Filo Mining — Investor Presentation (July 2017)
15 slides from Filo Mining's investor presentation, July 2017
Slide 1: Corporate Presentation July, 2017
Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation July, 2017
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT All information included in this presentation, including any information as to the Company’s future financial or operating performance, and other statements that express management’s expectations or estimates of future performance, other than statements of historical fact, const
Slide 3: A Strong Start, Lots More to Come
A STRONG START LOTS MORE TO COME… • Spun out of NGEx in September, 2016 • Raised $20M at $2.00/share in October, 2016 • Completed successful exploration program in March 2017 • Resource update and metallurgical tests underway – Results expected in July, 2017 • Preliminary engineering work scheduled
Slide 4: Plan: A New Chapter of Exploration Success in Latin America
PLAN A NEW CHAPTER OF EXPLORATION SUCCESS IN LATIN AMERICA • Evaluate potential for a low cost heap leach at Filo del Sol • If successful move towards eventual production 4
Slide 5: Current Gold-Copper-Silver Resource (Being Updated)
CURRENT GOLD-COPPER-SILVER RESOURCE (BEING UPDATED) SHALLOW OXIDE MINERALIZATION; GOOD GRADES; OPEN FOR EXPANSION Gold Zone 53 million tonnes @ 0.95% copper* 23 million tonnes @ 123 grams/tonne silver** * 0.50% copper cutoff ** 50 g/t silver cutoff GOLD ZONE COPPER ZONE SILVER ZONE HIGHLIGHTS HIGHLI
Slide 6: 2017 Exploration Program
2017 EXPLORATION PROGRAM SUCCESSFUL RESOURCE CONVERSION AND STEP OUT PROGRAM • Expanded and defined gold zone • Confirmed high grade copper and silver zones • Intersected new copper and gold mineralization at Filo South target
Slide 7: Exploration Upside
EXPLORATION UPSIDE ONE OF THE LARGEST FOOTPRINTS IN THE ANDES Younger cover Alteration Outcropping High grade oxide copper
Slide 8: Oxide Copper Zone
OXIDE COPPER ZONE POTENTIAL FOR SIMPLE, LOW COST, HEAP LEACH PROJECT + = WATER SOLUBLE COPPER 8
Slide 9: Preliminary Leach Testwork
PRELIMINARY LEACH TESTWORK VERY ENCOURAGING Leach Recoveries* • Gold Oxide 93% • Copper Oxide 95% ** • Silver zone 93%*** NOTES * Bottle roll lab results typically higher than column/field heap results ** Copper Oxide: Good results with plain water leach; ** Copper Oxide: Good gold recoveries with s
Slide 10: Heap Leaching Is a Simple, Low Cost Process
HEAP LEACHING IS A SIMPLE, LOW COST PROCESS COMMONLY USED TO RECOVER GOLD, SILVER, AND COPPER FROM OXIDE ORES • Ore is mined and placed on leach pads or “heaps” • It is sprinkled with a solution that dissolves the metals • Metals are then recovered from the solution by various methods • Produces ~16
Slide 11: Next Steps
NEXT STEPS • Phase 1 (Completed Q1 2017) • Approx 8,600 m • Infill – Convert inferred to indicated – Better definition of high grade zones in gold zone • Exploration drilling to south – New oxide copper zone – New oxide gold zone • Collected samples for column leach tests • Phase 2 (Underway Q2 2017
Slide 12: Filo del Sol Project in 90 Seconds
FILO DEL SOL PROJECT IN 90 SECONDS VIDEO Filo del Sol Project 3D Virtual Tour Click link to see video https://player.vimeo.com/video/217919898 12
Slide 13: A Ground Floor Opportunity
A ground floor opportunity… to be part of the Lundin’s newest venture at the very beginning of its growth phase just when commodity prices are recovering 13
Slide 14: Appendix
Appendix 14
Slide 15: Filo del Sol – Current Resource
Filo del Sol – Current Resource FILO DEL SOL TOTAL INFERRED MINERAL RESOURCE (0.3% CuEq Cut off) Resource Grade Contained Metal Million Cu Au Ag 1 CuEq (%) Cu Au Ag Tonnes (%) (g/t) (g/t) (bi llion lbs) (mi llion oz) (mi llion oz) OXIDE 49.9 0.42 0.39 6.6 0.70 0.5 0.6 10.5 SULPHIDE 331.2 0.39 0.32 1