Continental Resources Inc

Continental Resources — Investor Day (October 2010)

35 slides from Continental Resources's investor day presentation, Oct 12, 2010

  1. Slide 1: Bakken map

    250 Miles pASK | MANITOBA ‘WONT _N.DAKOTA a o Continental

  2. Slide 2: Bakken Kitchen cross section

    CANADA pare | IMMATURE “BAKKEN KITCHEN” CONTINUOUS OVERPRESSURED OIL CELL 5,000° MIGRATED OIL CONVENTIONAL TRAP + 275 Miles > i Continental

  3. Slide 3: CLR Acreage: Substantially De-Risked

    CLR Acreage: Substantially De-Risked Bakken horizontal 2000 -2009 Bakken horizontal 1985-2000 Bakken vertical completion CLR leasehold • 864,559 net acres • 72% is de-risked and in development mode 21 Operated rigs • 4 rigs drilling ECO-Pads ® • 2 rigs on HBP units • 15 rigs on first wells per unit

  4. Slide 4: Fracture Stimulations - Driving the Expansion

    Fracture Stimulations - Driving the Expansion # of Frac Stages

  5. Slide 5: More Stages Improve EURs

    More Stages Improve EURs # of Frac Stages 518 MBOE MODEL

  6. Slide 6: IPs Correlate with Higher EURs

    IPs Correlate with Higher EURs 30-Day IP, BOEPD 518 MBOE MODEL

  7. Slide 7: ND Bakken Economics 2011

    ND Bakken Economics 2011 CWC: $6.5MM EUR: 518 MBoe * Net of differentials.

  8. Slide 8: Maintaining ND Drilling Efficiencies

    Maintaining ND Drilling Efficiencies

  9. Slide 9: Wellbore length illustration

    2 miles (10,560 feet) ew Sa ew Sa ) Continental

  10. Slide 10: Multiple fracture stages with a 500' stimulation radius

    Multiple fracture stages with a 500’ stimulation radius 4 Continental

  11. Slide 11: Slide 11

  12. Slide 12: Slide 12

  13. Slide 13: Slide 13

  14. Slide 14: Slide 14

  15. Slide 15: Slide 15

  16. Slide 16: Slide 16

  17. Slide 17: Slide 17

  18. Slide 18: Slide 18

  19. Slide 19: Multiple fracture stages with a 500' stimulation radius

    Multiple fracture stages with a 500’ stimulation radius 4 Conrinenral

  20. Slide 20: Multiple fracture stages with a 500' stimulation radius

    Multiple fracture stages with a 500’ stimulation radius 4 Conrinenral

  21. Slide 21: Slide 21

  22. Slide 22: Slide 22

  23. Slide 23: First ECO-Pad Project Completion

    First ECO-Pad Project Completion Arthur-Hegler ECO-Pad results Three Forks pair: Hegler 1-13H (83% WI): 1,195 Boepd @ 1400 psi on 22 choke Arthur 1-12H (94% WI): 849 Boepd @ 1150 psi on 22 choke Middle Bakken pair: Hegler 2-13H (83% WI): 1,203 Boepd @ 2200 psi on 18 choke Arthur 2-12H (94% WI): 1,10

  24. Slide 24: Continental's ECO-Pad Technology

    Continental’s ECO-Pad Technology

  25. Slide 25: Continental's ECO-Pad Technology

    Continental’s ECO-Pad Technology

  26. Slide 26: Continental's ECO-Pad Technology

    Continental’s ECO-Pad Technology

  27. Slide 27: Strong 3Q10 ND Bakken Wells

    Strong 3Q10 ND Bakken Wells Top 11 CLR-operated completions (Boepd): Bonney 2-3H (43% WI): Roadrunner 1-15H (56% WI): Rollefstad 2-3H (73% WI): Medicine Hole 2-27H (43% WI): Mack 2-2H (74% WI): Ravin 1-1H (59% WI): Hegler 2-13H (83% WI): Howard 1-5H (52% WI): Hegler 1-13H (83% WI): Arthur 2-12H (94%

  28. Slide 28: ND Improving Production Rates

    ND Improving Production Rates Boepd 3Q:623 2Q:454

  29. Slide 29: CLR: #1 Bakken Drilling Program

    CLR: #1 Bakken Drilling Program * Source: Industry reports at Oct. 4, 2010. Rigs

  30. Slide 30: Bakken: 56% of CLR Reserves

    Bakken: 56% of CLR Reserves Mid-Year 2010 Reserves: 310 MMBoe ND Bakken 43.4% MT Bakken 12.4% Red River Units 17.9% Anadarko Woodford 5.0% Other 5.0% Arkoma Woodford 16.3%

  31. Slide 31: Bakken: Tremendous Growth Potential

    7% 13% Bakken: Tremendous Growth Potential 247 net wells drilled 3,394 PUD and potential net wells to be drilled (320-acre spacing, dual reservoir) 640s 320s 1,663 PUD and potential net wells to be drilled on CLR acreage (640-acre spacing, dual reservoir)

  32. Slide 32: Bakken Operating Challenges

    Bakken Operating Challenges Rig and frac crew availability • CLR currently has 3 dedicated frac crews: 2 Pumpco, 1 Schlumberger • Two more frac crews with allocated dates each month • Costs are increasing: 2011 CWC $6.5MM Takeaway capacity from the Williston Basin • Gas gathering systems stressed; s

  33. Slide 33: Barrels of Oil Per Day

    Barrels of Oil Per Day Statewide Daily Oil Production: North Dakota & Montana Source: Haan Patueton-HPDIA NIC: pene Enandpe: £0G al- EOC aby Ears Ca Continental

  34. Slide 34: CLR Bakken: Key Takeaways

    CLR Bakken: Key Takeaways Bakken continues to grow through technology CLR holds the #1 lease position CLR is the clear leader in the hottest oil play in the United States • 3,394 PUD and potential net locations yet to drill (320-acre spacing, dual reservoir)

  35. Slide 35: Continental

    Continental

Continental Resources — Investor Day (October 2010) on 6ix