Williams Companies, Inc. (the) · NYSE:WMB

Williams Companies, Inc. (the) — 2010 Maintenance Conference Call

19 slides from Williams Companies, Inc. (the)'s conference presentation, Mar 11, 2010

  1. Slide 1: 2010 Maintenance Conference Call

    2010 Maintenance Conference Call Thursday March 11, 2010 2:00 – 4:00 PM MST Call In # 1-866-608-9455 Pass code 8015846864 © 2007 The Williams Companies, Inc. All rights reserved.

  2. Slide 2: Agenda

    Agenda > Welcome > Maintenance Overview – Terry Hardman, Team Lead – Gas Control > Integrity/Pigging Overview – Mike Van Hook, Team Lead - Pipeline Integrity © 2007 The Williams Companies, Inc. All rights reserved. 2

  3. Slide 3: Maintenance: 2010 Preview

    Maintenance: 2010 Preview Terry Hardman, Team Lead – Gas Control © 2007 The Williams Companies, Inc. All rights reserved.

  4. Slide 4: Brief Overview

    Brief Overview > Seven different time periods with significant maintenance scheduled - April 13-19 - April 20-23 - May 4-7 - May 4-14 - June 8-11 - June 22-25 - July 19-24 • The “I” formation of projects • Intent is to minimize number of outages and total flow impact • Majority of work scheduled in

  5. Slide 5: Steps to Minimize Impacts to Customers

    Steps to Minimize Impacts to Customers > Minimize impact to customers: Dates are firm for now – however dates may change due to circumstances out of our control…….we apologize for that ahead of time. • Have consolidated multiple maintenance projects into the same outage, i.e. anomaly digs, compresso

  6. Slide 6: Muddy Creek to Plymouth Maintenance-April

    Muddy Creek to Plymouth Maintenance-April > April 6 – 8 114 MDth/d Impact • Pocatello C/S – Cyclone Separator Replacement > April 13 – 19 80 MDth/d Impact • Soda Springs – Lava loop line pigging • Buhl C/S annual Solar turbine inspections • Baker C/S loop line pigging facility modifications > April

  7. Slide 7: Vernal to La Plata Maintenance - April

    Vernal to La Plata Maintenance -April > April 19 – 23 134 MDth/d Impact • Pleasant View C/S – Annual ESD and Solar Inspection • LaPlata C/S – Annual ESD and Solar Inspection > April 27 – November 1 77 MDth/d Impact • Sundance Trail Project – Vernal Station Replacement Outage > April 27 – 28 335 MDth

  8. Slide 8: Muddy Creek to Plymouth Maintenance--May

    Muddy Creek to Plymouth Maintenance--May > May 4 – 7 220 MDth/d impact • Sundance Trail - set stopples fittings to tie-in at Muddy Creek • Burley C/S annual Solar turbine inspections • Mountain Home C/S loop line pigging facility modifications • Meacham C/S to Stanfield loop line pigging facility mo

  9. Slide 9: System Maintenance--June

    System Maintenance--June > June 2 – 3 335 MDth/d Impact • Sundance Trail-Vernal valve manifold tie-in > June 8 – 11 240 MDth/d impact • Soda Springs C/S unit #4 annual inspection • Buhl C/S pigging facility modifications • Boise C/S pigging facility modifications • Caldwell C/S pigging facility modi

  10. Slide 10: System Maintenance--July

    System Maintenance--July > July 13 – 17 351 MDth/d impact • Pleasant View Hydro test -- Montezuma County > July 19 – 24 75 MDth/d impact • Cassia County, Idaho mainline hydro test • Canyon County, Idaho mainline replacement & mainline hydro test > July 20 – 23 49 MDth/d Impact • Muddy Creek Annual E

  11. Slide 11: Wrap-up

    Wrap-up > Northwest will continue its efforts to minimize maintenance impacts to customers, including using surplus in Jackson Prairie > On-going updates and complete maintenance schedule on Northwest Passage • All dates in this presentation are subject to change • For the latest updates, please ref

  12. Slide 12: Maintenance Impact Projects

    Maintenance Impact Projects 2010 IMPACT PROJECTS (AS OF 3/9/10) Design Available Estimated Capacity Capacity Capacity Flow Reduction for the Gas Start Date End Date Potential Cut Point MDth/d MDth/d Direction Description / Location Day MDth/d Pocatello C/S Cyclone Separator 04/06/10 04/08/10 Pocatel

  13. Slide 13: Maintenance Impact Projects (Cont)

    Maintenance Impact Projects (Cont) 2010 IMPACT PROJECTS (AS OF 3/9/10) Design Available Estimated Capacity Capacity Capacity Flow Reduction for the Gas Start Date End Date Potential Cut Point MDth/d MDth/d Direction Description / Location Day MDth/d 05/25/10 05/27/10 Lava C/S 650 583 N Lava C/S Annu

  14. Slide 14: Managing System Integrity Through In-Line Inspections: 2009 Summary and 2010-12 Plans

    Managing System Integrity Through In-Line Inspections: 2009 Summary and 2010-12 Plans Mike Van Hook – Team Lead Pipeline Integrity © 2007 The Williams Companies, Inc. All rights reserved.

  15. Slide 15: NWP In-Line Inspection/Pigging Program

    NWP In-Line Inspection/Pigging Program Why a Pigging Program? • To maintain and demonstrate the Safety, Integrity and Reliability of our pipeline system • To comply with applicable regulations • ILI is our preferred assessment method Our Approach Prioritize pipeline segments to be in-line inspected

  16. Slide 16: In-Line Inspections Through 2009 and 2010 ILI Runs

    Sumas Through 2009 Total Mt. Vernon Total Miles of First Time In-Line Inspections 1475 (38%) Snohomish 2408 Couer D'Alene & 2409 Kellogg Lateral Sumner 2435 Ritzville to Spokane Meade Plymouth Washougal Chehalis Mesa 2414 Lewiston Lateral Zillah m ha eac Meacham to Plymouth 1400 Willard Roosevelt M

  17. Slide 17: 2011 ILI Runs

    Sumas 1408 Sedro Woolley 2408 Couer D'Alene & 2409 Kellogg Lateral Mt. Vernon 2428 & 2448 North Seattle 2435 Ritzville to Spokane Meade Snohomish Extensions 2414 Lewiston Lateral Sumner 2409 Kellogg Extension 1400 Meacham to Plymouth 2417 Yakima to Wenatchee Plymouth Washougal Chehalis 1401 Lava to

  18. Slide 18: 2012 ILI Runs

    Sumas Mt. Vernon 2408 Couer D'Alene & 2409 Kellogg Lateral 2435 Ritzville to Spokane Meade Snohomish 2414 Lewiston Lateral Sumner 1400 Meacham to Plymouth Plymouth Washougal 2497 Berwick Chehalis 1401 Lava to Pocatello 2492 Centralia Mesa Zillah 1401 Soda to Lava m ha ac M/S 2436 Washougal to SE Por

  19. Slide 19: Total ILI Miles by 2012 (2010-2012)

    Sumas Mt. Vernon Snohomish By 2012 Total Sumner Total Miles of First Time In-Line Inspections 2549 (65%) Plymouth Washougal Chehalis Zillah Mesa m ha ac Me Willard Roosevelt Goldendale Oregon City McMinnville k er r Ba R ive ake Albany Sn l el dw ngs e al m Ho Eugene C pri llo se gs in ot S e r oi t

Williams Companies — 2010 Maintenance Conference Call on 6ix