Finder Energy Holdings Limited · ASX:FDR

Finder Energy — Investor Presentation (July 2025)

21 slides from Finder Energy's investor presentation, Jul 31, 2025

  1. Slide 1: Corporate Presentation July 2025

    Corporate For personal use only Presentation July 2025 ASX : FDR 1

  2. Slide 2: Highlights – Multiple Catalysts in 2H 2025

    Highlights – Multiple Catalysts in 2H 2025 Accelerated FEED underway to fast-track development of the Kuda 01 Tasi and Jahal oil fields in Timor-Leste (22 MMbbl Gross 2C1) For personal use only Powerful cash flow with initial forecast production rates of 02 25,000 - 40,000 bopd and 10 MMbbl produced

  3. Slide 3: Corporate Snapshot (ASX:FDR)

    Corporate Snapshot (ASX:FDR) Tranche 2 (T2) of placement is expected to settle following approval at EGM to be held on 20 August 20253 Shareholder Breakdown (%) Current Share Price1 For personal use only Shares on issue 7.5c 335.6m T2 376.6m Market Capitalisation2 $25.2m Enterprise Value (EV) 55% 47

  4. Slide 4: Finder Energy Board and Management

    Finder Energy Board and Management Bronwyn Barnes Damon Neaves Shane Westlake Fred Wehr Mark Robertson Independent Chairman CEO / Managing Director Technical Director Independent Non-Exec Director Project Director / COO Extensive career in the resources 20 years in leadership roles as an Geophysicis

  5. Slide 5: Timor-Leste Overview

    For personal use only PSC 19-11 Timor-Leste Overview 5

  6. Slide 6: PSC 19-11 Resources

    PSC 19-11 Resources Kuda Tasi Contingent and Prospective Resources1 16 MMbbl Karungu 180 Oil – MMbbl Jahal 10 For personal use only 6 MMbbl 160 26 PSC 19-11 140 Lanjara/SW 30 Laminaria/ 76% 120 Corallina 205 MMbbl Kitan 24% Buffalo 26 MMbbl 100 49 21 MMbbl 80 N Krill 14 MMbbl Squilla 60 10 km 9 MMbb

  7. Slide 7: SLB Strategic Alliance

    SLB Strategic Alliance Strategic Development Alliance1 For personal use only • SLB and FDR entered into an alliance to fast-track development of the Kuda Tasi and Jahal oil fields (KTJ Project) • Completion of key drilling and subsea FEED components approximately 12 months ahead of schedule - markin

  8. Slide 8: Accelerated FEED Project

    Accelerated FEED Project Accelerated FEED Project Agreement1 FPSO For personal use only • FEED completed across technical domains including Subsurface, Well Construction, Reservoir, SPS and SURF • Project schedule – 6 to 9 months, 12 months ahead of schedule SPS/SURF • Core objectives and scope • de

  9. Slide 9: Simple and Quick Development

    Simple and Quick Development For personal use only Conventional FPSO development FPSO’s are readily available for lease or redeployment rather than new build Simple subsea production system High value light sweet oil, low impurities Tanker offtake - no pipelines required for export 9

  10. Slide 10: KTJ High Performance Reservoir

    KTJ High Performance Reservoir Modelled Production Curves1 • High flow rates driven by: • High quality Laminaria Formation reservoir For personal use only • Regional aquifer provides pressure support • Light sweet oil (55-60° API), with low GOR • Dynamic reservoir modelling predicts initial producti

  11. Slide 11: Sharper Seismic Imaging Unlocks Value

    Sharper Seismic Imaging Unlocks Value Modern, high end technology processing Data quality of key reservoir target and delivered outstanding image improvements faults exceeded expectations For personal use only Kuda Tasi La nja ra Kita n 2025 2025 Key Reprocessing Objectives • Position development we

  12. Slide 12: The Path to FID Leads to Value Recognition

    The Path to FID Leads to Value Recognition 2024 VALUE Subsurface • 34.3 MMbbl1 Net 2C discovered oil in PSC 19-11 2P US$10-30/bbl For personal use only • 16.7 MMbbl1 Net 2C development ready at Kuda Tasi & Jahal NPV102 Proven Reserves 2025 Development Capability • SLB Integrated Project Team • Subsu

  13. Slide 13: North Sea – UK Exploration Licences

    For personal use only North Sea – UK Exploration Licences 13

  14. Slide 14: UK North Sea – ILX Exploration Portfolio

    UK North Sea – ILX Exploration Portfolio P2610 (50%) N Prolific Central North Sea 40 km For personal use only Johan Svedrup • All licences operated by P2655 (100%) Finder Gina Krog Claymore Piper Sleipner • Strategic partnerships Tartan formed with nearby Scott Kinnoull facility owners Golden Eagle

  15. Slide 15: North West Shelf - Australia Exploration Permits

    For personal use only North West Shelf - Austraila Exploration Permits 15

  16. Slide 16: Australia - key positions in prolific basins

    Australia - key positions in prolific basins WA-547-P (100%) Northern Carnarvon Basin Vulcan Sub-basin • 508 MMboe over Phoenix Proven Play For personal use only Oliver 3 key prospects1 Phoenix South surrounded by full- to-spill discoveries Roc • Along trend from Dorado Pavo Audacious Dorado Discove

  17. Slide 17: Appendices

    For personal use only APPENDICES 17

  18. Slide 18: Contingent and Prospective Resources

    Contingent and Prospective Resources Contingent Resources7 Oil/Cond Gross Contingent Resources Net Contingent Resources ASX announcement reference date and Country Licence FDR Equity Name Status (MMbbl)/ notes3 Gas (BCF) 1C 2C 3C 1C 2C 3C For personal use only Kuda Tasi Field Oil 9.0 15.6 24.8 6.8 1

  19. Slide 19: Notes on Petroleum Resource Calculations

    Notes on Petroleum Resource Calculations Table Notes 1. Finder calculates reserves and resources according to the Society of Petroleum Engineers Petroleum Resource Management System (SPE-PRMS) definition of petroleum resources. Finder reports reserves and resources in line with ASX listing rules. Fo

  20. Slide 20: Disclaimers and Cautionary Statement

    Disclaimers and Cautionary Statement Forward-looking statements This announcement contains certain “forward-looking statements”, which can generally be identified by the use of words such as “will”, “may”, “could”, “likely”, “ongoing”, “anticipate”, “estimate”, “expect”, “project”, “intend”, “plan”,

  21. Slide 21: For personal use only

    For personal use only +61 8 9327 0100 info@finderenergy.com www.finderenergy.com 21

Finder Energy Holdings — Investor Presentation (July 2025) on 6ix