Pensana PLC · LSE:PRE

Pensana — Investor Presentation (February 2024)

21 slides from Pensana's investor presentation, February 2024

  1. Slide 1: US$236 million Financing unlocks development of one of the world's largest rare earth mines

    US$236 million Financing unlocks development of one of the world’s largest rare earth mines Corporate Presentation February 2024 LSE:PRE

  2. Slide 2: Highly Supportive Major Shareholders have invested US$70 million to date

    Highly Supportive Major Shareholders have invested US$70 million to date LSE standard list (LSE: PRE) 12 Month Share Price 285 million shares on issue 70 Market Capitalization ~£90 million 60 Angolan Sovereign Wealth Fund FSDEA (26%) 50 (Invested US$32 million Mar 2020 – Apr 2023 and 40 US$15 millio

  3. Slide 3: Electric Vehicles to increase 10-fold by 2030 amid 'unstoppable' net zero shift

    Rare earth elements (kt) Electric Vehicles to increase 10-fold by 2030 amid ‘unstoppable’ net zero shift The transition to clean energy is happening worldwide and it's unstoppable. Electric vehicles are now expected to have a global market share of 38% of new sales by 2030. Rapid uptake in EVs in re

  4. Slide 4: Investment Opportunity for UK investors

    Investment Opportunity for UK investors Rare opportunity to gain direct exposure to the biggest energy transition in history The electrification of motive power through EVs and Wind Turbines will generate a demand growth for magnet metal NdPr of 7.5% CAGR over the next decade. Pensana owns one of th

  5. Slide 5: One of the Largest Undeveloped Rare Earth Deposits Globally

    One of the Largest Undeveloped Rare Earth Deposits Globally Excellent rail, hydro and port infrastructure JORC RESERVE 30 million tonnes containing 166,000 tonnes NdPr oxide for initial 20-year mine-life. Shallow, deeply weathered orebody, with an Sulima Monte Verde average mine depth of less than 3

  6. Slide 6: Exciting new discoveries at Coola and Sulima West - 75 km north of Longonjo

    Exciting new discoveries at Coola and Sulima West - 75 km north of Longonjo Coola confirmed as a 900-metre diameter carbonatite ring dyke with similar scale and prospectivity to Longonjo. Sulima West has reported strong anomalies with high-grade mineralisation for drill testing. Metallurgical testwo

  7. Slide 7: Angola - Attracting Global Mining Investment

    Angola - Attracting Global Mining Investment Untapped critical minerals endowment, exceptional rail, hydro and port infrastructure and a highly supportive Government. Ivanhoe Founder Robert Friedland “We thank the government of Angola for welcoming Ivanhoe Mines and entrusting us to explore their va

  8. Slide 8: State-of-the-art Mine and Processing Facility

    State-of-the-art Mine and Processing Facility Upfront capital cost lowest amongst peers Upfront capital cost of US$217 million, with circa US$105 million deferred until year three. Low capex due to excellent rail, hydro and water infrastructure. US$1,200 m ARU US$1,000 m US$800 m US$600 m US$400 m R

  9. Slide 9: Highly Experienced Project Delivery Team

    Highly Experienced Project Delivery Team Proven design and delivery track record of modular process plants across Africa MCC is a leading project management team with a track record of delivering projects across Africa including Angola. ADP African minerals specialist in detailed design, constructio

  10. Slide 10: Modular Manufacture On-site Assembly Extensively Pilot-Tested

    Tails Thickener Flotation Scrubbing Concentrate Thickening & Milling Concentrate CCD Leaching Drying Nano Filtration Acid Bake Calciner MREC Precipitation Acid Plant MREC Product Bagging Reagent Storage Modular Manufacture On-site Assembly Extensively Pilot-Tested High Quality Vendors Hydro & Solar

  11. Slide 11: Access road upgraded, 350-person camp being fabricated off-site, major earthworks well advanced

    Access road upgraded, 350-person camp being fabricated off-site, major earthworks well advanced and long lead items ordered ahead of main construction May 2024

  12. Slide 12: Construction and Commissioning Schedule – on track for first production in 2025

    Construction and Commissioning Schedule – on track for first production in 2025

  13. Slide 13: Strong demand for Longonjo's Highly-Marketable Mixed Rare Earth Carbonate (MREC)

    Strong demand for Longonjo’s Highly-Marketable Mixed Rare Earth Carbonate (MREC) MINE TO MAGNET One of the only mine developers to offer a high TRANSPARENCY value, radionuclide-free product available for export. C02 targets as a key criterion and 50% diversified supply chain. Executed letter of inte

  14. Slide 14: China controls 91% of Refining, 87% of Separation and 94% of Magnet Production

    Looking to Establish an Independent Downstream Supply Chain Upstream Separation Metallisation Magnet Mine & Processing Saltend Chemicals Park Yorkshire Energy Park • 40,000 tpa MREC • 12,500 tpa TREO • 4,000 tpa NdPr alloy • UK/Europe location • Offtake underway • 4,400 tpa NdPrO • Low electricity c

  15. Slide 15: Longonjo Financing

    Longonjo Financing US$156 million Debt and US$80 million Equity Financing at the subsidiary level (PRE 65%). Major shareholder Angolan Sovereign Wealth Fund (FSDEA) is currently funding construction activities via a US$15 million loan, ensuring project momentum. The Longonjo lender consortium has pr

  16. Slide 16: Longonjo - Compelling Economics

    Longonjo - Compelling Economics Low upfront Capex with strong cashflow very highly leveraged to the NdPr price Adamas Intelligence Investment Bank Base Case 1 Forecast US$ / TONNE NDPR OXIDE NPV @ 8% US$ 1,116 million US$ 603 million 300,000 IRR 34% 29% 200,000 Payback 4 Years 4 Years Revenue Stage

  17. Slide 17: Strong Independent Board and Experienced Executive Management Team

    Strong Independent Board and Experienced Executive Management Team PAUL ATHERLEY RT HON BARONESS NORTHOVER ROBERT KAPLAN CHAIRMAN NON-EXEC DIRECTOR FINANCE DIRECTOR Mr. Atherley is an experienced mining Baroness Northover was the Prime Minister’s Mr Kaplan is a Chartered Accountant with executive an

  18. Slide 18: Rare earth deposits are not rare. So why do so few get into production?

    Rare earth deposits are not rare. So why do so few get into production? A: New projects need >100,000 tonnes NdPr Reserve, Low upfront Capex and Finance. *Bubble Size = Lynas Market Capitalisation Reserve/Resource MP in tonnes of NdPr Arafura Capex US$1,049 In Production 200,000 Finance and in Pensa

  19. Slide 19: The Energy transition is driving a massive demand for rare earths

    The Energy transition is driving a massive demand for rare earths. IEA: By 2030 there will be 350 million EVs which will drive rare earth demand 400%. CRU, Roskills, Adamas, Investment Banks all have RE price targets ~2-3X current levels. So how does a UK investor participate in this upside? Globall

  20. Slide 20: Contact

    CONTACT Pensana Plc Sign up for regular email updates or to Rex House, request a meeting with management 4th Floor, 4 - 12 Regent Street, info@pensana.co.uk London, SW1Y 4PE +44 203 356 2700 info@pensana.co.uk pensana.co.uk @PensanaRE in Pensana Plc

  21. Slide 21: Cautionary Statement

    CAUTIONARY STATEMENT This presentation and any additional documents presented (together the “Presentation Materials”) are being supplied to you solely Neither this document, nor any copy of it, may be taken or transmitted into any jurisdiction where it would be unlawful to do so. Any for information

Pensana — Investor Presentation (February 2024) on 6ix