Theta Gold Mines Ltd. · ASX:TGM

Theta Gold Mines — Cape Town Mining Indaba 2022

37 slides from Theta Gold Mines's conference presentation, May 10, 2022

  1. Slide 1: High Growth, Low-Cost Gold Developer

    For personal use only HIGH GROWTH, LOW-COST GOLD DEVELOPER 6.1MOZ GOLD RESOURCE & GROWING DFS NEAR COMPLETION CEO PRESENTATION - CAPE TOWN MINING INDABA – MAY 2022

  2. Slide 2: Disclaimer

    For personal use only DISCLAIMER FORWARD LOOKING AND CAUTIONARY STATEMENTS DISCLAIMER AND COMPETENT PERSONS STATEMENT This presentation may refer to the intention of Theta Gold Mines regarding estimates or future events which could DISCLAIMER be considered forward looking statements. Forward looking

  3. Slide 3: Overview: Corporate

    For personal use only OVERVIEW CORPORATE 3

  4. Slide 4: Theta Gold Highlights

    THETA GOLD HIGHLIGHTS Ø 6.1Moz gold resource @4.17g/t and growing For personal use only Ø Geological models show gold mineralization fluids have been derived from the Bushfeld complex, the richest metallogenic province on earth Ø Current DFS will deliver a bigger production profile with Low capital

  5. Slide 5: About Theta Gold

    About Theta Gold Theta Gold Mines Limited controls and dominates the For personal use only Eastern Transvaal Gold Fields, where South Africa’s gold mining industry began almost 130 years ago. And we’re bringing this large forgotten historical shallow goldfield back to life. The Transvaal Gold System

  6. Slide 6: Compelling Investment Rationale

    COMPELLING INVESTMENT RATIONALE INVESTMENT CASE For personal use only SIZE INVESTOR POTENTIAL GROWTH LOW-COST EXPERIENCED FLEXIBILITY POSITIVE VALUE PRODUCER TEAM SOCIO-ECONOMIC IMPACT +6.1Moz of Gold Undervalued Low-cost expansion +160koz pa (within Production costs Resource Multiple entry points 1

  7. Slide 7: Team of Experts

    TEAM OF EXPERTS BILL GUY MITFORD MUNDELL JACQUES DU TRIOU For personal use only CHAIRMAN CEO COO Former CEO of Namakwa Over 16 years at Harmony Gold. Ex-Jupiter Mines Ltd (ASX: JMS) Led the Doornkop South Reef Chief Exploration Manager. (Jupiter Diamonds, commissioned and expanded profitable product

  8. Slide 8: ASX Listing

    ASX LISTING For personal use only Ordinary Shares ASX: TGM 550m Unlisted options and management performance 41.97m rights Market Capitalisation (undiluted) ~A$72M (~US$52M) 61% Top 10 shareholding 8% Directors & Management 8

  9. Slide 9: Project Overview

    For personal use only PROJECT OVERVIEW 9

  10. Slide 10: South Africa's Golden Triangle

    SOUTH AFRICA’S “GOLDEN TRIANGLE” THETA GOLD – 6.1MOZ DEVELOPER – TO PRODUCE >160KOZ/A For personal use only SA host the 3rd largest gold reserves in the world (~6,000T Au) 10

  11. Slide 11: UG Mines Targeted First Out of Potential >40

    For personal use only 6 UG MINES TARGETED FIRST OUT OF POTENTIAL >40 5 solid growth potential 2 3 Modern mining and treatment Develop multiple mines, methodologies enable 1 reaching >160koz/a within low-cost operations (AISC five years, from the resource US$900/oz) and reserve base of +6Moz expansio

  12. Slide 12: Strategy to Build Up to >160,000oz/a Au Production Profile

    STRATEGY TO BUILD UP TO >160,000OZ/A AU PRODUCTION PROFILE WITHIN 5 YEARS (ONLY 6 OF >40 PRE-DEVELOPED MINES) For personal use only PHASE 1 PHASE 2 PHASE 3 COMMISSION COMMISSION COMMISSION Current 5 Year DFS Stage TBA (PFS was ~60koz/a) ramp up >160koz/a targeted • 4 mining production units • Expand

  13. Slide 13: Financial Projections (PFS 2021)

    For personal use only FINANCIAL PROJECTIONS(PFS 2021) 13

  14. Slide 14: TGME Underground Initial Pre-Feasibility Study 2021

    TGME UNDERGROUND INITIAL PRE-FEASIBILITY STUDY 2021 FIRST 16 % OF UNDERGROUND MINERAL For personal use only RESOURCE Pay-back period from Pay-back period from start of mining 22 first gold 13 months months By third year of production, 419 Koz delivered to almost 70 koz / year plant over Life of Mine

  15. Slide 15: Low-Cost Sustainable Gold Producer with High Margins

    LOW-COST SUSTAINABLE GOLD PRODUCER WITH HIGH MARGINS COST DRIVERS For personal use only PHASE 1 UG $2,000 Upside gold MARGIN $1,750 Price potential Near surface Pre-developed, Modern mining gold reefs multiple entry methods – safe, $1,500 points (flexibility) productive GOLD PRICE (US$) $1,250 >50%

  16. Slide 16: Low-Cost Sustainable Gold Producer with High Margins

    LOW-COST SUSTAINABLE GOLD PRODUCER WITH HIGH MARGINS For personal use only $900 FORECAST TO BE LOWEST COST PRODUCER IN SOUTH AFRICA AND LOWEST COST QUARTILE AUSTRALIAN PRODUCER 16

  17. Slide 17: Production Units

    PRODUCTION UNITS DEVELOPMENT DRILL RIG DEFINED ONE PRODUCTION UNIT: SEVEN PRODUCTION UNITS: For personal use only PRODUCE 15-20 KT/M (20-30KOZ/A) PRODUCE 100-140 KT/M (UPGRADED TO FEED 80KT/M TO MILL) (>160KOZ/A) MINING FLEET • 2 Dev Drill Rig ($1.6m) HUMAN RESOURCES • 2 Stoping LH Drill Rig ($3m) •

  18. Slide 18: UG PFS Financial Results (New Expanded DFS Out in June 2022)

    PHASE 1 UG PFS FINANCIAL RESULTS (NEW EXPANDED DFS OUT IN JUNE 2022) • YEAR 7-8 CAPACITY NOT UTILIZED (EXCLUSION OF INFERRED RESOURCES) • WITH THE PLANT CAPACITY FULLY UTILIZED AISC CAN BE MAINTAINED AT US$800/OZ For personal use only UG Operations Unit Forecast 1,500 1,600 1,700 1,800 2,000 NPV @ 5

  19. Slide 19: Other Highlights

    For personal use only OTHER HIGHLIGHTS 19

  20. Slide 20: Environmental, Social & Governance (ESG)

    ENVIRONMENTAL, SOCIAL & GOVERNANCE (ESG) ESG IS INTEGRAL TO THE DEVELOPMENT STRATEGY AND IS For personal use only BASED ON: • Holistic risk management • Conservation of biodiversity • Zero harm approach to health and safety • Responsible production practices • Environmental stewardship • Positive im

  21. Slide 21: Environmental Approvals

    ENVIRONMENTAL, SCOPING REPORT SUBMITTED, ENVIRONMENTAL APPROVALS COMMUNITY SUPPORTS CONTINUES PROGRESS (MR83) Task Duration Status For personal use only Submit application for EA Q3 2021 ü Submit draft scoping report Q1 2022 ü Specialists EIA Studies Completed Q1 2022 ü DMRE acceptance of final Scop

  22. Slide 22: Progress Towards Production

    PROGRESS TOWARDS PRODUCTION ACTIVITIES For personal use only • High grade Rietfontein Mine PFS completed and added as fourth mine into DFS. • Further metallurgical test work on Sulphide ore from Frankfort Mine and free milling ore from Beta, CDM and Rietfontein mines. FUNDING • All inputs to DFS fin

  23. Slide 23: Closing Remarks

    CLOSING REMARKS Ø High growth investment opportunity For personal use only Ø 6.1Moz gold resource @4.17g/t with multiple short term resource expansion opportunities from existing pre-developed mines Ø A solid initial production profile of over 60koz/a, then building to 160koz/a within five years Ø L

  24. Slide 24: Question Time

    For personal use only QUESTION TIME WWW.THETAGOLDMINES.COM BILL GUY MITFORD MUNDELL CHAIRMAN CEO Email: billg@thetagoldmines.com Email: mitfordm@tgme.co.za TICKER: TGM (TRADE IN AU$) TICKER: TGMGF (TRADE IN US$) 24

  25. Slide 25: Appendices

    For personal use only APPENDICES 25

  26. Slide 26: Combined Mineral Resource Statement (~6.1Moz)

    COMBINED MINERAL RESOURCE STATEMENT - (~6.1MOZ) Combined Mineral Resource For personal use only Resource Classification Type of Operation Tonnage Gold Grade Gold Content Mt g/t Kg koz Underground 0.091 5.37 489 15.7 Measured Open pit Tailings Total Measured 0.091 5.37 489 15.7 Underground 4.774 6.21

  27. Slide 27: Mineral Resource Statement - Underground (~4.5Moz)

    MINERAL RESOURCE STATEMENT - UNDERGROUND (~4.5MOZ) Mineral Resource Reef Grade Stope Grade Reef Width Stope width Content Reef Tonnes Stope Tonnes Au Content Mine Reef For personal use only Classification g/t g/t cm cm cm.g/t Mt Mt kg koz Measured Frankfort Bevetts 7.13 5.37 73 103 520 0.069 0.091 4

  28. Slide 28: Mineral Resource Statement - Open Pit (~1.4Moz)

    MINERAL RESOURCE STATEMENT – OPEN PIT (~1.4MOZ) Reef Grade Reef Width Content Reef Tonnes Au Content Mineral Resource Classification Open Pit Mine Reef For personal use only g/t cm cm.g/t Mt kg koz Hermansburg Eluvial 1.79 0 0 0.505 905 29.1 DG1 Eluvial 2.24 0 0 0.640 1 432 46.0 DG2 Eluvial 0.66 0 0

  29. Slide 29: Ore Reserve Statement

    ORE RESERVE STATEMENT Grade Tonnes Au Content For personal use only Ore Reserve Classification Operation g/t kt kg koz Proved 4,24 60 254 8,16 Frankfort Total Proved 4,24 60 254 8,16 Beta 6,51 1 662 10 822 347,94 Frankfort 4,11 259 1 063 34,16 Probable CDM 2,31 385 889 28,58 Theta Project (MR 83) 2,

  30. Slide 30: A Century of Historical Data

    For personal use only A CENTURY OF HISTORICAL DATA 30 30

  31. Slide 31: Multiple Access Points into Pre-Developed Mines

    For personal use only MULTIPLE ACCESS POINTS INTO PRE- DEVELOPED MINES (DESIRE MINE ACCESS) 31 31 31

  32. Slide 32: Excellent Ground Conditions

    For personal use only EXCELLENT GROUND CONDITIONS (FROM NEAR A CENTURY AGO) 32 32

  33. Slide 33: "Old Gold" Mining Opportunities

    For personal use only “OLD GOLD” MINING OPORTUNITIES (PACKED NEATLY NEAR A CENTURY AGO) 33 33

  34. Slide 34: Frankfort Mine Preparing for Trial Mining (Nov 2021)

    For personal use only FRANKFORT MINE PREPARING FOR TRIAL MINING (NOV 2021) 34 34

  35. Slide 35: Example of Flat Reef System (Frankfort Mine)

    For personal use only EXAMPLE OF FLAT REEF SYSTEM (FRANKFORT MINE) 35 35

  36. Slide 36: Long Hole Stoping Trial Mining at Frankfort Mine

    For personal use only LONG HOLE STOPING TRIAL MINING AT FRANKFORT MINE 36 36

  37. Slide 37: Old Plant Demolished Ready for New Plant Build (April 2022)

    For personal use only OLD PLANT DEMOLISHED READY FOR NEW PLANT BUILD (APRIL 2022) 37 37

Theta Gold Mines — Cape Town Mining Indaba 2022 on 6ix