Agnico Eagle Mines Limited · TSX:AEM

Agnico Eagle Mines — Merger or Acquisition (February 2007)

22 slides from Agnico Eagle Mines's merger presentation, Feb 14, 2007

  1. Slide 1: Acquisition of Cumberland Resources Ltd.

    Agnico-Eagle Mines Limited Acquisition of Cumberland Resources Ltd. February 2007

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement The information in this presentation has been prepared as at February 14, 2007. Certain statements contained in this presentation constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward loo

  3. Slide 3: No Offer

    No Offer This presentation does not constitute an offer to purchase or sell or a solicitation of an offer to sell or purchase shares of Cumberland or Agnico-Eagle. The Offer will be made to any person in the United States of America, its possessions and other areas subject to its jurisdiction or to,

  4. Slide 4: Acquisition of Cumberland Resources Ltd.

    Acquisition of Cumberland Resources Ltd. Agnico-Eagle intends to acquire all the outstanding shares of Cumberland via a take-over bid Cumberland’s main asset is the construction-stage Meadowbank gold project in Nunavut Agnico-Eagle currently owns approximately 2.6% of Cumberland, fully diluted

  5. Slide 5: Transaction Summary

    Transaction Summary Friendly take-over bid with Cumberland board support Share exchange 0.185 Agnico-Eagle shares per Cumberland share C$8.87 per share based on February 13 closing prices Premium of 23.7% to the 20 day VWAP (TSX) for both companies C$710 million transaction based on February 13 clos

  6. Slide 6: Transaction approved by the Boards; timeline

    Transaction approved by the Boards of Cumberland and Agnico-Eagle Fairness opinions received by Cumberland Transaction Summary Announcement (February 14, 2007) Circular to be mailed (March 2007) Bid expiry (April 2007)

  7. Slide 7: Strategic Rationale

    Enhances already significant gold production and reserve growth Transaction consistent with successful acquisition strategy used over long term Accretive to NAV, CFPS, per share gold leverage metrics Strong balance sheet with proforma cash balance of $550 million, available bank lines of $300 millio

  8. Slide 8: Why Cumberland?

    Why Cumberland? Consistent with strategy of gold growth – Meadowbank’s average production expected to be 350,000 oz/yr 100% owned, large and growing proven and probable reserves – 2.9 million oz to date Further exploration upside – potential to develop into a multi-decade mining camp Agnico-Eagle ha

  9. Slide 9: Growth in Gold

    Growth in Gold Meaningful increase in Agnico-Eagle’s gold reserves with minimal shareholder dilution Proven and Probable Reserves (oz, millions) 10.4 13.3 28% Fully Diluted Shares Outstanding (millions) 131 146 11% 0 2 4 6 8 10 12 14 Agnico-Eagle PF Agnico-Eagle 0 20 40 60 80 100 120 140 160 Agnico-

  10. Slide 10: Growth in Gold: 2007E–2010E Gold Production Profile

    Growth in Gold 2007E – 2010E Gold Production Profile Production LaRonde Goldex Lapa Kittila Pinos Altos Meadowbank 0 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 2007E 2008E 2009E 2010E

  11. Slide 11: Meadowbank Project - Nunavut

    Meadowbank Project - Nunavut LaRonde Nunavut Territory Toronto Baker Lake Meadowbank Project Raglan

  12. Slide 12: Meadowbank Project - Highlights

    Meadowbank Project - Highlights Three, closely-spaced open pits in proposed mine design Shallow pits planned to be mined to a depth of 170 metres Vault pit located 5 kilometres north of the Portage pit Technically straightforward mining and processing Source: Cumberland Resources Ltd. N Airstrip Goo

  13. Slide 13: Meadowbank Project Potential Upside is Substantial

    Meadowbank Project Potential Upside is Substantial Significant resource potential at depth below in-pit reserves at Goose South/Island Pit Higher grades at depth suggest underground mining potential 2007 exploration to focus on drilling at depth and near resource boundaries Over 40 known gold occurr

  14. Slide 14: Benefits to Cumberland Shareholders

    Benefits to Cumberland Shareholders Immediate 24% premium to Cumberland shareholders based on 20 trading day VWAP Agnico-Eagle provides financial capacity, exploration and mining expertise to increase value for all shareholders Cumberland shareholders will gain enhanced liquidity Agnico-Eagle listed

  15. Slide 15: Agnico-Eagle Going Forward

    Agnico-Eagle Going Forward Significant gold production and reserve growth Continue to deliver value through operational excellence and strategic acquisitions Meaningful exploration upside from large land position in four active gold camps Strong balance sheet enhanced via LaRonde’s significant cash

  16. Slide 16: Appendix: Cautionary Note to United States Investors

    Appendix CAUTIONARY NOTE TO UNITED STATES INVESTORS CONCERNING ESTIMATES OF MEASURED, INDICATED AND INFERRED RESOURCES The terms “measured”, “indicated” and “inferred” mineral resources are terms recognized and required under the securities legislation of certain countries, United States investors a

  17. Slide 17: About The Meadowbank Project

    About The Meadowbank Project Agnico-Eagle Preliminary Estimates Open Pit Mining Method: C$375 million Initial Capital Cost: C$65 million 8,500 tpd Mine Throughput: 93% Metallurgical Recovery: Eight Years Mine Life: Mill Site Airstrip Goose Island Pit Portage Pit Cannu Zone Average annual production:

  18. Slide 18: Meadowbank Project: Growing Gold Reserve and Resource

    Meadowbank Project – Nunavut Growing Gold Reserve and Resource +10 Years of Gold Growth (Millions of Ounces) Inferred Measured & Indicated Proven & Probable Reserves 3.8 3.9 4.0 3.5 3.2 3.0 2.0 1.7 1.5 1.1 0.8 0.2 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

  19. Slide 19: Meadowbank Project Reserves and Resources

    Meadowbank Project - Nunavut Project Reserves and Resources Proven & Probable 21,320,000 18,300,000 3,020,000 Tonnes 2,890,000 4.2 Note: 95% mining recovery and contact dilution applied. Reserves are a subset of Measured and Indicated Resources. 470,000 4.8 2,420,000 4.1 Ounces Grade (g/t) Category

  20. Slide 20: Meadowbank Project History

    Meadowbank Project - Nunavut Meadowbank Project History Date Event 1987 Prospectors first discover gold occurrences at Meadowbank 1995 Cumberland purchases 60% interest in the project, becomes operator of JV with Comaplex 1997 Cumberland acquires remaining 40% from Comaplex. Increased resources from

  21. Slide 21: Agnico-Eagle Current Project Reserves and Resources – December 2005

    Agnico-Eagle Current Project Reserves and Resources – December 2005 Proven & Probable 75,960,000 69,156,000 6,804,000 Tonnes 10,443,000 4.3 637,000 2.9 9,806,000 4.4 Ounces Grade (g/t) Category Agnico-Eagle Mineral Reserves Probable Proven

  22. Slide 22: Executive and Registered Office

    Executive and Registered Office: 145 King Street East, Suite 500 Toronto, Ontario, Canada, M5C 2Y7 Tel: 416-947-1212 Toll-Free: 888-822-6714 Fax: 416-367-4681 Email: info@agnico-eagle.com Web: www.agnico-eagle.com Trading Symbols: AEM / TSX & NYSE Warrants: TSX: AEM.WT.U / NASDAQ: AEMLW Sean Boyd Vi