Apollo Minerals Limited · ASX:AON

Apollo Minerals — Investor Presentation (November 2012)

32 slides from Apollo Minerals's investor presentation, November 2012

  1. Slide 1: Moving ahead… Investor briefing

    Slide 1: Moving ahead… Investor briefing

    April 2012 Moving ahead… Investor briefing November 2012 Gina rail www siding,.apollominerals Commonwealth Hill, South Australia .com.au

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer 2 This presentation has been prepared by Apollo Minerals Limited (“Apollo” or the “Company”). It should not be considered as an offer or invitation to subscribe for, or purchase any, securities in the Company or as an inducement to make an offer or invitation with respect to those securit

  3. Slide 3: Table of contents

    Slide 3: Table of contents

    Table of contents 3  Company overview  Iron ore expertise  Key projects  Commonwealth Hill Fe (SA)  Titan Base and Precious Metals (SA)  Kango North (Gabon) Moving ahead  Mt Oscar Main and Mt Oscar East Fe (WA)  Summary  Market comparisons

  4. Slide 4: Iron ore developer

    Slide 4: Iron ore developer

    Iron ore developer 4 …but keeping an eye on the other metals! 1 Fe Direct Shipping Ore (DSO) Style Mineralisation 2 Super Premium Fe Concentrates Moving ahead 3 IOCGU and Ni-S ...with strong potential for significant base and precious metals.

  5. Slide 5: Company overview

    Slide 5: Company overview

    Company overview 5 Well placed for significant growth Company overview Executive and Board Source of funds  Iron ore focused Tony Ho - Chairman  Multiple projects Dominic Tisdell - Exec. Director, COO  PFS Stage in SA Richard Shemesian - Exec. Director  High quality products Matthew Rimes - Non-

  6. Slide 6: Seaborne iron ore demand

    Slide 6: Seaborne iron ore demand

    Seaborne iron ore demand 6 Long-term growth remains intact Iron ore and steel demand forecasts  Structural demand / pricing drivers remain intact ie population, urbanisation and industrialisation  Outside of GFC ‘great depression’ in ’08 –’09, iron ore prices have averaged $110 - $140 / t for 5 yr

  7. Slide 7: Apollo's advantages

    Slide 7: Apollo's advantages

    Apollo’s advantages 7 Quality infrastructure. Quality technicals. Apollo Advantages  Quality iron ore development team assembled (ex-Rio Tinto and Iron Ore Holdings)  Very low initial strip ratio potential - 0.5 to 1 (W:O)  Course grained mineralisation = lower costs  Able to produce high qualit

  8. Slide 8: Jindal Steel & Power

    Slide 8: Jindal Steel & Power

    Jindal Steel & Power 8 Apollo’s newest significant shareholder Corporate Snapshot Locations Iron Ore & Power Hot Briquetted Steel Pellet Plant Coal Mining Generation Iron (HBI) 3 mtpa 15 mtpa 2,113 MW 1.5 mtpa 5 mtpa  Leading Indian player in steel, power, mining, oil & gas and infrastructure Jinda

  9. Slide 9: Apollo Management Team

    Slide 9: Apollo Management Team

    Apollo Management Team 9 Strong resources industry experience •Dominic Tisdell – Executive Director and Chief Operating Officer (B Engineering (Mining), MBA) •15 years experience in mining, resources M&A and management consulting with Rio Tinto, Mitsubishi Corporation and Accenture. Key project deve

  10. Slide 10: Table of contents

    Slide 10: Table of contents

    Table of contents 10  Company overview  Iron ore expertise  Key projects  Commonwealth Hill Fe (SA)  Titan Base and Precious Metals (SA)  Kango North (Gabon) Moving ahead  Mt Oscar Main and Mt Oscar East Fe (WA)  Summary  Market comparisons

  11. Slide 11: Commonwealth Hill

    Slide 11: Commonwealth Hill

    Commonwealth Hill 11 A competitive iron ore development Key Characteristics  Potential for very large resource and long mine life  Lower risk processing  Demonstrated high quality, high SA has 2 new iron OneSteel: value products ore producers as of $300m 2012 Giffen Well (WPG)  Lower capital cos

  12. Slide 12: Exploration & resource definition

    Slide 12: Exploration & resource definition

    Exploration & resource definition 12 Advancing our iron ore resources  Sequoia (2012) Railway North  JORC Resource: 72Mt @ 26% Fe including 5Mt @ 40% Fe  Expl. Target: 100 – 150Mt at 25 – 35% Fe Wirrida  30km of similarly prospective strike identified Sequoia East (Ni-Cu-PGM) (Discovery) Ibis Se

  13. Slide 13: Sequoia maiden JORC Resource

    Slide 13: Sequoia maiden JORC Resource

    Sequoia maiden JORC Resource 13 A tip of the Iron Ore Iceberg Tonnes Fe SiO2 Al2O3 P S LOI Type mt % % % % % % Oxide 20.6 25.8 45.9 6.5 0.06 0.07 2.3 Total Fresh 32.1 24.9 47.5 6.3 0.07 0.09 0.9 Total 52.6 25.3 46.8 6.4 0.06 0.09 1.3 Oxide 0 0 0 0 0 0 0 Indicated Fresh 19.4 27.7 46 5.3 0.06 0.12 0.0

  14. Slide 14: Excellent infrastructure

    Slide 14: Excellent infrastructure

    Excellent infrastructure 14 3rd party, multi-user rail and port services  1st class rail services  At Commonwealth Hill iron ore deposit and prospects  High quality below rail engineering Gina rail siding at Commonwealth Hill Nearby Rankin Dam rail siding (ASX: IXR)  Above rail competition  Rol

  15. Slide 15: Premium products

    Slide 15: Premium products

    Premium products 15 High purities at exceptional sizings  Sought after haematite sinter fines product at circa 60% Fe  Super premium blended sinter fines product at 67-68% Fe  High quality magnetite pellet feed at 69% Fe 69% Fe Sequoia Concentrate (P80 = 143 µm) Concentrate Grades Company Project

  16. Slide 16: Positive Scoping Study

    Slide 16: Positive Scoping Study

    Positive Scoping Study 16 Long-life, high quality Sequoia Scoping Study Highlights  Simple processing and infrastructure paths identified and assessed  Mineable inventory of 131Mt Run of Mine (ROM)  Initial strip ratio of 0.5:1, LOM 1.1:1 (tonnes of waste per ROM tonne)  Open cut mine life of ap

  17. Slide 17: Positive Scoping Study

    Slide 17: Positive Scoping Study

    Positive Scoping Study 17 …with opportunity for further enhancement Capital Costs US$M Operating Costs A$/t US$/t Studies and approvals 16 Mining & rehabilitation 22.3 19.1 Process plant 182 Processing 22.6 19.4 Process infrastructure 91 Product logistics 34.6 29.6 Logistics 44 Direct capital total

  18. Slide 18: Table of contents

    Slide 18: Table of contents

    Table of contents 18  Company overview  Iron ore expertise  Key projects  Commonwealth Hill Fe (SA)  Titan Base and Precious Metals (SA)  Kango North (Gabon) Moving ahead  Mt Oscar Main and Mt Oscar East Fe (WA)  Summary  Market comparisons

  19. Slide 19: Titan Base Metals Project

    Slide 19: Titan Base Metals Project

    Titan Base Metals Project 19 An emerging base metals hotspot Gold Cairn Hill Ni-Cu-PGM Peculiar Knob Fe-Cu-Au-U Prominent Hill Fe Challenger Apollo Durkin Minerals Moving ahead Aristachaus Olympic Dam Carrapateena

  20. Slide 20: Titan Base Metals Project

    Slide 20: Titan Base Metals Project

    Titan Base Metals Project 20 Regional geological understanding evolving IOCG(U) Frontier ??? IOCG(U) Frontier Moving ahead G.M. Swain et al. / Precambrian Research 139 (2005) 164–180

  21. Slide 21: Wirrida Prospect: Strong Ni-S potential

    Slide 21: Wirrida Prospect: Strong Ni-S potential

    Titan Base Metals Project 21 Wirrida Prospect: Strong Ni-S potential Wirrida Igneous Complex  Very large (10 – 7km), Fe rich, layered ultramafic – felsic Moving ahead igneous intrusive  Obvious surface metal depletion  Petrology notes widespread sulphides and supersaturation during formation -> p

  22. Slide 22: Table of contents

    Slide 22: Table of contents

    Table of contents 22  Company overview  Iron ore expertise  Key projects  Commonwealth Hill Fe (SA)  Titan Base and Precious Metals (SA)  Kango North (Gabon) Moving ahead  Mt Oscar Main and Mt Oscar East Fe (WA)  Summary  Market comparisons

  23. Slide 23: Kango North Project Highlights

    Slide 23: Kango North Project Highlights

    Kango North Project 23 Highlights Helping develop Africa’s iron ore industry  Granted ~400km2 iron ore and gold Exploration Licence  Gabon - one of Africa’s most politically stable and economically developed countries  Iron ore occurrences exist over > 20km strike  Exceptional product quality es

  24. Slide 24: Kango North Project Advantage, Infrastructure

    Slide 24: Kango North Project Advantage, Infrastructure

    Kango North Project 24 Advantage, Infrastructure 1st class location  85km from Panamax capable, Port Owendo  20km from standard-gauge, 10mtpa Trans-Gabon railway (TGR)  Within 20km of two hydroelectric dams (127 MW total)  Sealed road within 30km of site Gina rail siding Moving ahead  High-use

  25. Slide 25: Kango North Project Geology

    Slide 25: Kango North Project Geology

    Kango North Project 25 Geology Highly prospective ground in an under-explored province  ~400km2 located in the heart of West Africa’s emerging world-class iron ore province  Typical West African iron ore prospect with potential for large-scale and DSO-grade caps  Sub-cropping iron ore mineralisat

  26. Slide 26: Kango North Project Product quality

    Slide 26: Kango North Project Product quality

    Kango North Project 26 Product quality Early indications of exceptional product qualities  DTR testing carried out by AMDEL, Adelaide on samples of surface and near-surface BIF  Very high quality iron ore concentrate produced with a very high mass recovery (49%) and coarse grind size (75µm)  Oper

  27. Slide 27: Table of contents

    Slide 27: Table of contents

    Table of contents 27  Company overview  Iron ore expertise  Key projects  Commonwealth Hill Fe (SA)  Titan Base and Precious Metals (SA)  Kango North (Gabon) Moving ahead  Mt Oscar Main and Mt Oscar East Fe (WA)  Summary  Market comparisons

  28. Slide 28: Mt Oscar

    Slide 28: Mt Oscar

    Mt Oscar 28 Large iron ore asset situated in premier hub Key characteristics  30km from proposed Proposed deep multi-user Port Anketell water port export facility  Exploration Target* 350 – 650mt at 30 – 37% Fe  Low capital costs for off-site services  Phased development Moving ahead i.e. start

  29. Slide 29: Mt Oscar exploration & development

    Slide 29: Mt Oscar exploration & development

    Mt Oscar exploration & development 29 Strong drilling results. Saleable products. Significant exploration and metallurgy results  Demonstrated wide intercepts  192m @ 35.9% Fe from 25m  271m @ 34.8% Fe from 14m  101m @ 33.6% Fe from 110m  Saleable products i.e. Fe > 60% and (SiO2 + Al2O3) < 8%

  30. Slide 30: Table of contents

    Slide 30: Table of contents

    30 Table of contents  Company overview  Iron ore expertise  Key projects  Commonwealth Hill Fe (SA)  Titan Base and Precious Metals (SA)  Kango North (Gabon) Moving ahead  Mt Oscar Main and Mt Oscar East Fe (WA)  Summary  Market comparisons

  31. Slide 31: Market comparables

    Slide 31: Market comparables

    Market comparables 31 Significant upside at current levels A$m 1,200 1,000 982 800 600 Developer Producer Moving ahead 400 289 222 200 212 200 102 43 34 55 11 0 Apollo Harranga Austral - Centrex Iron Road Western Equatorial Northern Grange Arrium Minerals asian Desert Resources Iron Resources Resour

  32. Slide 32: Investor Contact

    Slide 32: Investor Contact

    ASX Code: AON 32 Investor Contact: Dominic Tisdell Chief Operating Officer Ph: +61 2 9078 7660 dominic@apollominerals.com.au Moving ahead The information in this document that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Derek Pang, a Membe

Source: Internet Archive copy of apollominerals.com.au

More decks from Apollo Minerals Limited