Fortis Inc. · TSX:FTS

Fortis — Investor Day (September 2023)

81 slides from Fortis's investor day presentation, Sep 19, 2023

  1. Slide 1: 2023 Investor Day

    2023 INVESTOR DAY September 19, 2023

  2. Slide 2: Forward Looking Information

    FORWARD LOOKING INFORMATION Fortis includes forward-looking information in this presentation within the meaning of applicable Canadian securities laws and forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 (collectively referred to as "forward-looki

  3. Slide 3: Agenda

    01 Strategic Priorities & Growth Outlook (20 min.) 02 Business Updates (60 min.) ITC Holdings Corp. AGENDA UNS Energy FortisBC 03 Financial Update (20 min.) 04 Conclusion & Question Period (20 min.) 3

  4. Slide 4: Today's Speakers

    TODAY’S SPEAKERS David Hutchens Linda Apsey Susan Gray Roger Dall’Antonia Jocelyn Perry President & CEO President & CEO President & CEO President & CEO EVP, CFO Fortis Inc. ITC Holdings Corp. UNS Energy FortisBC Fortis Inc. 4

  5. Slide 5: Our Vision & Strategy

    OUR VISION & STRATEGY A Premium North American Utility Delivering a Cleaner Energy Future SUSTAINABLE GROWTH • Operational Excellence • Financial Strength • Diversified Regulated Portfolio • Local Business Model • Strong Governance 5

  6. Slide 6: Our Common Ground

    OUR COMMON GROUND PROVISION OF SAFE & RELIABLE SERVICE GOOD GOVERNANCE Priority #1 Fortis Ranked #1 in The Globe & Mail 2022 Board Games • Health and safety of our employees, customers and contractors • Utilities operate within the parameters of common policies and best practices • Doing whatever it

  7. Slide 7: Investor Day Highlights

    INVESTOR DAY HIGHLIGHTS $25B 6.3% 4-6% 2024-2028 5-Year Annual Dividend Capital Plan Rate Base Growth Guidance CAGR Extended through 2028 $2.7B increase over Transmission investments 50 years of consecutive 2023-2027 capital plan driving annual 7% rate increases in dividends paid base growth at ITC

  8. Slide 8: Transmission Driving Incremental Capital

    TRANSMISSION DRIVING INCREMENTAL CAPITAL +$0.4B $25.0B +$0.3B +$0.6B +$1.4B Other Regulated REGULATED GROWTH DRIVERS Utilities $22.3B ✓ Clean energy capital strengthened by Inflation Reduction Act (Direct & Indirect) ✓ System adaptation & resiliency +$2.7B Increase ✓ Customer growth & economic devel

  9. Slide 9: $25B Capital Plan at a Glance

    $25B CAPITAL PLAN AT A GLANCE 18% $6.8B 57% Major Capital Cleaner Energy Sustaining Projects Capital(1) Capital(2) (1) Cleaner energy investments defined as capital that supports reductions in air emissions, water usage and/or increases customer energy efficiency. (2) Capital expenditures required t

  10. Slide 10: Strong Rate Base Growth Across Regulated Utility Portfolio

    STRONG RATE BASE GROWTH ACROSS REGULATED UTILITY PORTFOLIO 5-Year Rate Base CAGR of 6.3%(1) Rate Base $49.4B ITC 7.0% FortisBC 6.5% $36.8B UNS Energy 6.0% Other Regulated 5.8% 2023F 2028F (1) 2023-2028 CAGR calculated based on a constant foreign exchange rate. 10

  11. Slide 11: Reducing Carbon Emissions

    REDUCING CARBON EMISSIONS Targets On Track Achieved 29% GHG Emissions Reduction Since 2019 2019 50% GHG Emissions Reduction Target 2022 Coal-Free Generation Mix 2030 2032 2035 Net-Zero Target (Scope 1) 75% GHG Emissions Reduction Target 2050 Actual GHG Emissions Reduction Forecast GHG Emissions Redu

  12. Slide 12: Building Climate Resiliency

    BUILDING CLIMATE RESILIENCY 2021 • Committed as a TCFD supporter • Identified risks and opportunities under four climate scenarios at five largest utilities It is no longer enough to design our systems based on historical weather, we 2022 • Inaugural TCFD and Climate Assessment are planning for futu

  13. Slide 13: Maintaining Customer Affordability

    MAINTAINING CUSTOMER AFFORDABILITY KEY AREAS OF FOCUS Managing Controllable Operating Costs Targeting controllable Focused on preventative operating costs in line with maintenance and historical levels innovation to reduce operating costs Helping customers manage Cleaner energy their energy costs in

  14. Slide 14: History in the Making

    HISTORY IN THE MAKING 4.4% 4-6% Announced Annual Dividend Q4 2023 Growth Guidance Dividend Increase Extended through 2028 73 75 77 79 81 83 85 87 89 91 93 95 97 99 01 03 05 07 09 11 13 15 17 19 21 23F 14

  15. Slide 15: ITC Business Update

    ITC BUSINESS UPDATE Linda Apsey

  16. Slide 16: ITC Overview

    ITC OVERVIEW 25,800 km $12.0 billion GREATER GRID Lines of transmission 2024F rate base GREENER FUTURE Assets in 8 U.S. States 22,971 MW Michigan and Iowa key states Peak demand ~700 Fortis owns 80.1% dedicated employees Interest in ITC FERC Rate Regulated 10.77-11.41% Allowed Cost-based, forward-lo

  17. Slide 17: ITC: Executing the Plan

    ITC: EXECUTING THE PLAN 2024-2028 Sources of Sustainable Growth Local Trends Macro Trends Key Initiatives • Execution of capital plan • Grid modernization and • ITC assets in ideal location • Managing interest rate risk reliability with rich wind resources • Customer value and and progressive RTOs •

  18. Slide 18: ITC: Capital Plan Supports 7% Rate Base Growth

    ITC: CAPITAL PLAN SUPPORTS 7% RATE BASE GROWTH Transmission investments supporting a safe, reliable energy grid and driving the transition to cleaner energy Capital Plan Rate Base $15.6B +$1.4B $11.3B $7.2B Capital Plan $5.8B 2024 - 2028 Capital Plan 2023 - 2027 2023F 2028F Infrastructure Investment

  19. Slide 19: ITC: Drivers of Transmission Growth

    ITC: DRIVERS OF TRANSMISSION GROWTH 2024-2028 $7.2B Capital Plan Drivers Reliability & MISO LRTP Renewable Economic Grid Modernization Tranche 1 Interconnections Development • Ensuring grid reliability, • Investing US$1.2B in • Interconnecting • Interconnecting new improving resilience, and Michigan

  20. Slide 20: ITC: Beyond the Plan Robust Capex Pipeline

    ITC: BEYOND THE PLAN ROBUST CAPEX PIPELINE Proven track record of capital execution and a long-term pipeline of transmission investment to benefit customers and the environment, while driving value for shareholders Economic Development & Customer Connections – new large load interconnections such as

  21. Slide 21: ITC: Focused on Customer Value & Affordability

    ITC: FOCUSED ON CUSTOMER VALUE & AFFORDABILITY Transmission Investment Provides Customer Affordability Customer Value is a Top Priority • Essential to providing a reliable and flexible energy grid • Disciplined cost management practices that meets public policy goals, facilitates economic developmen

  22. Slide 22: ITC: Favourable Transmission Landscape & Economic Environment

    ITC: FAVOURABLE TRANSMISSION LANDSCAPE & ECONOMIC ENVIRONMENT Transmission investment is critical in achieving multiple stakeholder objectives • Ensuring a reliable and a resilient electric grid is a national priority and is key to accomplishing public policy objectives • ITC’s footprint continues t

  23. Slide 23: UNS Energy Business Update

    UNS ENERGY BUSINESS UPDATE Susan Gray

  24. Slide 24: UNS Energy Overview

    BUILDING A SUSTAINABLE & UNS ENERGY OVERVIEW RELIABLE ENERGY FUTURE 23,500 km $7.6 billion of electric T&D lines 2024F rate base 5,100 km 2,949 MW of natural gas T&D lines Peak demand 712,000 ACC & FERC Regulated electric and gas customers Cost of service/historical test year & FERC formula transmis

  25. Slide 25: UNS Energy: Focused on Clean Energy Transition

    UNS ENERGY: FOCUSED ON CLEAN ENERGY TRANSITION 2024-2028 Sources of Sustainable Growth Local Trends Macro Trends Key Initiatives • Execution of capital plan • Clean energy transition • Historical customer growth • Managing inflation and supported by tax incentives and peak demand customer affordabil

  26. Slide 26: UNS Energy: Capital Plan & Rate Base Growth

    UNS ENERGY: CAPITAL PLAN & RATE BASE GROWTH Capital Plan Rate Base $9.5B +$600M $7.2B $5.2B Capital Plan $4.6B 2024-2028 Capital Plan 2023-2027 (1) 2023F 2028F Energy Resources Distribution Infrastructure Transmission Infrastructure IT, General & Other Maintenance Generation (1) 2023F rate base incl

  27. Slide 27: UNS Energy: Historical Customer Growth & Peak Demand Trends

    UNS ENERGY: HISTORICAL CUSTOMER GROWTH & PEAK DEMAND TRENDS Historical Customer Growth at TEP (%) Retail Peak Demand at TEP (MW) 1.3% 2,467 2,427 1.2% 1.2% 2,413 2,393 2,367 1.1% 2,273 0.9% 0.7% 2018 2019 2020 2021 2022 2023 2018 2019 2020 2021 2022 2023 27

  28. Slide 28: UNS Energy: Regional Economic Growth

    UNS ENERGY: REGIONAL ECONOMIC GROWTH Economic development focused on Top growth segments Examples of announced regional growth four main areas: 1. Business attraction • Mining American Battery Factory • Battery Manufacturing • 100 MW 2. Business expansion/key account • Transportation & Logistics Sou

  29. Slide 29: UNS Energy: TEP's Path to a Reliable & Affordable Energy Future

    UNS ENERGY: TEP’S PATH TO A RELIABLE & AFFORDABLE ENERGY FUTURE Exit from Coal On Track Coal-free Over 50 million tonnes generation of CO2 emissions mix by 2032 avoided over 15 years 2024-2028 Capital Plan 2017-2023 2024-2035 Assumes ~1,000 MW of owned generation 508 MW 903 MW Completed Coal Retirem

  30. Slide 30: UNS Energy: Tax Incentives Reduce Regulatory Lag & Benefit Customers

    UNS ENERGY: TAX INCENTIVES REDUCE REGULATORY LAG & BENEFIT CUSTOMERS Expected benefits at UNS ✓ Between rate cases, tax incentives are expected to reduce regulatory lag for eligible projects ✓ Tax credit monetization through lower taxes paid over the project life Investment Tax Credits: Available fo

  31. Slide 31: UNS Energy: Beyond the Capital Plan at TEP

    UNS ENERGY: BEYOND THE CAPITAL PLAN AT TEP Assessing Future Capacity Needs 2024-2035 Capacity Needs (MW) • New integrated resource plan expected to be filed in November 2023 Potential New IRP Capacity Needed Will look at all-source • Assessing capacity needs in 2028 and long-duration generation opti

  32. Slide 32: UNS Energy: Regulatory Backdrop Improving

    UNS ENERGY: REGULATORY BACKDROP IMPROVING Positive regulatory tone General Rate Case Outcome at TEP from the Arizona Corporation Commission ✓ Timely regulatory decisions ✓ Tracker mechanisms working as intended (i.e., purchased US$900M US$100M power fuel adjustor clause) Rate Base Increase Non-Fuel

  33. Slide 33: FortisBC Business Update

    FORTISBC BUSINESS UPDATE Roger Dall’Antonia

  34. Slide 34: FortisBC Overview

    FORTISBC OVERVIEW 51,200 km ~2,600 of natural gas T&D lines dedicated employees 7,300 km $7.6 billion of electric T&D lines 2024F rate base 1.1 million BCUC Regulated natural gas customers Cost of service with incentive mechanisms 188,000 electric customers 9.65% Allowed Gas 45% Electric 41% ENERGY

  35. Slide 35: FortisBC: Leading the Clean Energy Transformation

    FORTISBC: LEADING THE CLEAN ENERGY TRANSFORMATION 2024-2028 Sources of Local Trends Macro Trends Key Initiatives Sustainable Growth • Implementing the CleanBC • Managing inflation and • Execution of capital plan • Cleaner energy solutions Roadmap customer affordability • Advancing regulatory and • C

  36. Slide 36: FortisBC: Generic Cost of Capital Outcome

    FORTISBC: GENERIC COST OF CAPITAL OUTCOME BCUC decision received in September 2023 establishing cost of capital parameters for FortisBC effective January 1, 2023 Allowed Equity ROE Thickness FortisBC Energy 9.65% 45% (previously 8.75%) (previously 38.5%) FortisBC Electric 9.65% 41% (previously 9.15%

  37. Slide 37: FortisBC: Critical to the Energy Transition

    FORTISBC: CRITICAL TO THE ENERGY TRANSITION FortisBC systems play a critical role in delivering more energy than any other utility in British Columbia 33% ✓ Expanded conservation plans FortisBC delivers ✓ Renewable and low carbon energy offerings two-thirds of BC’s peak energy demand 33,000 MWh Peak

  38. Slide 38: FortisBC: Capital Plan & Rate Base Growth

    FORTISBC: CAPITAL PLAN & RATE BASE GROWTH Capital Plan Rate Base +$300M $10.4B $2.0 $4.9B $7.6B $1.7 Capital Plan $4.6B 2024-2028 $8.4 Capital Plan $5.9 2023-2027 2023F 2028F Reliability & Integrity LNG Projects FortisBC Energy FortisBC Electric Major Integrity Projects Renewable Gases 38

  39. Slide 39: FortisBC: Clean Energy Landscape

    FORTISBC: CLEAN ENERGY LANDSCAPE British Columbia FortisBC Clean Growth Policy Environment Pathway to 2050 • GHG reduction targets of 40% by 2030, 60% by 2040 and 80% by 2050 • Cap on gas utility customer emissions calls for a 47% reduction by 2030 • Greenhouse Gas Reduction Regulation allowing acqu

  40. Slide 40: FortisBC: Electrify City of Kelowna Case Study

    FORTISBC: ELECTRIFY CITY OF KELOWNA CASE STUDY Overview • FortisBC delivers gas to 40,000 customers and electricity to 66,000 customers in the City of Kelowna • FortisBC combined the City of Kelowna gas and electric consumption data into a single model to explore the inter-connectedness of the two e

  41. Slide 41: FortisBC: Beyond the Capital Plan

    FORTISBC: BEYOND THE CAPITAL PLAN Renewable Gas – Incremental investments enabled by the Greenhouse Gas Reduction Regulation. Near-Term Tilbury 1B Expansion – Potential for additional liquefaction capacity and supporting infrastructure to transport LNG to (1-5 years) ships at the Tilbury LNG site. R

  42. Slide 42: Financial Update

    FINANCIAL UPDATE Jocelyn Perry

  43. Slide 43: Financial Objectives

    FINANCIAL OBJECTIVES 1. 2. 3. 4. Execute Regulated Balanced Maintain Deliver 4 – 6% Growth Strategy Funding Plan Investment-Grade Annual Dividend Credit Ratings Growth 43

  44. Slide 44: Strong Track Record of Delivering & Outperforming Capital Plans

    STRONG TRACK RECORD OF DELIVERING & OUTPERFORMING CAPITAL PLANS 2019-2023 Capital ACTUAL CAPITAL EXPENDITURES ~17% HIGHER THAN PROJECTED FIVE YEARS AGO +$2.9B • Execution of historical capital plans despite pandemic and supply chain disruptions • $20.2B Clean energy transition augmenting incremental

  45. Slide 45: Executing Our Regulated Growth Strategy

    EXECUTING OUR REGULATED GROWTH STRATEGY 5-Year Rate Base CAGR(1) 6.8% $26.1B in 2018 compared to $36.8B for 2023F 5-YEAR LOOK BACK AT KEY ACCOMPLISHMENTS Annual Dividend Growth Guidance Range 4 - 6% Supporting funding flexibility Balance Sheet Strengthened Asset Sales of Waneta and Aitken Creek(2) a

  46. Slide 46: Incremental Capital Concentrated in Outer Years

    INCREMENTAL CAPITAL CONCENTRATED IN OUTER YEARS $2.7B OF INCREMENTAL CAPITAL IN 2024-2028 VS. 2023-2027 $5.7B $4.8B $5.0B $0.9 $5.0B $4.3B $4.5B $0.2 $0.5 $0.4 $4.6 $4.5 $4.8 $4.1 (1) 2023F 2024F 2025F 2026F 2027F 2028F 2023-2027 Five-Year Plan Incremental Capital (1) 2023 reflects a USD:CAD foreign

  47. Slide 47: Balanced Approach to Funding Growth

    BALANCED APPROACH TO FUNDING GROWTH Equity from DRIP Supplemented 4-6% Annual Dividend Growth by ATM Program Guidance Range Cash From Operations(1) • Annual proceeds from DRIP of ~$400M • Flexibility to fund more capital with internally $25B 55% Net Debt(2) 34% generated funds • $500M ATM program to

  48. Slide 48: Investment-Grade Credit Ratings

    INVESTMENT-GRADE CREDIT RATINGS Moody’s CFO/Debt(1) S&P FFO/Debt(1) CREDIT METRICS 11.7% ~12.0% ~12.0% Forecast metrics inclusive 11.4% 11.0% 11.0% of expected Alternative 11.0% Minimum Tax (AMT) and 10.5% recent regulatory decisions 2022A 2023F 2024-2028 2022A 2023F 2024-2028 Average Average Rating

  49. Slide 49: Debt Maturities & Preference Share Dividends

    DEBT MATURITIES & PREFERENCE SHARE DIVIDENDS Preference Share Dividend Rate Resets Debt Maturities Remain Attractive • 33% holdco debt/ total debt(1) • Interest costs at regulated utilities recovered through customer rates • Limited non-regulated maturities through the end of 2025 2024 • ITC Holding

  50. Slide 50: Regulatory Outlook

    REGULATORY OUTLOOK 2023 2024 General Rate Generic Cost of Capital Third Performance Based General Rate Application Proceeding Rates Term Application • New rates effective Sep. 1, 2023 • Decision retroactive to Jan. 1, 2023 • Decision expected in H2 2023 • Application filed seeking new rates effectiv

  51. Slide 51: Regulatory Compact

    REGULATORY COMPACT Weighted Average Allowed ROE Weighted Average Equity Thickness 9.8% 50.9% 9.7% 250 basis points increase in 48.4% our consolidated regulated equity thickness driven by TEP and FortisBC Energy 2018 Current 2018 Current Note: Weighted average based on 2023 forecast rate base and cap

  52. Slide 52: Growing Responsibly: Five-Year Plan Highlights

    GROWING RESPONSIBLY: FIVE-YEAR PLAN HIGHLIGHTS $25B 6.3% 4-6% Balanced Funding 2024-2028 5-Year Annual Dividend Plan Capital Plan Rate Base CAGR Growth Guidance Supportive of through 2028 Investment-Grade Credit Ratings $2.7B increase Rate base increases 50 years of Credit metrics over 2023-2027 $12

  53. Slide 53: Why Invest in Fortis?

    SUSTAINABLE GROWTH Focused on Executing Robust Transmission Transparent Strong Investment Pipeline Funding Plan Rate Base Growth Cleaner 4-6% Annual Investment-Grade Energy Transition Dividend Growth Credit Ratings WHY INVEST IN FORTIS? LOW-RISK Safe, Well-Run Utilities Regulatory & Constructive Str

  54. Slide 54: Appendix

    APPENDIX FORTIS..

  55. Slide 55: Table of Contents

    TABLE OF CONTENTS ITC Holdings Corp. 56 – 57 UNS Energy 58 – 59 Central Hudson 60 – 61 FortisBC 62 – 64 FortisAlberta 65 – 66 Other Electric 67 – 68 2023-2028 Rate Base by Business Unit 69 2024-2028 Capital Plan by Business Unit 70 Cleaner Energy Capital 71 Major Capital Projects 72 Strong Investmen

  56. Slide 56: ITC Overview

    ITC OVERVIEW FERC regulated electric transmission utility 25,800 km $12.0 billion GREATER GRID Lines of transmission 2024F rate base GREENER FUTURE Assets in 8 U.S. States 22,971 MW Michigan and Iowa key states Peak demand ~700 Fortis owns 80.1% dedicated employees Interest in ITC FERC Rate Regulate

  57. Slide 57: ITC Capital Investment Overview

    ITC CAPITAL INVESTMENT OVERVIEW $3.9B Infrastructure Investments Grid Security Rebuild, reliability, resiliency, system efficiencies, increased capacity, circuit overloads, pocket load growth MISO LRTP $1.5B MISO Long-Range Transmission Plan Includes portion of investments for Tranche 1 $7.2B Infras

  58. Slide 58: UNS Energy Overview

    UNS ENERGY OVERVIEW BUILDING A SUSTAINABLE & Vertically integrated electric and gas utility RELIABLE ENERGY FUTURE 23,500 km $7.6 billion of electric T&D lines 2024F rate base 5,100 km 2,949 MW of natural gas T&D lines Peak demand 712,000 ACC & FERC Regulated electric and gas customers Cost of servi

  59. Slide 59: UNS Energy Capital Investment Overview

    UNS ENERGY CAPITAL INVESTMENT OVERVIEW Generation $2.0B Energy Resources Maintenance Expected energy storage, renewables and other IT, General & investments associated with exit from coal Other $1.4B Distribution Infrastructure Grid resiliency and modernization Transmission Infrastructure $5.2B Ener

  60. Slide 60: Central Hudson Overview

    CENTRAL HUDSON OVERVIEW Electric and gas T&D utility TOGETHER WE 15,100 km of electric T&D lines ~1,100 dedicated employees POWER ENDLESS POSSIBILITIES 2,400 km $3.1 billion of natural gas T&D lines 2024F rate base 300,000 New York Public Service electric customers Commission Regulated Cost of servi

  61. Slide 61: Central Hudson Capital Investment Overview

    CENTRAL HUDSON CAPITAL INVESTMENT OVERVIEW Transmission Infrastructure $1.3B Distribution Infrastructure Distribution automation and modernization $2.2B Distribution $600M IT, General & Other Building the Workforce of the Future Capital Plan(1) Infrastructure 2024-2028 $300M Transmission Infrastruct

  62. Slide 62: FortisBC Overview

    FORTISBC OVERVIEW Gas LDC and integrated electric utility 51,200 km ~2,600 of natural gas T&D lines dedicated employees 7,300 km $7.6 billion of electric T&D lines 2024F rate base 1.1 million BCUC Regulated natural gas customers Cost of service with incentive mechanisms 188,000 electric customers 9.

  63. Slide 63: FortisBC Capital Investment Overview

    FORTISBC CAPITAL INVESTMENT OVERVIEW Renewable Gases Major Integrity $2.6B Reliability & Integrity Investments Projects Ongoing maintenance requires significant capital investment Includes customer growth and general plant investment $4.9B LNG $1.4B LNG Projects Tilbury 1B Reliability Tilbury LNG St

  64. Slide 64: FortisBC: Major Capital Projects

    FORTISBC: MAJOR CAPITAL PROJECTS 2024- Estimated Tilbury LNG Storage Expansion – Project aims to increase on-system storage for immediate backup 2028F Completion gas supply to customers in the Lower Mainland area of British Columbia. In March 2023, the BCUC issued an adjournment decision on the proj

  65. Slide 65: FortisAlberta Overview

    FORTISALBERTA Electric distribution utility OVERVIEW 90,200 km $4.4 billion distribution lines 2024F rate base ~85% 584,000 of revenue derived from customers fixed-billing determinants AUC Regulated 2,767 MW Performance-based rate Peak demand (PBR) setting 8.50% 37% ~1,100 dedicated employees Allowe

  66. Slide 66: FortisAlberta Capital Investment Overview

    FORTISALBERTA CAPITAL INVESTMENT OVERVIEW IT, General $2.5B Distribution Infrastructure & Other Safety and reliability of distribution assets, meter upgrades, pole management program, modernization $3.1B $600M IT, General & Other Capital Plan 2024-2028 Distribution Infrastructure 66

  67. Slide 67: Other Electric Overview

    OTHER ELECTRIC OVERVIEW Electric T&D utilities 23,110 km Five of electric T&D lines regulated electric utilities(1) 480,000 Equity investments DELIVERING A CLEAN customers Wataynikaneyap Partnership & Belize Electricity ~1,500 dedicated employees Three North American countries ENERGY FUTURE $3.7 bil

  68. Slide 68: Other Electric Capital Investment Overview

    OTHER ELECTRIC CAPITAL INVESTMENT OVERVIEW IT, General & Other $900M Distribution Infrastructure Transmission $900M Generation Diversification $2.5B Infrastructure Capital Plan(1) Distribution $400M Transmission Infrastructure Infrastructure 2024-2028 $300M IT, General & Other Generation Diversifica

  69. Slide 69: 2023-2028 Rate Base by Business Unit

    2023-2028 RATE BASE BY BUSINESS UNIT Rate Base 5-YEAR CAGR to ($BILLIONS, EXCEPT FOR CAGR) 2023F 2024F 2025F 2026F 2027F 2028F 2028 Regulated – Independent Electric Transmission ITC(1) 11.3 12.0 12.7 13.4 14.4 15.6 7.0% Regulated – U.S. Electric & Gas UNS Energy 7.2 7.6 8.1 8.5 9.0 9.5 6.0% Central

  70. Slide 70: 2024-2028 Capital Plan by Business Unit

    2024-2028 CAPITAL PLAN BY BUSINESS UNIT Capital Plan(1) 2024-2028 ($MILLIONS) 2024F 2025F 2026F 2027F 2028F TOTAL Regulated – Independent Electric Transmission ITC 1,252 1,474 1,449 1,477 1,537 7,189 Regulated – U.S. Electric & Gas UNS Energy 1,111 854 912 1,310 973 5,160 Central Hudson 408 421 437

  71. Slide 71: Capital Plan Supports Cleaner Energy Future

    CAPITAL PLAN SUPPORTS CLEANER ENERGY FUTURE ~$1B Increase in Cleaner Energy Investments Delivering Renewables to the Grid $3.4B • ITC MISO LRTP and wind / solar interconnections $25B • T&D investments associated with New York’s Climate Leadership and Community Protection Act Capital Plan Renewable E

  72. Slide 72: Major Capital Projects

    MAJOR CAPITAL PROJECTS Major Capital 2024- Estimated Projects ($ Millions) 2023F 2028F Completion Date 18% ITC MISO LRTP(1) 16 1,486 Post-2028 UNS Energy Vail-to-Tortolita Transmission Project 101 273 2026 $25B UNS Energy Renewable Generation(2) - 417 2027 UNS Energy Battery Storage(3) 137 345 2025

  73. Slide 73: Strong Investment-Grade Credit Ratings

    STRONG INVESTMENT-GRADE CREDIT RATINGS COMPANY Fortis Inc. A-(1) Baa3 A (low) ITC Holdings Corp. A-(1) Baa2 n/a ITC Regulated Subsidiaries A A1 n/a TEP A- A3 n/a Central Hudson BBB+ Baa1 n/a FortisBC Energy n/a A3 A FortisBC Electric n/a Baa1 A (low) FortisAlberta A- Baa1 A (low) Newfoundland Power

  74. Slide 74: Other Sensitivity Exposure

    OTHER SENSITIVITY EXPOSURE Foreign Exchange ROE & Equity Ratio • USD:CAD FX Rate of 1.30 for 2024-2028 ROE Equity +/- 25 bps +/- 100 bps • 65% of operating earnings(1) / 60% of capital ITC $0.03 $0.03 plan in USD at U.S. & Caribbean utilities UNS Energy $0.02 $0.01 • +/- $0.05 change in USD:CAD – EP

  75. Slide 75: Ongoing Regulatory Proceedings

    ONGOING REGULATORY PROCEEDINGS ITC Midwest Capital Structure Complaint – In 2022, FERC denied the complaint filed by the Iowa Coalition for Affordable Transmission (ICAT) seeking to lower ITC Midwest’s equity ratio from 60% to 53%; ICAT’s request for rehearing was denied by FERC in March 2023 MISO B

  76. Slide 76: Ongoing Regulatory Proceedings (Continued)

    ONGOING REGULATORY PROCEEDINGS (CONTINUED) Customer Information System (CIS) Implementation – In January 2023, Central Hudson filed a response to the PSC’s show cause order in respect of its new CIS; interim agreement reached with the PSC in July 2023 including independent third-party verification o

  77. Slide 77: Strong Leadership Team

    STRONG LEADERSHIP TEAM Fortis Inc. Executive David Hutchens Jocelyn Perry Jim Reid Gary Smith Stuart Lochray President & CEO EVP, CFO EVP, Sustainability & CLO EVP, Operations & Innovation Sr. VP Capital Markets & Business Development Utility Linda Apsey Chris Capone Roger Dall’Antonia Ruth Forbes S

  78. Slide 78: ESG Leadership

    ESG LEADERSHIP Environmental Social • 2050 net-zero direct emissions goal, with interim targets to reduce • Building on our strong record of mutually beneficial GHG emissions 50% by 2030 and 75% by 2035 partnerships with Indigenous peoples • Progress: More than halfway to achieving our 50% by 2030 t

  79. Slide 79: Ensuring Safe & Reliable Service

    ENSURING SAFE & RELIABLE SERVICE SAFE OPERATIONS RELIABLE SERVICE All-Injury Average Electricity Customer Frequency Rate(1) Outage Duration (Hours)(3) 1.73 1.60 3.8 3.8 3.5 3.3 2.3 2.1 1.8 1.9 2.0 2018 2019 2020 2021 2022 2018 2019 2020 2021 2022 USA Bureau of Labor Statistics Fortis Fortis Electric

  80. Slide 80: Upcoming Events

    UPCOMING EVENTS Expected Earnings Release Dates Other Investor Events • Wolfe Utilities, Midstream & Clean Energy Conference – • Q3 2023 – October 27, 2023 September 28, 2023 • Q4 2023 – February 9, 2024 • EEI Financial Conference – November 12-14, 2023 • Wells Fargo 22nd Annual Midstream & Utilitie

  81. Slide 81: Glossary

    GLOSSARY ACC: Arizona Corporation Commission JEMS: Jobsite Energy Management System Aitken Creek: Aitken Creek Gas Storage ULC, a direct 93.8%-owned subsidiary of FortisBC Holdings Inc. km: kilometre AMI: Advanced Metering Infrastructure AMT: Alternative Minimum Tax LNG: liquefied natural gas ATM: A

Fortis — Investor Day (September 2023) on 6ix