Stelco Holdings Inc

Stelco — Corporate Update (June 2016)

12 slides from Stelco's corporate update, Jun 17, 2016

  1. Slide 1: Lake Erie Works Community Liaison Committee

    U. S. Steel Canada Inc. Lake Erie Works Community Liaison Committee June 17, 2016 John Benson © 2015 U. S. Steel Canada Inc.

  2. Slide 2: Community Liaison Committee Meeting Agenda

    Community Liaison Committee Meeting Agenda 1. Introductions 2. Coke Oven Emissions Overview 3. How has LEW performed under the Site Specific Standard Order – Particulates? 4. Site-Specific Standard – Benzene and Benzo[a]pyrene 5. Community Feedback 6. Adjournment U. S. Steel Canada Inc. 2

  3. Slide 3: U. S. Steel Canada Inc.

    U. S. Steel Canada Inc. 3

  4. Slide 4: Nanticoke location map

    \ \ \ \ \ — "| \ - 7 ‘= \ Nanticoke \ \ \ ae \ Hic! - ae “~ eo - ~ - — ro Sandy Gove Keadon Pagk =e": set ” fe a

  5. Slide 5: 5

    5

  6. Slide 6: Cokemaking Overview

    () Cokemaking Overview Charge Lid Emissions (SCC 3-03-003-14) Quench Tower Pushing Emissions (SCC 3-03-003-03) Standpipe Caps (SCC 3-03-003-14) 1 Door Emissions ; (SCC 3-03-003-08) = Charging Emissions } A (SCC 3-03-003-02) } I t s i : x \ / i * | é tt Coal Conveyor i \ , ne ( iS 1 £ 1! i ) Larry Ca

  7. Slide 7: Summary of Site-Specific Standard Order

    Summary of Site-Specific Standard Order Leaks and Charging • Weekday counts using US EPA Method 303 + some weekends • Do an Operational Adjustment (OA) if a daily limit is exceeded • Notify the MOECC of any OA’s in a 7 day period • Report to MOECC any exceedences of 30 day rolling limits Pushing • W

  8. Slide 8: Site-Specific Standard Order Report Card

    Site-Specific Standard Order Report Card Daily Observations - Coke Battery Date Doors Lids Off-takes Leaks and Charges (% Leaks) (% Leaks) (% Leaks) 2015 Limits (July 2 start) 54% 2% NA 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5 2020 Limits 5% 1% 4 January 1 – June 1, 2016 Range 0 – 18.60% 0 –

  9. Slide 9: Site-Specific Standard Order Report Card (cont'd)

    Site-Specific Standard Order Report Card (cont’d) 30-Day Rolling Averages - Coke Battery Date Doors Lids Off-takes Charging (sec) Leaks and Charges (% Leaks) (% Leaks) (% Leaks) (log avg) 2015 Limits (July 2 start) 38% 0.8% 25% 12 sec 2016 Limits 22.5% 0.8% 15% 12 sec 2017-2019 Limits 7% 0.8% 4.2% 1

  10. Slide 10: Site-Specific Standard Order Report Card (cont'd)

    Site-Specific Standard Order Report Card (cont’d) Daily Observations – Pushing - Coke Battery Date Pushing Emission (opacity %) Pushing 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% January 1 – June 1, 2015 Range 0 – 43.3% Average 6.99% All required Pushing measurements wer

  11. Slide 11: Site-Specific Standards – Benzene and B[a]P

    Site-Specific Standards – Benzene and B[a]P Benzo[a]Pyrene • controls are similar to the SSS - Particulates • B[a]P is attached to particulates • controlled by visible emission observations limits Benzene • expansion of the Leak Detection and Repair program • identification of other sources of fugit

  12. Slide 12: Adjournment

    Adjournment Thank You for taking time to be part of the Lake Erie Works Community Liaison Committee U. S. Steel Canada Inc. 12

Stelco Holdings — Corporate Update (June 2016) on 6ix