurricane) 64-02  Lightning Upper Cisco Horizontal AEMIC 17 March 2021 53

  54. Slide 54: Cisco “B” Sand Horizontal

    Cisco “B” Sand Horizontal Lightning Area – Upper Cisco “B” Sand – 7,500 ft horizontal well Lightning Horizontal 4.82 mmboe (P50/Best Estimate) Gross Contingent Resources1 11.01 mmboe (P10/High Estimate) Lightning Hz Primary Target Upper Cisco “B” Sand Secondary Target - Additional Targets - Programm

  55. Slide 55: Lightning Upper Cisco B Sand – Net Sand

    Cisco “B” Sand Horizontal Lightning Upper Cisco B Sand – Net Sand Lightning - Upper Cisco B sand - Net Upper Cisco – “B” Sand Gross Cisco B  Gross OIP estimated at Prospect 42 mmbo Net Cisco B Well  Gross Contingent Resource (P50) Estimate: 4.8 million boe  Sand distribution as mapped can accommo

  56. Slide 56: Lightning Upper Cisco – Potential well-bore path

    Cisco “B” Sand Horizontal Lightning Upper Cisco – Potential well-bore path Lightning – Cisco Cross Section showing proposed well bore Potential Well bore AEMC March 2021 56

  57. Slide 57: Nolan County Project – 2021 Drilling Schedule

    Nolan County Project – 2021 2021 Winchester Energy Ltd 2021 Drilling Schedule WEL WI Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Permian Basin Bast #1 Recompletion Phase 1 to July Upper Cisco Sand 92.0% • Apr – Bast #1 Workover Bast Deep 100.0% Cambrian Structure/Strawn • May – Bast Deep Well Hu

  58. Slide 58: Nolan County Project – 2021 drilling opportunities

    Nolan County Project – 2021 “Game Changer” potential drilling in May – other material prospects to follow Re-entries and Recompletions – cost-effective production boosts Identified Opportunities  Bast Field (up to 3 wells)  Lightning (McLeod 17-03)  White Hat Ranch (Canyon Reef) Field Extensions

  59. Slide 59: Nolan County Project – 2021 Summary

    Nolan County Project – 2021 Summary Winchester Energy Pumpjack, Workover Rig, Oil being loaded at Arledge 16-02 Multiple Prospects • Winchester has new prospects defined by planned for 2021 both drilling and 3D seismic ready to drill in Drilling 2021 with considerable upside and large Working Intere

  60. Slide 60: Contact details

    ASX: WEL ABN 21 168 586 445 USA TWO RIVERWAY, SUITE 1700 HOUSTON TX 77056 +1 713 333 0610 AUSTRALIA 24 OUTRAM STREET, GROUND FLOOR WEST PERTH WA 6005 +61 8 9200 3743 WWW.WINCHESTERENERGYLTD.COM