  1. Slide 1: EPNG / Mojave / Sierrita 2017-18 Winter Preparedness

    KINDERJMORGAN EPNG / Mojave/ Sierrita 2017-18 Winter Preparedness Kinder Morgan Western Region Pipelines October 26, 2017

  2. Slide 2: Agenda

    Operations Overview Emergency Communication Winter Preparedness Planning Maintenance Planning Process Remaining 2017 Planning Maintenance Gas Control Contacts 2

  3. Slide 3: Operations Overview

    Operations Overview 3

  4. Slide 4: System map: supply areas, pipelines and compressor stations

    Rockies Gas San Juan Basin Supply Rockies Gas Rockies Gas ARIZONA NEW MEXICO Albuquerque TEXAS CALIFORNIA Phoenix Washington Ranch Storage Permian Basin Supply Tucson El Paso Waha Production Areas Gas Supplies Transport Flow Directions Compressor Stations Pipelines 4

  5. Slide 5: EPNG Total System Throughput Trends

    EPNG Total System 2012-2017 Throughput Trends (MMcf/d) EPNG Total Throughput 4,500 4,000 3,500 3,000 Daily Average Flow [MMcf] 2,500 2,000 1Jan 1-Feb 1-Mar 1-Apr 1-May dun 1Jul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec mmm 2012-2016 —=—=2015 —=—=2016 <mmme2017

  6. Slide 6: San Juan Basin Throughput Trends

    San Juan Basin 2012-2017 Throughput Trends (MMcf/d) EPNG San Juan Basin Receipts 2,500 2,000 1,500 1,000 Daily Average Flow (MMcf) 500 tan 1Feb — 1-Mar 1-Apr 1-May 1-Jun 14ul 1-Aug 1-Sep 1-Oct 1-Nov Dec mmm 2012-2016 —=—=2015 ———=2016 mm2017

  7. Slide 7: North Mainline Throughput Trends

    North Mainline 2012-2017 Throughput Trends (MMcf/d) North Mainline 2,500 2,000 1,500 1,000 Daily Average Flow [MMcf] 500 1Jan 1-Feb 1-Mar 1-Apr 1-May dun 1-Jul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec mmm 2012-2016 —=—=2015 —=—=2016 <mmme2017

  8. Slide 8: Permian Basin Throughput Trends

    Permian Basin 2012-2017 Throughput Trends (MMcf/d) EPNG Permian Basin Receipts 3,000 2,500 2,000 1,500 1,000 Daily Average Flow (MMcf) 500 ddan Feb 1-Mar L-Apr 1-May Jun ul 1-Aug 1-Sep 1L-Oct 1-Nov 1-Dec mmm 2012-2016 ==—=2015 ==—=2016 —mm2017

  9. Slide 9: South Mainline Throughput Trends

    South Mainline 2012-2017 Throughput Trends (MIMIcf/d) South Mainline 2,500 2,000 1,500 1,000 Daily Average Flow [MMcf] ian 1feb — 1-Mar 1Apr1-May tun ul 1Aug 1Sep 1-0ct 1Nov —1-Dec mmm 2012-2016 —=—=2015 —=—=2016 <mmme2017

  10. Slide 10: Condition Type (Number of Days)

    Condition Type (Number of Days) Warnings SOC COC DRAFT PACK DRAFT PACK DRAFT PACK 2013 14 7 1 1 1 0 2014 15 15 9 0 0 0 2015 9 19 2 3 3 0 2016 12 10 7 2 0 0 2017(YTD) 12 0 5 0 0 0 *System Wide Strained Operating Condition (SOC) / Critical Operating Conditions (COC) 10

  11. Slide 11: Shipper and Stakeholder Mass Communication

    Shipper and Stakeholder Mass Communication EBB Notices Text messages Emails to shipper-maintained group email addresses Telephone message sent by EPNG to emergency contacts System Status Hotline (1-855-762-0100) parties can call for a recorded status of the system (updated as needed throughout an ev

  12. Slide 12: Staffing and Local Facility Preparation

    Staffing Gas Control is 24 x 7 x 365. Field technicians are on-site or on-call. Local Facility preparation (Begin about November 1st) Vehicle inspections – prepare vehicles for cold weather. Two-Way Radio functional tests Facility inspections with focus on weatherproofing. Heat tracing, heat lamps,

  13. Slide 13: Communication and Coordination; Operational Response

    Communication and Coordination Customer Winter Preparedness Meeting (WebEx/conference call) – October 26, 2017. Customer-specific winter preparedness meetings or communications. Monitor Weather Forecast. Conference Calls between Gas Control and Operations to discuss preparations. Shipper and Stakeho

  14. Slide 14: Maintenance Planning Process and Communication

    Maintenance Planning Process and Communication 14

  15. Slide 15: Annual Maintenance Planning Process

    Annual Maintenance Planning Process July/August – Process Begins Review of annually recurring maintenance Development of Pipeline Integrity project list for the next year. Development of additional O&M and project related maintenance outages for the next year. October Gas Control preliminary review.

  16. Slide 16: Communication to Customers

    Communication to Customers Annual Maintenance Plan December 15 - Annual Plan for 1st Quarter posted to EBB. Mid-March - Annual Plan updated for the remainder of the year posted to the EBB. Updated as required throughout the year. Monthly Maintenance Monthly schedule posted 9 business days before the

  17. Slide 17: Planned Maintenance Nov 2017 – Dec 2017

    Planned Maintenance Nov 2017 – Dec 2017 Maximum potential impact on pipeline capacity > 50 MMcf/d 17

  18. Slide 18: Planned maintenance schedule and capacity impact

    San Juan Basin 4 3 8 6 Washington 1 Permian Basin Ranch 5 7 2 Item Date Location Short Description Reduction Waha 1 11/6–11/13 PLAINS PL Pipeline Remediation 159 2 12/5-12/8 WINK Turbine Inspection 104 3 12/5 NML L1208 ILI Inspection 122 4 12/12–12/14 HACKBERRY STA Turbine Repair 71 5 11/13-11/17 DE

  19. Slide 19: Gas Control Contacts

    Gas Control Contacts 19

  20. Slide 20: Gas Control Contacts

    Russ Pyeatt - Manager (719) 520-3729 (office) (505) 320-4556 (cell) russ_pyeatt@kindermorgan.com Dan English - Lead Controller (719) 520-4722 (office) (719) 659-3210 (cell) dan_english@kindermorgan.com Vic Villalva - Maintenance Planner (719) 520-4251 (office) (719) 482-6914 (cell) vic_villalva@kind