Slide 1: Antipa Exploration Update – Minyari Phase 1 Drilling Programme
For personal use only Antipa Exploration Update Minyari Phase 1 Drilling Programme May 2016
Slide 2: Disclaimer and Important Information
Disclaimer and Important Information Forward-Looking Statements • This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning For personal use only Antipa Mineral Ltd’s planned exploration programme and other statements that
Slide 3: Company Overview
Company Overview Objective To become a new Australian gold-copper producer emphasising safety and cost control whilst utilising cutting edge techniques of exploration, development and production For personal use only Current Position • Minyari/WACA provides shorter term exploration and development o
Slide 4: Commanding Paterson Province Land Holding
Commanding Paterson Province Land Holding For personal use only Antipa Minerals - Presentation May 2016 4
Slide 5: High-Grade Opportunity
Minyari Dome – High-Grade Opportunity • 100% owned Minyari and WACA tenements host significant high-grade gold (with copper) oxide and primary mineralisation deposits For personal use only • Minyari Dome and Minyari Deposit interpreted to be a direct Telfer analogue • Mineralisation close to surface
Slide 6: High-Grade Opportunity – Intersection highlights
Minyari Dome – High-Grade Opportunity Intersection highlights from prior drilling include: • 38.0m at 4.47 g/t gold and 0.05% copper from 88.0m downhole (MHC086-3; 100650 North; DDH) For personal use only • 35.5m at 3.16 g/t gold and 0.56% copper from 9.0m downhole (MHR065-7; 100650 North; RC Drillh
Slide 7: High-Grade Opportunity – Oxide mineralisation costean
Minyari Dome – High-Grade Opportunity For personal use only Minyari Deposit oxide gold mineralisation under less than 1 metre of cover exposed within a 220m long costean constructed by Newmont in 1987 for the collection of two bulk samples across drill section 100,675 North (Local Grid): Sample resu
Slide 8: Minyari Deposit – Phase 1 Strategy and Objectives
Minyari Deposit – Phase 1 Strategy and Objectives Evaluate Minyari as a possible near term production opportunity including: • Phased exploration programme to: For personal use only • Extend Minyari oxide mineralisation; • Extend Minyari primary mineralisation; • Identify additional regions of high
Slide 9: Minyari Deposit – Phase 1 Programme Metrics
Minyari Deposit – Phase 1 Programme Metrics 2016 Phase 1 Minyari exploration programme: For personal use only • RC Drilling Programme: • Between 60 to 70 drillholes depth 60 to 270m; • Up to 10,000 metres; 900m • Main area of investigation on 50m north-south sections and nominally 50m on section; •
Slide 10: High-Grade Opportunity
Minyari Dome – High-Grade Opportunity For personal use only 200m Antipa Minerals - Presentation May 2016 10 10
Slide 11: High-Grade Opportunity – IP anomalies
Minyari Dome – High-Grade Opportunity • 2008 Newcrest IP survey results show strong correlation with known Minyari and WACA For personal use only mineralisation • Untested additional (including broader/stronger) IP 900m Chargeability anomalies located north and south of the known Minyari mineralisat
Slide 12: Just the Beginning
Minyari Dome – Just the Beginning • 2008 Newcrest IP survey results show strong correlation with known Minyari and WACA For personal use only mineralisation • Multiple untested additional (stronger) IP Chargeability anomalies within the broader Minyari Dome • Extremely limited and widespread deeper
Slide 13: Citadel Project - IP Programme Objectives & Metrics
Citadel Project - IP Programme Objectives & Metrics • Extensive Induced Polarisation (IP) electrical geophysical survey commenced 24th March • IP survey to cover up to 16 target areas within 7 survey areas covering 400km2 of the Citadel For personal use only Project • IP survey ongoing and results e
Slide 14: Paterson and Telfer Dome Projects – Prime Real Estate
Paterson and Telfer Dome Projects – Prime Real Estate • Two Projects covering 1,711 km2 of highly prospective ground across 70 km north to south: For personal use only • Paterson Project = 1,573 km2 (granted) • Telfer Dome Project = 138 km2 (58 km2 granted) 70km • Tenements to within 5 km of the Tel
Slide 15: Corporate Overview
Corporate Overview Capital Structure (3 May 2016) Background & Milestones Listed on ASX 19 April 2011 following successful completion of Ordinary Shares 785.6 million A$10 million IPO For personal use only Listed Options: 1 cent options Citadel Project acquired from Centaurus Metals for IPO 117.2 mi
Slide 16: Board and Management
Board and Management Stephen Power, LLB • Commercial lawyer with 30 years experience advising participants in the resources industry Executive Chairman in Australia and overseas including Africa and South America. Previously a Non-Executive director of Karoon Gas Australia Ltd. For personal use only
Slide 17: Notes
For personal use only NOTES
Slide 18: Notes – Competent Persons Statement
Notes Competent Persons Statement – Exploration Results The information in this report that relates to the Exploration Results is extracted from the following: • Reports entitled various relating to Magnum, Corker and Calibre created between 7 September 2011 and the 9 September 2014, including; For
Slide 19: Antipa’s Paterson Province Land Holding - Location
Antipa’s Paterson Province Land Holding - Location For personal use only Antipa Minerals - Presentation May 2016 19
Slide 20: Paterson Super Project – Overview
Paterson Super Project – Overview • Three large Projects covering 4,356 km2 across 160 km north to south: For personal use only • Citadel Project = 1,335 km2 • North Telfer Project = 1,310 km2 • Paterson & Telfer Dome Projects = 1,711 km2 • Project areas have all the key elements for hosting major g
Slide 21: Significant Exploration Upside
Minyari Dome – Significant Exploration Upside • Minyari deposit and Minyari Dome setting interpreted to be direct analogue for the Telfer gold-copper-silver For personal use only deposit 40km to the south • Similarities between Minyari and Telfer mineral systems include: • Domal fold structure setti
Slide 22: Deposit Cross-Section
Minyari Dome – Minyari Deposit Cross-Section • Highly favourable 200m geological setting: • Domal structure For personal use only • Carbonate bearing reactive host rocks (incl. Formation which hosts the Telfer deposit) • Excellent structural framework showing a high degree of similarity to structure
Slide 23: Deposit Cross-Section
Minyari Dome – Minyari Deposit Cross-Section For personal use only 100m Minyari Deposit oxide gold mineralisation under less than 1 metre of cover exposed within a 220m long costean constructed by Newmont in 1987 for the collection of two bulk samples: Sample results were 8.0 tonnes at 3.57 g/t gold
Slide 24: Deposit Cross-Section
Minyari Dome – Minyari Deposit Cross-Section 200m For personal use only Antipa Minerals - Presentation May 2016 24 24
Slide 25: Deposit Cross-Section
Minyari Dome – Minyari Deposit Cross-Section 200m For personal use only Antipa Minerals - Presentation May 2016 25 25
Slide 26: Discovery Opportunity ‘Telfer’ High-Grade
Minyari Dome – Discovery Opportunity ‘Telfer’ High-Grade Minyari High-grade Gold Gold ± Copper Mineralisation: ± Copper Targets = High-Grade Reef Style For personal use only = Variable Grade Breccia Style = Low-Grade Stockwork Vein Style Approximate Erosional (Surface) Level Magmatic fluids 1,000 to
Slide 27: Rio Tinto - Antipa Joint Venture - Citadel Project
Rio Tinto - Antipa Joint Venture - Citadel Project • Rio Tinto to fund up to $60M to earn up to a 75% interest in the Citadel Project by incurring exploration expenditure in the following stages and amounts; For personal use only • $3 million within 18 months of execution; • $8 million within a furt
Slide 28: Citadel Project – Magnum Dome Mineral Camp
Citadel Project – Magnum Dome Mineral Camp • Just 30km2 of the expansive 1,335km2 Citadel Project • Only six prospects diamond or RC drill tested; For personal use only • Three mineral deposits discovered • Significant intersections from two other targets • All deposits within 1 to 4 km of each othe
Slide 29: Calibre Deposit – High-Grade Opportunities
Calibre Deposit – High-Grade Opportunities • High and medium grade intersections including: – 30.0m at 2.30 g/t Au, 0.20% Cu including: For personal use only – 6.0m at 6.99 g/t Au, 0.48% Cu, also including; – 1.0m at 22.76 g/t Au, 0.26% Cu – 81.0m at 1.83 g/t Au, 0.15% Cu including: – 63.0m at 2.21
Slide 30: Calibre Deposit – Intersection Drillhole Information
Calibre Deposit – Intersection Drillhole Information • 30.0m at 2.30 g/t Au, 0.20% Cu from 107.0m downhole (15ACC0001; RC-DH on 11,400 North), including: – 6.0m at 6.99 g/t Au, 0.48% Cu from 109.0m downhole, also including; – 1.0m at 22.76 g/t Au, 0.26% Cu from 110.0m downhole For personal use only
Slide 31: Magnum Deposit – High-Grade Opportunities
Magnum Deposit – High-Grade Opportunities • Gold-Copper-Silver system 2km long x 600m wide x 600m deep and open in all directions • A significant low-grade, high tonnage gold– For personal use only copper–silver opportunity 600m • Hosts higher-grade gold and copper lenses/shoots: • 112.0m @ 1.92 g/t