Red Hill Minerals — Red Hill Iron — Shareholder Meeting (November 2015)
8 slides from Red Hill Minerals's shareholder meeting presentation, Nov 17, 2015
Slide 1: ASX cover announcement: Annual General Meeting presentation
Level 2, 9 Havelock Street, West Perth WA 6005 PO Box 1160, West Perth WA 6872 Telephone: (61 8) 9481 8627 ABN: 44 114 553 392 Facsimile: (61 8) 9481 8445 E-mail: redhillinfo@redhilliron.com.au Website: www.redhilliron.com.au 17 November 2015 Company Announcements Office ASX Limited Level 4, 20 Brid
Slide 2: Disclaimer and Warning
ABN 44 114 553 392 =< REDHILLIRON a Limited claimer and Warning Rp representation or liability: No representation or warranty is made as to the fairness, currency, accuracy, completeness, reliability or of this pi ion, or any opinions, conclusions and I-looking it ins or any other i which Red Hl ron
Slide 3: Red Hill Iron Projects, Regional Setting and Key Events 2015
ea — REDHILLIRON RED HILL IRON PROJECTS PILBARA ‘ABN 44 116.553 302 REGIONAL SETTING Sa = RED HILL IRON ‘ABN 44 116.553 302 Key Events — 2015 lron Ore prices remain at 2008 levels e Significant increase in Resources and Reserves Suggested early focus on production from RHIOJV ground Feasibility work
Slide 4: Iron Ore Price and Red Hill Iron Ore Joint Venture Resources
5 REDHILLIRON = Limite Iron Ore price (delivered China) "USD/t =" AUD/t 62% Fe spot (CFR Tianjin port) Dollars per dry metric tonne Mar-08 Mar-09 Mar-10 Mar-11 Mar-12 Mar-13 Mar-14 Mar-15 Mar-16 Source: www.indexmundi.com = RED HILLIRON ABN 44 114.553 302 bad RED HILL IRON ORE JOINT VENTURE (RHI 19%
Slide 5: Pannawonica Project Resources and Reserves; Growth in Resource
=a Limited ABN 44 114.553 302 = REDHILLIRON PANNAWONICA PROJECT (RHI 100%) Mineral Resource Estimate (52% Fe cut-off). Classification - Mt | Fe (%)| SiOz (%) | Al2Os (%) | LOI (%) | P (%) (orc 2012) '@ (%) | SiOz (%) | AlzOs (%) | LOI (%) | P (%) Pannawonica Measured 55 | 538] 82 47 9.4 | 0.03 Indic
Slide 6: Location and Proposed Mine Site Infrastructure
= REDHILLIRON pe ino Jou ov eet Limited a awa 14559002 osmrs Pannawoniceg—— Deposits Zo LOCATION te on cs Proposed Central Processing Facility Sn [Ed Pannawonica Project 20km 3: s RED HILLIRON Limited PROPOSED MINE SITE INFRASTRUCTURE * Proposed Central Processing Plant been relocated to near the Ke
Slide 7: Proposed Mining Schedule and Way Forward
= Limi RED HILLIRON Proposed Mining Schedule — By JV 45 30 |siouv BAPLV & = GRHIOUV (OTHER) SRHION (RHI) . Bele FEEL 12 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Year ea = RED HILLIRON Limited WAY FORWARD 2015 2016 2017 2018 2019 2020 Nov Dec Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4/Q1 Q2 Q3 Q4/Q1 Q2 Q3 Q4 Q
Slide 8: Red Hill Iron Limited