Rockland Resources — Investor Presentation (April 2025)

18 slides from Rockland Resources's investor presentation, April 2025

  1. Slide 1: Exploring for Tomorrow's Technology

    CSE: RKL EXPLORING FOR TOMORROW’S TECHNOLOGY APRIL 2025

  2. Slide 2: About Beryllium

    BERYLLIUM ABOUT BERYLLIUM Beryllium is a lightweight metallic element used in a wide variety of specialty and industrial applications. As a function of its unique chemical and physical properties, such as a high stiffness-to-weight ratio, resistance to temperature extremes, and high thermal conducti

  3. Slide 3: Lightweight Application, Heavy Impact

    The ground-breaking James Webb Space Telescope contains 18 BERYLLIUM hexagonal mirrors made from beryllium. LIGHTWEIGHT APPLICATION, HEAVY IMPACT Beryllium is a lightweight, super-strong mineral that is playing a pivotal role in some of the most advanced technologies shaping the future. DEFENSE AI &

  4. Slide 4: Powering Tomorrow's Technology

    BERYLLIUM The global beryllium market is forecasted to grow at a CAGR of 4.78%* POWERING TOMORROW’S $300 $261.1 TECHNOLOGY $250 $227.0 $237.8 $249.2 $216.6 $206.7 The global beryllium market is experiencing steady $188.3 $197.3 $200 $179.7 growth and is projected to continue expanding $171.5 through

  5. Slide 5: Our Projects

    BERYLLIUM OUR PROJECTS Rockland Resources is advancing critical metals exploration in North America, specializing in beryllium at its strategically located Beryllium Butte and Claybank projects in the Spor Mountain region of Utah, USA. Spor Mountain is home to Materion’s (NYSE: MTRN) Spor Mountain M

  6. Slide 6: Spor Mountain Mine

    BERYLLIUM SPOR MOUNTAIN MINE* The Spor Mountain Mine in Utah is the largest beryllium producer in the world. The deposit has been mined since 1969 and is one of only three major beryllium deposits in the world that are economically viable. Beryllium mined from the Materion’s open-pit operations occu

  7. Slide 7: Project Overview – Beryllium Butte

    BERYLLIUM BUTTE PROJECT OVERVIEW Rockland’s permitted, drill-ready Beryllium Butte project is located in Juab County, Utah, 185 km south-west of Salt Lake City. The project is prospective for beryllium mineralization and located only 30km west of Materion Corp.’s currently producing Spor Mountain Mi

  8. Slide 8: Saddle Zone Target

    BERYLLIUM BUTTE SADDLE ZONE TARGET The Saddle Zone Target is interpreted to have strong similarities with the Miocene Spor Mountain Formation that hosts beryllium deposits currently in production at the Spor Mountain Mine. An initial grab sampling program returned significant beryllium concentration

  9. Slide 9: Additional Target Elements: Gallium & Rubidium, Lithium

    ADDITIONAL TARGET ELEMENTS GALLIUM & RUBIDIUM LITHIUM Rockland reviewed 133 samples that included The property hosts claystone volcanic tuff analysis for gallium (Ga) and rubidium (Rb). breccia units interpreted to be highly This analysis found: prospective for lithium (Li), beryllium (Be) and ▪ Pea

  10. Slide 10: Beryllium Butte Project Timeline

    BERYLLIUM BUTTE PROJECT TIMELINE Channel Sampling Resource Estimation Follow-up sampling returned Data compilation from all previous continuous chip samples over 25.5m programs would be used to begin averaging 1,142 ppm Be, with a definition of the mineral resource higher-grade portion returning 2,4

  11. Slide 11: Project Overview – Claybank

    CLAYBANK PROJECT OVERVIEW The Claybank Beryllium Project consists of two unpatented claims with a contiguous area of roughly 16 hectares (40 acres). The project connects via a 4.5km road to the paved Brush Highway that is used to ship ore from Spor Mountain’s mining operations to their treatment pla

  12. Slide 12: Claybank Property History

    CLAYBANK PROPERTY HISTORY The property saw historical drilling in 1987 with 31 vertical drill holes distributed along strike of an altered Tertiary tuff, the host rock for bertrandite ore being mined at Spor Mountain. Nineteen of the drillholes were closely-spaced and identified a zone of beryllium

  13. Slide 13: Claybank Project Timeline

    CLAYBANK PROJECT TIMELINE Maiden Drilling Proposed drilling would focus on historical drilling and targets generated by the preceding surface sampling and mapping program. PROJECT ACQUISITION Grab Sampling Resource Estimation A reconnaissance surface sampling Data compilation from all previous and m

  14. Slide 14: Management & Directors

    MANAGEMENT & DIRECTORS MIKE ENGLAND WILL RASCAN CEO & DIRECTOR PRESIDENT & DIRECTOR ▪ Involved in the public markets for over 40 years in various roles ▪ 30 years’ experience in the investment brokerage / capital markets industry ▪ Served in many upper management roles for numerous companies ▪ Durin

  15. Slide 15: Technical Advisors

    TECHNICAL ADVISORS ROBERT WEICKER ▪ Over 30 years’ experience in the mineral exploration and mining industries ▪ Has worked for both major and junior mining companies in various aspects CHRIS DORN ▪ Involved in the development of the largest gold mine in Canada ▪ MIT graduate and veteran of 4 years

  16. Slide 16: Capitalization

    CAPITALIZATION SHARES OUTSTANDING WARRANTS OPTIONS 27,229,558 9,155,000 2,480,000 OPTIONS EXPIRY AMOUNT PRICE WARRANTS Aug 4, 2025 40,000 $1.00 EXPIRY AMOUNT PRICE Oct 4, 2025 110,000 $0.60 Apr 27, 2025 1,044,000 $1.00 Aug 10, 2026 400,000 $0.35 Mar 21, 2026 450,000 $0.25 Oct 17, 2026 40,000 $0.35 J

  17. Slide 17: Disclaimer

    DISCLAIMER This presentation is strictly confidential and any disclosure, use, copying and circulation of The information contained herein has been prepared to assist the recipients in making their this presentation is prohibited without the consent of Rockland Resources Ltd. (“The own evaluation on