Archer Aviation Inc. · NYSE:ACHR

Archer Aviation — Investor Presentation (December 2024)

22 slides from Archer Aviation's investor presentation, Dec 12, 2024

  1. Slide 1: Investor Presentation December 2024

    INVESTOR PRESENTATION DECEMBER 2024 CONFIDENTIAL

  2. Slide 2: Forward-looking statements and confidentiality notice

    2 This confidential presentation (this "Presentation") contains certain information pertaining to Archer Aviation Inc. (collectively with its subsidiaries, the "Company"). This Presentation is being provided solely to assist the recipient in determining whether it wishes to proceed with conducting i

  3. Slide 3: Industry data and confidentiality notice

    3 This Presentation may also contain estimates and other statistical data made by independent parties and by the Company relating to market size and growth and other industry data. Such data involves a number of assumptions and limitations, and you are cautioned not to give undue weight to such esti

  4. Slide 4: Risk factors

    4 The risks presented below are certain of the general risks related to the Company’s business, industry and ownership structure and are not exhaustive. The list below is qualified in its entirety by disclosure contained in the Company’s Annual Report and other filings with the SEC. These risks spea

  5. Slide 5: Introducing Archer Defense

    CONFIDENTIAL 5 INTRODUCING ARCHER DEFENSE INVESTOR PRESENTATION

  6. Slide 6: Building the future of military vertical lift

    CONFIDENTIAL RAPID AIRCRAFT DEVELOPMENT CAPABILITIES PROPRIETARY POWERTRAIN ADVANCED FLIGHT CONTROL SYSTEMS DOD CUSTOMER PROGRAMS MISSION CONTROL SYSTEMS LATTICE AI PLATFORM 6 BUILDING THE FUTURE OF MILITARY VERTICAL LIFT + WORLD-CLASS AEROSPACE TALENT GLOBAL DEPLOYMENTS SCALABLE MANUFACTURING DUAL-

  7. Slide 7: Archer Defense platform

    3 1RAPID DEVELOPMENT 2 7 TOP TALENT BASE ARCHER DEFENSE PLATFORM 4CAPACITY TO MANUFACTURE Proven ability to quickly design, build, and test next gen aircraft within ~18 months Access to leading Silicon Valley talent from Tesla, SpaceX, Google, Uber, Apple, etc. LEADING INNOVATION IN POWERTRAIN Devel

  8. Slide 8: Experienced next gen aerospace team

    CONFIDENTIAL TOM MUNIZ CTO GEOFF BOWER CHIEF ENGINEER JEFF GREENWOOD CHIEF PILOT STEVE SPITERI VP, SOFTWARE ALEX CLARABUT VP, POWERTRAIN PAUL FRIHAUF DIRECTOR, BMS & BATTERY CONTROLS CONFIDENTIAL EXPERIENCED NEXT GEN AEROSPACE TEAM JOSEPH PANTALONE HEAD OF ADVANCED PROJECTS 29 years Sikorsky Directo

  9. Slide 9: World-class Archer Defense government advisory board

    CONFIDENTIAL WORLD-CLASS ARCHER DEFENSE GOVERNMENT ADVISORY BOARD 9 DIRECTOR (R) GEOFF DOWNER LT GENERAL (R) DAVID A. KRUMM MAJOR GENERAL (R) HUTMACHER MAJOR GENERAL (R) BILL GAYLER CW4 (R) MICHAEL J.DURANT GENERAL (R) STEVE TOWNSEND

  10. Slide 10: Midnight-like VTOL aircraft with hybrid propulsion

    MIDNIGHT-LIKE VTOL AIRCRAFT HYBRID PROPULSION, + LOW THERMAL AND ACOUSTIC SIGNATURE NEXT GEN AEROSPACE DEFENSE PLATFORM FIRST PRODUCT TARGETING ANTICIPATED DEFENSE PROGRAM OF RECORD LEVERAGE FIRST PROGRAM TO JOINTLY DEVELOP SUITE OF NEXT-GEN AEROSPACE DEFENSE FOCUSED PRODUCTS = CONFIDENTIAL 10

  11. Slide 11: Goal of the capital raise and use of proceeds

    CONFIDENTIAL 1111 THE GOAL OF THE CAPITAL RAISE IS TO REINFORCE ARCHER’S STRONG BALANCE SHEET AND HELP ENABLE IT TO SEIZE STRATEGIC OPPORTUNITIES, SUCH AS THE DEVELOPMENT OF CRITICAL NEXT-GENERATION MILITARY AEROSPACE TECHNOLOGY *The pro forma cash figure does not include previously disclosed additi

  12. Slide 12: Appendix: Background on Archer

    12 APPENDIX Background on Archer INVESTOR PRESENTATION CONFIDENTIAL

  13. Slide 13: Company overview

    Raised ~$1.5B to Date ~900 Person Workforce ~2/3 WORKFORCE ENGINEERING & CERTIFICATION. HEADQUARTERS IN SAN JOSE, CA World-Class Operating Partners INCLUDING UNITED AIRLINES, SOUTHWEST, INTERGLOBE AND MORE FOUNDED IN 2018, LISTED ON NEW YORK STOCK EXCHANGE IN 2021 2025 Commercial Launch Target PLANN

  14. Slide 14: Management team

    CONFIDENTIAL CONFIDENTIAL 14 JOSEPH PANTALONE HEAD OF ADVANCED PROJECTS 29 years Sikorsky Director Special Programs Adam Goldstein FOUNDER, CEO Previously Founder at Vettery Geoff Bower CHIEF ENGINEER Previously Chief Engineer at Airbus Vahana Tom Muniz CHIEF TECHNOLOGY OFFICER Previously VP of Engi

  15. Slide 15: Consumer aircraft target specifications: Midnight

    CONFIDENTIAL 4 PASSENGERS + 1 PILOT PAYLOAD TARGETING ~1,000 LBS 150 MPH / 240 KMH MAXIMUM SPEED UP TO 100 MI / 150 KM MAXIMUM RANGE Company aircraft performance targets for Midnight aircraft. CONFIDENTIAL 15 ARCHER’S CONSUMER AIRCRAFT’S TARGET SPECIFICATIONS 15 MIDNIGHT

  16. Slide 16: World-class powertrain team and proprietary technology

    CONFIDENTIAL 1616 HIGH SPECIFIC POWER AND ENERGY DENSITY >1500 horsepower capability over entire flight envelope LONG-LASTING Battery packs are designed to last ~10,000 flight cycles before needing to be swapped SAFE Thermal runaway tolerant, propagation preventing EXPERIENCED TEAM 100+ person team

  17. Slide 17: Powertrain facility in San Jose, California

    CONFIDENTIAL 17 POWERTRAIN FACILITY IN SAN JOSE, CALIFORNIA – Archer’s “automotive style” battery line is designed for high-volume production, including being able to easily scale up to support production of up to 15,000 battery packs per year – Automation utilized strategically in key areas of manu

  18. Slide 18: Electric engine

    CONFIDENTIAL 18 ELECTRIC ENGINE Archer's electric engines are being designed, manufactured, and tested in its CA based facilities by leading subject matter experts from across the aerospace and EV industries Archer’s powertrain design and manufacturing processes are purpose-built to support high-vol

  19. Slide 19: High-volume manufacturing facility in Georgia

    CONFIDENTIAL SCALABLE MANUFACTURING SCALABLE FOOTPRINT Facility is on a ~100 acre site adjacent to the Covington Municipal Airport in Georgia with separate aircraft production and flight test buildings measuring ~350,000 sq. ft. in total and capable of being expanded by an additional 550,000 square

  20. Slide 20: Test flights in 2024

    CONFIDENTIAL OVER 400 TEST FLIGHTS IN 2024 TILT-ROTOR ANGLE SPEED MPH 103.01 20 90° CONFIDENTIAL AND PROPRIETARY CONFIDENTIAL

  21. Slide 21: FAA final rules for operating eVTOL aircraft

    CONFIDENTIAL Archer Defense INVESTOR PRESENTATION 21 “This is a seminal moment for the FAA and the U.S. This is the first time in 80 years that the FAA has created a new category for aircraft and did that in record time — about 18 months when it usually takes five to seven years” BILLY NOLEN ARCHER’

  22. Slide 22: Commercial operations plan: domestic and international

    In the U.S., Archer intends to operate aircraft as part of our wholly-owned Part 135 airline Archer also plans to sell aircraft to operating partners in the U.S., e.g., United, and operate them on their behalf United is expected to be the first of these partners and Archer anticipates United will su

Archer Aviation — Investor Presentation (December 2024) on 6ix