Rockland Resources Ltd. · CSE:RKL
Rockland Resources — Investor Presentation (April 2025)
18 slides from Rockland Resources's investor presentation, April 2025
Slide 1: Exploring for Tomorrow's Technology
CSE: RKL EXPLORING FOR TOMORROW’S TECHNOLOGY APRIL 2025
Slide 2: About Beryllium
BERYLLIUM ABOUT BERYLLIUM Beryllium is a lightweight metallic element used in a wide variety of specialty and industrial applications. As a function of its unique chemical and physical properties, such as a high stiffness-to-weight ratio, resistance to temperature extremes, and high thermal conducti
Slide 3: Lightweight Application, Heavy Impact
The ground-breaking James Webb Space Telescope contains 18 BERYLLIUM hexagonal mirrors made from beryllium. LIGHTWEIGHT APPLICATION, HEAVY IMPACT Beryllium is a lightweight, super-strong mineral that is playing a pivotal role in some of the most advanced technologies shaping the future. DEFENSE AI &
Slide 4: Powering Tomorrow's Technology
BERYLLIUM The global beryllium market is forecasted to grow at a CAGR of 4.78%* POWERING TOMORROW’S $300 $261.1 TECHNOLOGY $250 $227.0 $237.8 $249.2 $216.6 $206.7 The global beryllium market is experiencing steady $188.3 $197.3 $200 $179.7 growth and is projected to continue expanding $171.5 through
Slide 5: Our Projects
BERYLLIUM OUR PROJECTS Rockland Resources is advancing critical metals exploration in North America, specializing in beryllium at its strategically located Beryllium Butte and Claybank projects in the Spor Mountain region of Utah, USA. Spor Mountain is home to Materion’s (NYSE: MTRN) Spor Mountain M
Slide 6: Spor Mountain Mine
BERYLLIUM SPOR MOUNTAIN MINE* The Spor Mountain Mine in Utah is the largest beryllium producer in the world. The deposit has been mined since 1969 and is one of only three major beryllium deposits in the world that are economically viable. Beryllium mined from the Materion’s open-pit operations occu
Slide 7: Project Overview – Beryllium Butte
BERYLLIUM BUTTE PROJECT OVERVIEW Rockland’s permitted, drill-ready Beryllium Butte project is located in Juab County, Utah, 185 km south-west of Salt Lake City. The project is prospective for beryllium mineralization and located only 30km west of Materion Corp.’s currently producing Spor Mountain Mi
Slide 8: Saddle Zone Target
BERYLLIUM BUTTE SADDLE ZONE TARGET The Saddle Zone Target is interpreted to have strong similarities with the Miocene Spor Mountain Formation that hosts beryllium deposits currently in production at the Spor Mountain Mine. An initial grab sampling program returned significant beryllium concentration
Slide 9: Additional Target Elements: Gallium & Rubidium, Lithium
ADDITIONAL TARGET ELEMENTS GALLIUM & RUBIDIUM LITHIUM Rockland reviewed 133 samples that included The property hosts claystone volcanic tuff analysis for gallium (Ga) and rubidium (Rb). breccia units interpreted to be highly This analysis found: prospective for lithium (Li), beryllium (Be) and ▪ Pea
Slide 10: Beryllium Butte Project Timeline
BERYLLIUM BUTTE PROJECT TIMELINE Channel Sampling Resource Estimation Follow-up sampling returned Data compilation from all previous continuous chip samples over 25.5m programs would be used to begin averaging 1,142 ppm Be, with a definition of the mineral resource higher-grade portion returning 2,4
Slide 11: Project Overview – Claybank
CLAYBANK PROJECT OVERVIEW The Claybank Beryllium Project consists of two unpatented claims with a contiguous area of roughly 16 hectares (40 acres). The project connects via a 4.5km road to the paved Brush Highway that is used to ship ore from Spor Mountain’s mining operations to their treatment pla
Slide 12: Claybank Property History
CLAYBANK PROPERTY HISTORY The property saw historical drilling in 1987 with 31 vertical drill holes distributed along strike of an altered Tertiary tuff, the host rock for bertrandite ore being mined at Spor Mountain. Nineteen of the drillholes were closely-spaced and identified a zone of beryllium
Slide 13: Claybank Project Timeline
CLAYBANK PROJECT TIMELINE Maiden Drilling Proposed drilling would focus on historical drilling and targets generated by the preceding surface sampling and mapping program. PROJECT ACQUISITION Grab Sampling Resource Estimation A reconnaissance surface sampling Data compilation from all previous and m
Slide 14: Management & Directors
MANAGEMENT & DIRECTORS MIKE ENGLAND WILL RASCAN CEO & DIRECTOR PRESIDENT & DIRECTOR ▪ Involved in the public markets for over 40 years in various roles ▪ 30 years’ experience in the investment brokerage / capital markets industry ▪ Served in many upper management roles for numerous companies ▪ Durin
Slide 15: Technical Advisors
TECHNICAL ADVISORS ROBERT WEICKER ▪ Over 30 years’ experience in the mineral exploration and mining industries ▪ Has worked for both major and junior mining companies in various aspects CHRIS DORN ▪ Involved in the development of the largest gold mine in Canada ▪ MIT graduate and veteran of 4 years
Slide 16: Capitalization
CAPITALIZATION SHARES OUTSTANDING WARRANTS OPTIONS 27,229,558 9,155,000 2,480,000 OPTIONS EXPIRY AMOUNT PRICE WARRANTS Aug 4, 2025 40,000 $1.00 EXPIRY AMOUNT PRICE Oct 4, 2025 110,000 $0.60 Apr 27, 2025 1,044,000 $1.00 Aug 10, 2026 400,000 $0.35 Mar 21, 2026 450,000 $0.25 Oct 17, 2026 40,000 $0.35 J
Slide 17: Disclaimer
DISCLAIMER This presentation is strictly confidential and any disclosure, use, copying and circulation of The information contained herein has been prepared to assist the recipients in making their this presentation is prohibited without the consent of Rockland Resources Ltd. (“The own evaluation on
Slide 18: Corporate Office
CSE: RKL Corporate Office 1240-789 W Pender St. Vancouver, BC, V6C 1H2 1-604-683-3995 1-888-945-4770 info@rocklandresources.com rocklandresources.com CSE: RKL 18
Rockland Resources — Investor Presentation (April 2025) on 6ix