Magnetite Mines Ltd. · ASX:MGT

Magnetite Mines — Royal Resources — Shareholder Meeting (November 2012)

24 slides from Magnetite Mines's shareholder meeting presentation, Nov 27, 2012

  1. Slide 1: 2012

    Slide 1: 2012

    2012

  2. Slide 2: AGM – Royal Resources Limited, 27 November 2012

    Slide 2: AGM – Royal Resources Limited, 27 November 2012

    DVB aye ROYAL RESOURCES LIMITED 27% November, 2012

  3. Slide 3: Disclaimer and Competent Person's Statement

    Slide 3: Disclaimer and Competent Person's Statement

    DISCLAIMER AND COMPETENT PERSON’S STATEMENT This presentation has been prepared by Royal Resources Limited (ABN 34 108 102 432) (“Royal”) based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the

  4. Slide 4: Outline: Corporate, Projects Update, Outlook

    Slide 4: Outline: Corporate, Projects Update, Outlook

    OUTLINE Corporate Projects Update Outlook 2012 Slide 4

  5. Slide 5: Capital Structure & Share Holdings

    Slide 5: Capital Structure & Share Holdings

    CAPITAL STRUCTURE & SHARE HOLDINGS Rank Name % Issued Shares c306 million 1 LODESTONE EQUITIES LIMITED 19.51 2 HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED 12.71 Share Price $0.075 3 RAGGED RANGE MINING PTY LTD & ASSOCIATES 7.26 4 CITICORP NOMINEES PTY LIMITED 4.49 Market Capitalisation c$25 million 5

  6. Slide 6: Royal's 12 Month Share Price Performance & Liquidity

    Slide 6: Royal's 12 Month Share Price Performance & Liquidity

    ROYAL’S 12 MONTH SHARE PRICE PERFORMANCE & LIQUIDITY 2012 Slide 6

  7. Slide 7: Corporate

    Slide 7: Corporate

    CORPORATE Lodestone Equities Limited bought out the SinTang Development Pte Ltd block of Royal shares and has become a significant shareholder in Royal A capital raising of approx. $3.7 Million was undertaken at a 14% premium to the market share price at the time. The placement was made to Lodestone

  8. Slide 8: Another Way to Communicate with Shareholders!

    Slide 8: Another Way to Communicate with Shareholders!

    ANOTHER WAY TO COMMUNICATE WITH SHAREHOLDERS! 2012 Slide 8

  9. Slide 9: Outline: Corporate, Projects Update, Outlook

    Slide 9: Outline: Corporate, Projects Update, Outlook

    OUTLINE Corporate Projects Update Outlook 2012 Slide 9

  10. Slide 10: Projects Update

    Slide 10: Projects Update

    PROJECTS UPDATE 2012 Slide 10

  11. Slide 11: Non Core Projects

    Slide 11: Non Core Projects

    NON CORE PROJECTS Royal exited the Pilbara on the basis of the stranded nature of the prospects and the lack of size potential The Warriedar Iron and Gold JVs were exited for a total consideration of $8 million, alleviating the need for capital raising during the year Successfully finalised the disp

  12. Slide 12: Red Dragon Venture – Four Areas Established & Two Areas Explored

    Slide 12: Red Dragon Venture – Four Areas Established & Two Areas Explored

    RED DRAGON VENTURE – FOUR AREAS ESTABLISHED & TWO AREAS EXPLORED Razorback  Iron Peak  Iron Back Hill  Interzone  Dragon’s Head Manunda 2012 Slide 12

  13. Slide 13: Red Dragon Venture: 3 Billion tonnes in total resources

    Slide 13: Red Dragon Venture: 3 Billion tonnes in total resources

    RED DRAGON VENTURE: 3 Billion tonnes in total resources In two years, Royal has grown the total resource to 3 Bt, the second largest resource in Australia and the largest outside WA Three deposits have been defined Total costs in defining those Resources is less than $0.009/t Sufficient resources no

  14. Slide 14: Razorback Premium Iron Project: 1.8 Billion tonnes of resources

    Slide 14: Razorback Premium Iron Project: 1.8 Billion tonnes of resources

    RAZORBACK PREMIUM IRON PROJECT : 1.8 Billion tonnes of resources Current Inferred and Indicated Resources at the Razorback Deposit stand at: JORC Resource Million Fe% SiO2% Al2O3% P% Classification Tonnes Inferred 621 19.9 45.6 7.40 0.24 Indicated 1193 21.5 43.3 7.07 0.20 Total 1815 21 44.1 7.2 0.22

  15. Slide 15: Razorback: Pre-Feasibility Study near completion

    Slide 15: Razorback: Pre-Feasibility Study near completion

    RAZORBACK PREMIUM IRON PROJECT: Pre-Feasibility Study near completion* Completed To be done Pit optimisation with annual Risk analysis mining schedule Financial Model Beneficiation plant – flow sheet Train load-out and transport to Pt Pirie Slurry pipeline options Ship loading options Getting the PF

  16. Slide 16: Razorback: Preliminary open pit design

    Slide 16: Razorback: Preliminary open pit design

    RAZORBACK PREMIUM IRON PROJECT : Preliminary open pit design 2012 Slide 16

  17. Slide 17: Razorback: Beneficiation plant layout

    Slide 17: Razorback: Beneficiation plant layout

    RAZORBACK PREMIUM IRON PROJECT : Beneficiation plant layout 2012 Slide 17

  18. Slide 18: Razorback: Train load out option

    Slide 18: Razorback: Train load out option

    RAZORBACK PREMIUM IRON PROJECT : Train load out option 2012 Slide 18

  19. Slide 19: Razorback: Transport options

    Slide 19: Razorback: Transport options

    RAZORBACK PREMIUM IRON PROJECT : Transport options 2012 Slide 19

  20. Slide 20: Razorback: Native Title

    Slide 20: Razorback: Native Title

    RAZORBACK PREMIUM IRON PROJECT : Native Title An exploration Native Title Mining Agreement is in place A mining Native Title Mining Agreement has begun to be negotiated in preparation for a Mining Licence Proposal application A compensation package for the mining NTMA is likely to include (based on

  21. Slide 21: Razorback: Scoping Study Financials

    Slide 21: Razorback: Scoping Study Financials

    RAZORBACK PREMIUM IRON PROJECT : Scoping Study Financials Over 800Mt of higher cost iron ore needs to drop out of the seaborn iron market before affecting the RPIP product – RPIP is robust* Range of RPIP CFR OPEX * RPIP 2012 * Based on preliminary assessment; to be finalised CFR: Cost & Freight Sour

  22. Slide 22: Outline: Corporate, Projects Update, Outlook

    Slide 22: Outline: Corporate, Projects Update, Outlook

    OUTLINE Corporate Projects Update Outlook 2012 Slide 22

  23. Slide 23: Razorback: Next steps

    Slide 23: Razorback: Next steps

    RAZORBACK PREMIUM IRON PROJECT : Next steps 2012 2013 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Drilling to define min 1Bt Pre Feasibility Study (PFS) PFS Optimisation Feasibility Study Funding Feasibility Study Permitting & Native Title Project Financing Board Approval

  24. Slide 24: A Mountain of Iron

    Slide 24: A Mountain of Iron

    A MOUNTAIN OF IRON 2012 Slide 24

Source: Internet Archive copy of magnetitemines.com

More decks from Magnetite Mines Ltd.

All 45 Magnetite Mines decks