Slide 1: Commercial & Industrial Standard Offer Program 2012 Workshop
COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2012 WORKSHOP
Slide 2: Welcome & Introduction
WELCOME & INTRODUCTION CHARLIE FLYNN DIRECTOR, ENERGY EFFICIENCY JARRETT SIMON MANAGER, PROGRAM IMPLEMENTATION LORETTA BATTLES ADMINISTRATION, COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAMS YOLANDA SLADE PROGRAM MANAGER, STANDARD OFFER PROGRAMS
Slide 3: Introductions (Cont.)
INTRODUCTIONS (CONT.) NEXANT TEAM JESSY SHAO KRISTIN KAMM DING LI KAI QIU FRONTIER TEAM KYLE CAFFEY LANI CLARK HOLLY PROSSER
Slide 4: Agenda
AGENDA 2011 PROGRAM SUMMARY 2012 PROGRAM DESCRIPTION SUPPLIER DIVERSITY DATABASE Q&A DRAWINGS DATABASE TRAINING (IF APPLICABLE)
Slide 5: 2011 Program Summary
2011 PROGRAM SUMMARY $5.6M ORIGINAL BUDGET SOLD OUT MARCH 2011 WAITING PROJECTS FROM 2010 NO LIGHTING CAP AGGRESSIVE MARKETING EFFORTS 9 MW GOAL EOY TOTALS $7.3M INCENTIVES RESERVED 15.2 MW REDUCTION 129 PROJECTS SUBMITTED 12 WAIT LIST PROJECTS – NOT ACTIVATED 101 COMPLETED P
Slide 6: Measure Distribution
MEASURE DISTRIBUTION Lighting/Cooling Distribution - % Lighting+Other distribution Others s 3% 16% Lighting Cooling Lighting+Oth ers Others Cooling 17% Lighting 64%
Slide 7: Construction Type
CONSTRUCTION TYPE Retrofit/New Construction - % Distribution New 6% Retrofit New Retrofit 94%
Slide 8: Savings Methodology
SAVINGS METHODOLOGY M&V Methodology - % Distribution Simplified M&V 37% Deemed Simplified M&V Deemed 63%
Slide 9: 2011 Program Concerns
2011 PROGRAM CONCERNS PROVIDE PROJECT ID NUMBER WITH ALL CORRESPONDENCE REQUEST FOR PRE INSPECTIONS PRIOR TO PA SUBMITTAL MULTIPLE PARTIES INQUIRING ON SINGLE PROJECT EXPIRED BUSINESS CHECKS ON WAITLIST PROJECTS VALID CONTACT NAMES/NUMBERS IN DATABASE RETROFITS ON VACANT FACILITIES 75%
Slide 10: 2012 Commercial Standard Offer Program Guidelines
2012 COMMERCIAL STANDARD OFFER PROGRAM GUIDELINES
Slide 11: Continuing for 2012
CONTINUING FOR 2012 LED PROJECTS SHALL REQUIRE AT LEAST ONE OF THE FOLLOWING PROVIDED BY PROJECT SPONSORS: ENERGY STAR © QUALIFIED NEEP QUALIFIED PRODUCTS LISTING PREVIOUSLY UTILITIES REVIEWED AND APPROVED LED PRODUCT LED OUTDOOR PROGRAM CUT SHEETS, SQUARE FOOTAGE & ALL PERTINENT DOCUMEN
Slide 12: 2012 Key Changes
2012 KEY CHANGES INCENTIVE RATE CHANGES BASED ON MEASURE TYPE RELAMPING IS ALLOWED AT DISCOUNTED INCENTIVE RATE (30% OF THE NON-LED LIGHTING INCENTIVE) LIGHTING SPREADSHEET UPDATED EFFICIENCY STANDARD LIGHTING – STANDARD T8 BECOMES MINIMUM EFFICIENCY REQUIREMENT FOR NEW LIGHTING FIXTURES
Slide 13: 2012 Incentive Rates
2012 INCENTIVE RATES MEASURE TYPE $/KW $/KWH LIGHTING – FLOURESCENT, 120 .04 HID, CFL LIGHTING – LED 210 .08 COOLING – DX UNITS 240 .09 COOLING – CHILLER 260 .11 MOTOR 235 .09 VFD 180 .07 WINDOW FILM 200 .08 WINDOW REPLACEMENT 210 .08 ROOFING 240 .09 ALL OTHER MEASURES 175 .06
Slide 14: Program Overview
PROGRAM OVERVIEW CNP PROVIDES A SET INCENTIVE PAYMENT TO PROJECT SPONSORS FOR EACH KW AND KWH SAVED PROJECT SPONSORS AGREE TO DELIVER A STIPULATED AMOUNT OF KW AND KWH SAVINGS ALL PAYMENTS ARE BASED SOLELY UPON VERIFIED KW AND ANNUAL KWH SAVINGS EMPHASIS PLACED ON PEAK SUMMER DEMAND SAVINGS
Slide 15: Possible Codes Changes
POSSIBLE CODES CHANGES POSSIBLE CHANGES ON THE HORIZON FOR 2012 PUCT IS CURRENTLY REVIEWING ENERGY EFFICIENCY RULES AND STANDARDS, DEPENDING ON FINAL RULING, MAY OR MAY NOT BE ABLE TO ‘GRANDFATHER’ CURRENT PROCESS AND PROCEDURES MANY CONSIDERATIONS BEING CONSIDERED ON THE LOCAL, STATE AND FEDE
Slide 16: New Vendors
NEW VENDORS SUPPLIER REGISTRATION WWW.CENTERPOINTENERGY.COM/ABOUT/CONTACT/SUPP LIERS VENDOR REGISTRATION IRS FORM W-9 (EMPLOYER IDENTIFICATION NO.) ELECTRONIC FUNDS TRANSFER AUTHORIZATION EID AND EFT INFORMATION IS VERIFIED BY
Slide 17: Contracting Process
CONTRACTING PROCESS SUPPLIER REGISTRATION - NEW VENDORS PROGRAM APPLICATION & APPROVAL INTERNAL REQUISITION SUBMITTED & APPROVED SUPPLIER & VENDOR NUMBER VERIFIED CREATE CONTRACT DOCUMENTS STANDARD TERMS AND CONDITIONS CONTRACT EXECUTION PROJECT COMPLETION/VERIFICATION INVOICE & PA
Slide 18: Program Participants Roles
PROGRAM PARTICIPANTS ROLES PROGRAM RESPONSIBILITIES ROLE OVERSEE THAT PROGRAMS FOLLOW PUCT RULES ADJUST PROGRAM BUDGET AS NEEDED ENTER STANDARD AGREEMENTS WITH THE PROJECT SPONSOR PROGRAM REVIEW, APPROVE OR REJECT PROGRAM APPLICATIONS ADMINISTRATOR VERIFY AND INSPECT THAT MEASURES MEET INTENDED
Slide 19: Project Sponsor Requirements
PROJECT SPONSOR REQUIREMENTS PROJECT SPONSORS MUST HAVE: ALL APPROPRIATE LICENSES/CERTIFICATIONS EVIDENCE OF TECHNICAL AND MANAGERIAL CAPABILITIES AND EXPERIENCE EVIDENCE OF FINANCIAL CAPABILITY ADEQUATE INSURANCE REFERENCES
Slide 20: Project Sponsor
PROJECT SPONSOR MAY BE: NATIONAL OR LOCAL ENERGY SERVICE COMPANIES (ESCOS) NATIONAL OR LOCAL COMPANIES THAT PROVIDE ENERGY-RELATED SERVICES OR PRODUCTS LOCAL CONTRACTORS COMMERCIAL PROPERTY DEVELOPERS DESIGN/BUILD FIRMS ARCHITECTURAL AND ENGINEERING FIRMS INDIVIDUAL COMMERCIAL CUSTOM
Slide 21: Customer
CUSTOMER MAY BE: ANY NON-RESIDENTIAL CUSTOMER TAKING SERVICE AT A METERED POINT OF DELIVERY AT A DISTRIBUTION VOLTAGE (<69KVA) NON-PROFIT GOVERNMENT ENTITY EDUCATIONAL INSTITUTION MUST ALLOW PRE AND POST INSPECTION AT CUSTOMER SITE
Slide 22: Project Eligibility
PROJECT ELIGIBILITY WITHIN CENTERPOINT ENERGY ELECTRIC SERVICE TERRITORY PROVIDE ESI NUMBER, BEGINNING 100890 COMPLETE SPONSOR APPLICATION AND 5% DEPOSIT REQUIRED TO SUBMIT APPLICATION SPREADSHEET UPLOADS MUST BE COMPLETE WITHIN THE SPONSOR APPLICATION
Slide 23: Project Eligibility (Cont.)
PROJECT ELIGIBILITY (CONT.) LARGE COMMERCIAL MINIMUM REDUCTION OF 20KW AND/OR 120,000KWH AT PEAK LIKE CUSTOMERS MAY BE AGGREGATED TO MEET THIS CRITERIA CUST MUST HAVE MINIMUM LOAD OF 100 KW AT PEAK, AGGREGATE CUST MUST REACH 250KW SMALL COMMERCIAL MAY NOT HAVE MORE THAN 100KW PEAK DEMAND
Slide 24: Aggregating Projects
AGGREGATING PROJECTS SIMILAR PROJECTS SHOULD: HAVE SAME PROJECT SPONSOR INCORPORATE SAME MEASURES HAVE LIKE OCCUPANCY SCHEDULES HAVE SAME FUNCTIONAL USE HAVE SAME ENERGY CONSUMPTION PATTERNS COMMON MEASUREMENT & VERIFICATION PLAN
Slide 25: 2012 Program Goals/Budget
2012 PROGRAM GOALS/BUDGET 2012 SAVINGS GOAL 2012 INCENTIVE BUDGET 9 MW $6.2 MILLION INCENTIVE RATES VARY ACCORDING TO MEASURE INCENTIVES ARE PAID FOR VERIFIED ANNUAL SAVINGS OVER A ONE YEAR PERIOD ONE PROJECT SPONSOR MAY RESERVE UP TO 20% OF THE PROGRAM BUDGET
Slide 26: 2011 Program Resources
2011 PROGRAM RESOURCES HTTP://WWW.CENTERPOINTEFFICIENCY.COM: PROGRAM ANNOUNCEMENTS PROGRAM MANUAL WORKSHOP PRESENTATION SERVICE AREA MAP PROJECT AUTHORIZATION FORM HOST CUSTOMER AGREEMENT SPEADSHEET APPLICATIONS ACTIVE PROJECT SPONSOR LISTING INFORMATION ON AVAILABLE FUNDING PR
Slide 27: Application Deposit
APPLICATION DEPOSIT APPLICATION DEPOSIT IS 5% OF REQUESTED INCENTIVE DEPOSIT MUST BE SUBMITTED BEFORE PROJECT APPLICATION CAN BE SUBMITTED DEPOSIT IS FULLY REFUNDED FOR PROJECTS THAT RECEIVE 75% OR MORE OF REQUESTED INCENTIVE IN THE PROJECT APPLICATION PROJECTS WHICH DELIVER BETWEEN 50% - 75
Slide 28: Invoicing and Payment
INVOICING AND PAYMENT PERFORMANCE PAYMENT BASED ON VERIFIED SAVINGS AND APPROVED SAVINGS REPORT DEEMED METHOD 100% PAYMENT AFTER INSTALLATION REPORT M&V METHOD 40% AFTER INSTALLATION REPORT 60% AFTER SAVINGS REPORT
Slide 29: Measure Eligibility
MEASURE ELIGIBILITY PRODUCES MEASURABLE PEAK DEMAND AND/OR ENERGY SAVINGS 10 YEARS PERSISTENCE PEAK DEMAND IS DEFINED AS JUNE 1 THROUGH SEPTEMBER 30, M – F, 1PM – 7PM PERMANENTLY INSTALLED (NO PLUG LOAD) EXCEEDS MINIMUM EFFICIENCY STANDARDS
Slide 30: Examples of Eligible Measures
EXAMPLES OF ELIGIBLE MEASURES CHILLER REPLACEMENT PACKAGED COOLING UNIT REPLACEMENT LIGHTING RETROFITS LAMP AND BALLAST MOTOR EFFICIENCY MEASURES WINDOW FILM APPLICATIONS ROOFING APPLICATIONS INDUSTRIAL PROCESS MEASURES
Slide 31: Ineligible Measures
INELIGIBLE MEASURES FUEL SWITCHING TO ELECTRIC MEASURES THAT REQUIRE NO CAPITAL INVESTMENT MEASURES THAT DO NOT HAVE 10 YEARS PERSISTENCE MEASURES THAT RECEIVE INCENTIVES IN OTHER CNP PROGRAMS REDUNDANT EQUIPMENT (IE BACKUP CHILLERS) REMOVABLE MEASURES (IE PLUG LOAD, VENDING MACHINES)
Slide 32: Retrofit Applications Baseline
RETROFIT APPLICATIONS BASELINE EQUIPMENT TYPE APPLICABLE BASELINE STANDARD COOLING EQUIPMENT ASHRAE 90.1 – 1999 OR FEDERAL STANDARD WHICHEVER IS MORE STRINGENT LIGHTING TABLE OF STANDARD FIXTURE WATTAGES (BASED ON 1992 EPACT) MOTORS ASHRAE 90.1M – 1995 BUILDING ENVELOPE IECC 2003
Slide 33: New Construction Baseline
NEW CONSTRUCTION BASELINE EQUIPMENT TYPE APPLICABLE BASELINE STANDARD COOLING EQUIPMENT ASHRAE 2007 OR 2008 CITY OF HOUSTON COMMERCIAL ENERGY CONSERVATION CODE LIGHTING EISA 2004, ENERGY STAR* OR DLC MOTORS 2008 CITY OF HOUSTON BUILDING ENVELOPE COMMERCIAL ENERGY CONSERVATION CODE HTTP://DOCUMENTS.P
Slide 34: Application Submittals
APPLICATION SUBMITTALS THE FOLLOWING INFORMATION MUST BE SUBMITTED AS PART OF THE APPLICATION PROCESS: PROJECT INFORMATION PROJECT DESCRIPTION SITE INFORMATION SAVINGS CALCULATION ESTIMATED COMPLETION SCHEDULE QUALIFICATION SET REFERS TO PROJECT SPONSOR SPONSOR CONTACT SHOULD THE
Slide 35: Application Submittals (Cont.)
APPLICATION SUBMITTALS (CONT.) DOCUMENTS MUST BE PROVIDED AS PART OF THE APPLICATION PROCESS: CUT SHEET OF THE NEW LIGHTING FIXTURE INDICATING LAMP TYPE, LAMP WATTAGE, BALLAST TYPE AND BALLAST FACTOR DISPOSAL RECORDS OF THE REMOVED EXISTING LIGHTING LIGHTIN FIXTURES IF FLORESCENT LAMP WAS REMOVED
Slide 36: Application Submittals (Cont.)
APPLICATION SUBMITTALS (CONT.) ADDITIONAL DOCUMENTS MUST BE PROVIDED AS PART OF THE APPLICATION PROCESS IF INSTALLATION IS COMPLETED PRIOR TO PRE INSPECTION PHOTOS OF THE EXISTING LIGHTING FIXTURES INDICATING THE LAMP AND BALLAST TYPE LIGHTING DISPOSAL RECORDS INDICATING THE QUANTITY OF THE DISPOS
Slide 37: Program Process
PROGRAM PROCESS SECURE AN APPLICABLE PROJECT REGISTER AS A PROJECT SPONSOR COMPLETE CONTRACT DOCUMENTATION, IF NEW SPONSOR SUBMIT 5% DEPOSIT SUBMIT PROJECT APPLICATION SIGN STANDARD AGREEMENT SIGN PROJECT AUTHORIZATION FORM INSTALL PROJECT SUBMIT INSTALLATION REPORT CONDUCT MEASU
Slide 38: Program Timeline
PROGRAM TIMELINE NOVEMBER 30TH, 2011 DATABASE OPENS FOR APPLICATIONS DEPOSIT CHECKS MAY BE ACCEPTED DECEMBER 1ST, 2011 PROJECTS INSTALLATION MUST BE COMPLETE COMPLETE DATABASE APPLICATIONS, POST INSPECTIONS TO FOLLOW PAYMENTS MUST BE PROCESSED BEFORE 12/30/2011 DECEMBER 14TH, 2011 APPLIC
Slide 39: Getting Started
GETTING STARTED REGISTER AS PROJECT SPONSOR IN ENERTREK VIA DATABASE CHECK WEBSITE AT WWW.CENTERPOINTEFFICIENCY.COM FOR LATEST INFORMATION SEND HARD COPY OF APPLICABLE FORMS AND DEPOSIT TO: CENTERPOINT ENERGY ATTENTION: YOLANDA SLADE 1111 LOUISIANA, 9TH FLOOR HOUSTON, TX 77002
Slide 40: C&I Program Measurement and Verification (M&V) Requirements
C&I PROGRAM MEASUREMENT AND VERIFICATION (M&V) REQUIREMENTS
Slide 41: C&I M&V Approaches
C&I M&V APPROACHES DEEMED SIMPLIFIED M&V FULL M&V SAVINGS BASED ON DATA FROM BASED ON ENGINEERING REQUIRED FOR ALL PAST DSM PROGRAMS CALCULATIONS USING MEASURES NOT MEETING AND INDUSTRY DATA TYPICAL EQUIPMENT CRITERIA FOR DEEMED OR CHARACTERISTICS FOR SIMPLIFIED M&V PARTICULAR APPLICATIONS NO METERI
Slide 42: M&V Options
M&V OPTIONS APPLICABLE M&V MEASURE METHODOLOGY CHILLER REPLACEMENT DEEMED, SIMPLIFIED, FULL PACKAGED COOLING DEEMED, SIMPLIFIED, FULL UNIT REPLACEMENT LIGHTING CONTROLS DEEMED, SIMPLIFIED, FULL WINDOWS AND ROOFS DEEMED, SIMPLIFIED, FULL MOTOR EFFICIENCY DEEMED, SIMPLIFIED, FULL UPGRADES
Slide 43: M&V Options (Cont.)
M&V OPTIONS (CONT.) APPLICABLE M&V MEASURE METHODOLOGY CONSTANT AIR TO VARIABLE SIMPLIFIED, FULL AIR-SIDE CONVERSIONS (IF OTHER MEASURE INCLUDED FAN AND PUMP VARIABLE SIMPLIFIED, FULL SPEED DRIVE (VSD) INSTALLATIONS HEAT PIPES, ENTHALPY WHEEL SIMPLIFIED, FULL AND OTHER FORMS OF ENERGY RECOVERY AIR C
Slide 44: M&V Options (Cont.)
M&V OPTIONS (CONT.) APPLICABLE M&V MEASURE METHODOLOGY COGENERATION PROJECTS (CASE BY CASE BASIS) FULL RENEWABLE TECHNOLOGIES (SOLAR, WIND, TIDAL, FULL GEOTHERMAL, ETC.) NON-UNIFORM LOADS, WHOLE BUILDING ANALYSIS, SIMULATION, COMPLEX FULL CONTROL SYSTEMS WITH INTERACTIVE EFFECTS, ETC.
Slide 45: Standard Offer Program
STANDARD OFFER PROGRAM OPEN TO ALL ELIGIBLE PROVIDERS WITHIN THE CNP TERRITORY TRANSMISSION CLASS (>69KV) ARE EXCLUDED FIRST COME, FIRST SERVE ONE YEAR PAYOUT PAYMENTS TIED TO VERIFIED SAVINGS STANDARDIZED TERMS FOR ALL PARTICIPANTS RETROFIT AND NEW CONSTRUCTION MEASURES
Slide 46: 2012 Program Timing
2012 PROGRAM TIMING REGISTRATION FOR 2012 PROGRAM AVAILABLE 11/30/2011 APPLICATIONS FOR 2012 PROGRAM ACCEPTED 12/14/2011 SUBMIT APPLICATIONS AT 10:00AM CST NO INCENTIVE PAYMENTS FOR 2012 PROGRAM PROCESSED PRIOR TO JANUARY 3, 2012 INSTALLATION REPORTS FOR 2012 PROGRAM DUE NO LATER THAN DECE
Slide 47: Submit Day December 14, 2011
SUBMIT DAY DECEMBER 14, 2011 @ 10:00 AM, CENTRAL TIME **IN ORDER TO SUBMIT YOUR PROJECT, CNP MUST HAVE YOUR DEPOSIT BEFORE DECEMBER 14, 2011! **
Slide 48: Supplier Diversity
SUPPLIER DIVERSITY
Slide 49: Supplier Diversity Policy Statement
SUPPLIER DIVERSITY POLICY STATEMENT CENTERPOINT ENERGY, INC. RECOGNIZES THE IMPORTANCE OF MINORITY AND WOMEN- OWNED BUSINESS ENTERPRISES (MWBE) TO THE ECONOMIES OF THE NATION, THE STATE, AND THE COMMUNITIES IT SERVES, AS WELL AS THE CORPORATION ITSELF. THEREFORE, WE ARE COMMITTED TO PURSUING BUS
Slide 50: Supplier Diversity Contacts
SUPPLIER DIVERSITY CENTERPOINT ENERGY JEWEL SMITH, MANAGER OF SUPPLIER DIVERSITY (713)207- 6951; JEWEL.SMITH@CENTERPOINTENERGY.COM STEVE DUKES, SUPPLIER DIVERSITY COORDINATOR (713)207- 3388; STEVE.DUKES@CENTERPOINTENERGY.COM HOUSTON MINORITY BUSINESS COUNCIL CONSTANCE JONES (713)271–7805; WWW.HM
Slide 51: Database Updates
DATABASE UPDATES MONITORED BY: FRONTIER & ASSOCIATES
Slide 52: Register as a New User
REGISTER AS A NEW USER Large Commercial SOP 10/12/2009 4:12:15 PM First time users click here. Returning users enter Username and Password : Username: Password: Forgot Username/Password ? Please continue to check the website for updates on the submittal date and time. If you have questions about the
Slide 53: Registration Form
REGISTRATION FORM Large Commercial SOP 10/13/2009 3:30:34 PM Federal Tax ID / SSN User First Name : 00-0000000 User Last Name Desired Username Password Password (again) Contact Phone Contact Email Check here if you would like to receive email updates Accept User Information ] [ Undo J * All fields r
Slide 54: Application Landing Page
APPLICATION LANDING PAGE Large Commercial SOP 10/13/2009 4:39:04 PM Profile K Qualification J Users | Projects | Message | Downloads | Report ® Sponsor: Test Company Name e User : Test User First Name Test User Last Name Projects - Maximum Sponsor Limit : $1,180,000.00 - Minimum Project Size (kW) :
Slide 55: Program Application Summary
PROGRAM APPLICATION SUMMARY
Slide 56: Submit an Application
SUBMIT AN APPLICATION ALL APPLICATIONS SHOULD BE COMPLETE AND ACCURATE AND READY TO BE SUBMITTED SEVERAL DAYS PRIOR TO THE PROGRAM SUBMIT DATE TO ALLOW TIME FOR DEPOSITS TO BE SUBMITTED AND LOGGED.
Slide 57: Submit an Application
SUBMIT AN APPLICATION On the designated submit day, the “Submit” button for that program will become active after refreshing the screen at the program submit time. For example, applications can be submitted for the CNP Commercial program Dec. 14, 2011, at 10:00 AM CST.
Slide 58: Random 4-Digit Number
RANDOM 4-DIGIT NUMBER 1. Enter the random 4-digit number as displayed on the screen in the box provided. 2. Click on the “Submit” button. This submits the application.
Slide 59: New Feature - My View
NEW FEATURE-“MY VIEW" 2011 Program Waiting List 2010 Program 2009 Program e CenterPoint Energy
Slide 60: New Feature - My View
_N EW FEATURE-“MY VIEW” a e CenterPoint Energy
Slide 61: New Feature - My View
_N EW FEATURE-“MY VIEW” a My View Name Open Projects Check here if this is the default view. Program Year CenterPoint 2012 Wait List CenterPoint 2012 Large Commercial SOP - Settlement CenterPoint 2012 Large Commercial SOP Project Type IA, not submitted IA, submitted, reviewing IA, approved FA, not s
Slide 62: 2012 Equipment Surveys
2012 EQUIPMENT SURVEYS DOWNLOAD AND USE ONLY THE UPDATED 2012 EQUIPMENT SURVEY FORMS. OLDER VERSIONS WILL NOT UPLOAD. AS IT WAS LAST YEAR, THE LIGHTING FORM WILL BE COMBINED INTO ONE SURVEY FORM FOR EXISTING/NEW CONSTRUCTION AND DEEMED SAVINGS/M&V.
Slide 63: Frontier Contacts
FRONTIER CONTACTS ENERTREK QUESTIONS LANI CLARK LCLARK@FRONTIERASSOC.COM LIGHTING QUESTIONS HOLLY PROSSER HPROSSER@FRONTIERASSOC.C OM
Slide 64: Questions?
QUESTIONS? id Energy
Slide 65: Drawings
DRAWINGS Gs CenterPoint en Cs"
Slide 66: Contact Information
CONTACT INFORMATION YOLANDA SLADE PHONE: 713-207-7762 EMAIL – YOLANDA.SLADE@CENTERPOINTENERGY.COM LORETTA BATTLES PHONE: 713-207-3543 EMAIL – LORETTA.BATTLES@CENTERPOINTENERGY.COM WEBSITE: WWW.CENTERPOINTEFFICIENCY.COM