Elia Group Sa/nv · EURONEXT:ELI
Elia Group Sa/nv — Investor Presentation (January 2024)
31 slides from Elia Group Sa/nv's investor presentation, Jan 26, 2024
Slide 1: Users' Group Working group Belgian Grid
25/01/2024 Users’ Group Working group Belgian Grid 26 januari 2024 Username: usersgroup@elia.be Password: bqKOlr68 1 Agenda 1. Hosting capacity maps – stakeholder feedback 2. Aansluitingsproces – eerste reflecties 3. Grid User Flex for congestion management – stand van zaken en next steps 4. Connect
Slide 2: Agenda; Hosting Capacity Maps
25/01/2024 Agenda 1. Hosting capacity maps – stakeholder feedback 2. Aansluitingsproces – eerste reflecties 3. Grid User Flex for congestion management – stand van zaken en next steps 4. Connection contract – eerste feedback naar aanleiding van de consultatie 5. Miscellaneous 5.1. CREG – gedragscode
Slide 3: Roadmap to publication of Hosting Capacity Maps
25/01/2024 Roadmap to publication of Hosting Capacity Maps WG Belgian Grid: 26/01/2024 R. Devolder & I. Verbruggen 5 Context The main objective of this initiative is • to pro-actively support the evolution of the Belgian energy mix as well as the electrification of consumption • by communicating, in
Slide 4: Planning and milestones
25/01/2024 Planning and milestones WG Belgian Grid WG Belgian Grid – 07/12/2023 – – 16/02/2023 – Presentation & 1st stakeholder publication of workshop: Annual publication of WG Belgian Grid Hosting Capacity Identification of needs, Maps Hosting Capacity Maps – 17/05/2023 – relevant hypotheses & WG
Slide 5: Next steps
25/01/2024 Next steps • All feedback/recommendations can be sent to usersgroup@elia.be before 01/03/2024 • For any further questions, existing grid users can contact their Key Account Manager • New grid users/others can contact Elia through hostingcapacitymap@elia.be • Q4/2024: publication of the V2
Slide 6: Agenda; Aansluitingsproces
25/01/2024 Agenda 1. Hosting capacity maps – stakeholder feedback 2. Aansluitingsproces – eerste reflecties 3. Grid User Flex for congestion management – stand van zaken en next steps 4. Connection contract – eerste feedback naar aanleiding van de consultatie 5. Miscellaneous 5.1. CREG – gedragscode
Slide 7: Connection process: first reflections
25/01/2024 Connection proces WG Belgian Grid: 26/01/2024 C. Bastiaensens 13 Connection process: first reflections – Elia wants to thank market parties for the feedback received – This is very valuable to take into account in our ongoing reflections – Feedback is still very welcome! – A lot of synerg
Slide 8: High level timeline: 2024
25/01/2024 High level timeline: 2024 Q1 Q2 Q3 26/1 WG BG 22/3 WG BG 27/6 WG BG 23/2 26/3 16/4 WS FL WS FL WS FL TBC Connection’ Current expectation CREG Presentation title 15 15 Thank you. 16 8
Slide 9: Agenda; Grid User Flex for congestion management
25/01/2024 Agenda 1. Hosting capacity maps – stakeholder feedback 2. Aansluitingsproces – eerste reflecties 3. Grid User Flex for congestion management – stand van zaken en next steps 4. Connection contract – eerste feedback naar aanleiding van de consultatie 5. Miscellaneous 5.1. CREG – gedragscode
Slide 10: Public Consultation and Incentive on Flexible Access
25/01/2024 Public Consultation and Incentive on Flexible Access WG Belgian Grid– 26/01/2024 26.01.2024 | A. Weynants 19 Agenda 1. Public consultation on the design note flexible access 2. Workshop on connections with flexible access 3. Congestion Management concepts WG BG - Grid User Flexibility - 2
Slide 11: 1. Public consultation on flexible access
25/01/2024 1. Public consultation on flexible access 21 Pre read Design Note on Connections with Flexible Access on the Federal Transport Grid : content 1. The Criteria justifying a limitation in guaranteed/permanent connection capacity 2. The methodology and assumptions used by Elia in estimating t
Slide 12: Public consultation wrap-up
25/01/2024 Pre read Public consultation wrap-up Goal of the Public Consultation : • Describe our current way of working w.r.t. client with flexible access at Federal Grid Level (e.g. EOS/EDS, contract, flex activation…) • Identify short/mid term adaptation needs in the Code of Conduct Duration of th
Slide 13: Next steps; The Grid is reaching the limits of its Hosting Capacity
25/01/2024 Next steps Report of the public consultation will be published soon The feedback from the Market Parties are an important input in order to prepare and initiate the workshops in the context of the incentive on connection with flexible access WG BG - Grid User Flexibility - 26.01.2024
Slide 14: 2. Workshop on Flexible access
25/01/2024 Limited flexibility can unlock additional hosting capacity Hosting Capacity for load without flexibility - 2026 Hosting Capacity for load with 5% flexibility* - 2026 During the workshops, we will assess the role of connection with flexible access in long term grid planning and evaluate in
Slide 15: Coming workshops
25/01/2024 Coming workshops First workshop planned on the 23/02/2024 Clarification on the planning and milestones of the ongoing initiatives related to flexible access and connection process Vision on Fundamental principles on connection with flexible access Second and third workshops planne
Slide 16: Limit of Grid Elements
25/01/2024 Limit of Grid Elements 31 Permanent and temporary limits of Grid Elements Permanent admissible limits : loading (in A or MVA) that can be accepted by a Grid Element for an unlimited duration without any risk for the material For some types of Grid Elements (e.g. overhead lines), the p
Slide 17: Grid Studies: analyzed situation and criteria
25/01/2024 Grid Studies : analyzed situation and criteria 33 Grid Connection Studies – analyzed situations The following grid situations are analyzed within the Grid Connection studies : N state : all the grid elements are available For each planned step of grid evolution, a new N state is studi
Slide 18: Practical case: study in North sea area
25/01/2024 Practical case : study in North sea area Considered steps of the planned Grid evolution 1) Asis 2) With Ventilus (2028) 3) With Boucle du Hainaut (2030) 4) With MOG 2 (as of Boucle du Hainaut) WG BG - Grid User Flexibility - 26.01.2024 35 35 Operation limits for the analyzed states The fo
Slide 19: Actions for solving congestion
25/01/2024 Actions for solving congestion 37 How to solve congestions ? General philosophy : Preventive actions : in N state – to avoid unacceptable situations All Grid Elements are below their permanent limits All Grid Elements are below their temporary limits for each simulated N-1 situation
Slide 20: Use Case
25/01/2024 Use Case 39 Keep the grid N-1 safe If outage, • All grid elements stay under 15min limits • N-1 safe again within 15 min. N situation Upstream Network Line B 65% 55% Line A R1 R2 80% R1 R2 WG BG - Grid User Flexibility - 26.01.2024 40 40 20
Slide 21: Keep the grid N-1 safe
25/01/2024 Keep the grid N-1 safe If outage, • All grid elements stay under 15min limits • N-1 safe again within 15 min. N situation is safe Upstream Network Line B 65% 55% Line A 1 N-1 Analysis R1 R2 80% 1 – Security Analysis R1 N-1 safe if outage? R2 WG BG - Grid User Flexibility - 26.01.2024 41 4
Slide 22: Keep the grid N-1 safe
25/01/2024 Keep the grid N-1 safe If outage, • All grid elements stay under 15min limits • N-1 safe again within 15 min. Charge on line “B” Upstream Network 2? Line B Measurand If outage N situation 120% Line A Limit 15 minutes Upstream Network Line B 65% 55% Line A N-1 Analysis R2 Permanent limit R
Slide 23: Keep the grid N-1 safe
25/01/2024 Keep the grid N-1 safe If outage, • All grid elements stay under 15min limits • N-1 safe again within 15 min. Charge on line “B” Upstream Network 2? Line B Measurand If outage N situation 120% Line A 3 Limit 15 minutes Upstream Network Line B 65% 55% Line A N-1 Analysis R2 Permanent limit
Slide 24: Appendix
25/01/2024 Thank you. 47 Appendix 48 24
Slide 25: CREG Incentive 2024: Vision et Roadmap sur la flexibilité
25/01/2024 CREG Incentive 2024 : “Vision et Roadmap sur la flexibilité pour la gestion des congestions et communication transparente sur l’activation de la flexibilité dans le cadre des contrats avec accès flexibles” Assurer la transparence des activations des installations raccordées avec accès fle
Slide 26: Agenda
25/01/2024 Thank you. 51 Agenda 1. Hosting capacity maps – stakeholder feedback 2. Aansluitingsproces – eerste reflecties 3. Grid User Flex for congestion management – stand van zaken en next steps 4. Connection contract – eerste feedback naar aanleiding van de consultatie 5. Miscellaneous 5.1. CREG
Slide 27: Connection contract
25/01/2024 Connection contract Eerste feedback naar aanleiding van de consultatie 53 53 Connection Contract WG Belgian Grid: 26/01/2024 F. Dessain 54 27
Slide 28: Objective for today's meeting; Timeline
25/01/2024 Objective for today’s meeting Capture first reactions on the text submitted for consultation on Dec 20th Go through answer to comments received during the informal consultation (sent Jan 24) Next steps/timing Consultation publique Contrat de Raccordement 55 55 Timeline 2023 2024 Sep
Slide 29: Topics triggering the most comments
25/01/2024 Topics triggering the most comments • Art. 8.2 Alarm-, nood-, black-out- of hersteltoestand • Art. 8.3 Overmacht • Art 12.1 Ingebrekestelling en/of schorsing van de uitvoering van het Contract in geval van niet-conforme of schadeverwekkende Installaties • Art. 13.1 Wijziging van het Contr
Slide 30: Miscellanious
25/01/2024 Agenda 1. Hosting capacity maps – stakeholder feedback 2. Aansluitingsproces – eerste reflecties 3. Grid User Flex for congestion management – stand van zaken en next steps 4. Connection contract – eerste feedback naar aanleiding van de consultatie 5. Miscellaneous 5.1. CREG – gedragscode
Slide 31: Volgende meetings
25/01/2024 Miscellanious Volgende meetings 61 61 Volgende meetings Werkgroep Belgian Grid – 22/03/2024 09:30u – 12:30u – 27/06/2024 13:00u – 16:00u – 01/10/2024 09:30u – 12:30u – 13/12/2024 09:30u – 12:30u Workshops Incentive Flexibele toegang – 23/02/2024 09:00u – 13:00u – 26/03/2024 09:00u – 13:00