Eldorado Gold Corporation · TSX:ELD
Eldorado Gold — Investor Presentation (January 2014)
40 slides from Eldorado Gold's investor presentation, January 2014
Slide 1: Delivering through Discipline
Delivering through Discipline Investor Presentation January 2014 Kişladağ Gold Mine, Turkey
Slide 2: Forward Looking Statement
Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities law. Thes
Slide 3: Operating on Solid Foundations
Operating on Solid Foundations Where we are today ~720,000 ounce gold producer with 20 years of international operating experience Track record of Leading low cost Experienced value creation Solid reserve and Transparent operator with solid management through resource base – dividend policy margins
Slide 4: Our Assets
Our Assets Diversified, well-balanced global portfolio www.eldoradogold.com 4
Slide 5: 2013 Operating Highlights
2013 Operating Highlights Record production at low cash costs 10% production growth over 2012 Mines delivered to initial production guidance and below cost guidance 705,000 oz 760,000 oz Gold Production (oz) Actual 721,200 oz $515/oz $530/oz Actual $494/oz Cash Operating Cost ($/oz) Beg. Year Gu
Slide 6: 2013 Q4 Financial Position
2013 Q4 Financial Position Significant cash, liquidity and financial flexibility Financial Position USD (at Dec 31, 2013)* (millions) Cash equivalents and term deposits $623 Undrawn Credit Facility Total debt $601 $375 Undrawn credit facility $375 *Unaudited figures $998 million liquidity Long-Term
Slide 7: Navigating Current Gold Price Weakness
Navigating Current Gold Price Weakness Protecting the balance sheet 2013 34% reduction in capital expenditure $ 230.0 million 32% reduction in exploration expenditure $ 31.5 million 14% reduction in G&A costs $ 11.0 million Positive net impact on cash flow ~$ 272.5 million 2014 Slowing of capital
Slide 8: 2014 Guidance: Increasing production at consistently low costs
2014 Guidance Increasing production at consistently low costs Low High Global Gold Production Gold Production Kisladag oz 300,000 - 335,000 OLY Efemcukuru oz 90,000 - 100,000 WM 4% Tanjianshan oz 95,000 - 100,000 9% White Mountain oz 70,000 - 75,000 TJS KIS Jinfeng oz 145,000 - 155,000 13% 730-800 4
Slide 9: 2014 Guidance: Prudent capital allocation
2014 Guidance Prudent capital allocation Sustaining Capital (1) Development Capital (1) Exploration Spending (2) KIS 22% 41% 12% SKO OLY EFM 62% 18% 12% $170M $345M 9% $45M 30% PH TJS 7% JF 12% 13% 20% CTJ WM 10% 14% 15% TZ 3% Turkey China Greece Romania Brazil Other (1) Capital expenditure guidance
Slide 10: Key Deliverables in 2014
Key Deliverables in 2014 Focusing on delivery Corporate Greece Announce resources and reserves Continue development at Olympias and update Skouries Closure of Glory Resources transaction Receive approval of Perama Hill EIA Meet production and cash cost guidance Turkey Romania Receive app
Slide 11: Consistent Strategy
Consistent Strategy Delivering through discipline 1. Disciplined approach to operations, capital allocation and development projects 2. Focus on operational excellence – value creation through operating efficiencies and cost reductions 3. Continue to strengthen safety culture and environmental manag
Slide 12: Among the Lowest Cost Mines Globally
Among the Lowest Cost Mines Globally Provide a solid foundation ELD’s average cost was $483/oz in 2012 vs industry average of $705/oz ~60% of production was below $500/oz 2012 Gold Industry Cost Curve $3,500 $3,000 Industry Avg Eldorado Avg 2012 Operating Cash Costs ($/oz) $2,500 White Mountain
Slide 13: Strong Profit Margins
Strong Profit Margins Reflects asset quality and cost management Solid Margins per Ounce Strong Gross Profit Margins* vs Peer Group** 1,800 70.0% 1,600 65.0% 1,400 60.0% 1,200 Gross Profit Margin (%) 55.0% 1,000 $/oz 800 50.0% 600 45.0% 400 40.0% 200 0 35.0% 2009 2010 2011 2012 2013 Q1 Q2 Q3 Q4 Q1 Q
Slide 14: All-In Sustaining Cash Costs
All-In Sustaining Cash Costs Lowest among peer group 2013E All-In Sustaining Cash Costs ($/oz) 1,300 1,200 1,100 1,000 900 800 ($/oz) 700 600 500 400 300 200 100 - Agnico-Eagle Newmont Kinross IAMGOLD Barrick Goldcorp Yamana Eldorado Operating Sustaining Exploration G&A Other Source: TD Securities w
Slide 15: Growing Potential of Chalkidiki Mining District
Growing Potential of Chalkidiki Mining District ~20 million oz (AuEq) defined in a 10km radius Area has: x1 operating mine x2 development projects x3 exploration targets Excellent infrastructure (roads, power, port access) Experienced local miners Government support Area holds M&I re
Slide 16: Construction Advancing at Skouries
Construction Advancing at Skouries Project milestones 2013 Received installation permit Began plant construction and underground development (UG) Experienced project management team; > 400 employees & contractors in place 2014 Continue plant construction and UG development Begin cons
Slide 17: Progress at Olympias
Progress at Olympias Project milestones 2013 Completed 1.4km of the 8km Stratoni-Olympias tunnel Completed >3km of underground development and >1km of underground rehabilitation 10% increase in M&I gold resources to 4.7m oz at 8.10 g/t 2014 Declare commercial production from tailings r
Slide 18: Rehabilitation of Olympias Valley
Rehabilitation of Olympias Valley Returning 26.5 hectares of land to a natural state Currently cleaning up over 2.4 million tonnes of tailings from previous mining activities Rehabilitated land will be equivalent to an area of more than 35 soccer pitches Working with the Forestry and Natural E
Slide 19: Progress at Certej
Progress at Certej Project milestones 2013 First phase of construction of alternate access road completed Geotechnical work for pit design and process plant foundations conducted Ongoing metallurgical testwork 46,000m of exploration drilling completed and 13% increase in M&I gold res
Slide 20: Potential of the Golden Quadrilateral Area
Potential of the Golden Quadrilateral Area Certej blue-sky potential Includes Certej project and 3 strategic exploration positions High gold endowment in a small district (40x40km2); ranks 3rd for gold districts worldwide Part of under-explored, prolific Western Tethyan Belt Limited modern e
Slide 21: Extending Mine Life at Tanjianshan
Extending Mine Life at Tanjianshan Promising 2013 drilling results and future potential Over 21,000m of exploration drilling completed at the Jinlonggou (JLG) pit and areas peripheral to the Qinlongtan (QLT) pit 2 new high-grade zones discovered at the JLG Bridge Zone and West Wall targets and n
Slide 22: Expanding Resources at Tanjianshan
Expanding Resources at Tanjianshan Promising 2013 drilling results and future potential www.eldoradogold.com 22
Slide 23: Why Invest in Eldorado?
Why Invest in Eldorado? Our competitive strengths 1. Diversified, well-balanced portfolio Flexible development options from 6 Disciplined projects Approach Rigorous budgeting and forecasting procedures 2. $623M in Cash and Term Deposits $375M in available credit facility Balance Sheet ~9
Slide 24: Background Information
Background Information White Mountain Gold Mine, China
Slide 25: Proven Track Record
Proven Track Record Significant Growth at Low Costs Increasing Reserves & Resources 60 40,000 35,000 50 Oz / 1,000 Shares 30,000 Thousand Ounces Over the past 5 years we have: 40 25,000 30 20,000 15,000 Doubled production 20 10,000 10 5,000 Materially increased reserves 0 0 and resources per sha
Slide 26: Kisladag Gold Mine - Turkey
Kisladag Gold Mine - Turkey Our Flagship Asset Overview Location Usak Province, Western Turkey Deposit Gold porphyry Ownership 100% Eldorado Open pit Type Heap leach Expected Life of Mine* 20 years (LOM) Recovery 65% Strip Ratio 2014 1.36:1 Reserves and Resources (at Dec 31, 2012) Overview 2P Reserv
Slide 27: Efemcukuru Gold Mine - Turkey
Efemcukuru Gold Mine - Turkey PRODUCTION Overview Location Izmir Province, Western Turkey Deposit High grade, epithermal gold vein Ownership 100% Eldorado Underground Type Flotation and carbon in leach Expected Life of Mine* 11 years (LOM) Recovery 87% Reserves and Resources (at Dec 31, 2012) Overvi
Slide 28: Jinfeng Gold Mine - China
Jinfeng Gold Mine - China PRODUCTION Overview Location Guizhou Province, China Deposit Carlin type Ownership 82% Eldorado Open pit and underground Type Biox and carbon in leach Expected Life of Mine* 13 years (LOM) Recovery 85% Overview Reserves and Resources (at Dec 31, 2012) Acquired by Eldorado
Slide 29: Tanjianshan Gold Mine - China
Tanjianshan Gold Mine - China PRODUCTION Overview Location Qinghai Province, China Deposit Orogenic Ownership 90% Eldorado Open pit Type Float roast carbon in leach Expected Life of Mine (LOM)* 5 years Recovery 81% Strip Ratio (JLG open pit) 1.39:1 Overview Acquired by Eldorado from Afcan Mining i
Slide 30: White Mountain Gold Mine - China
White Mountain Gold Mine - China PRODUCTION Overview Location Jilin Province, China Deposit Orogenic Ownership 95% Eldorado Underground Type Carbon in leach Expected Life of Mine (LOM)* 7 years Recovery 80% Overview Reserves and Resources (at Dec 31, 2012) Acquired by Eldorado from Sino Gold in 20
Slide 31: Vila Nova Iron Ore Mine - Brazil
Vila Nova Iron Ore Mine - Brazil PRODUCTION Overview Location Amapa State, Brazil Ownership 100% Eldorado Type Open pit Expected Life of Mine (LOM)* 11 years Reserves and Resources (at Dec 31, 2012) Overview 2P Reserves 9.7 Mt @ 58.8% Fe Commercial production began in 2011 M+I Resources 14.5 Mt @
Slide 32: Stratoni Silver, Lead, Zinc Mine - Greece
Stratoni Silver, Lead, Zinc Mine - Greece PRODUCTION Overview Chalkidiki Peninsula, Northern Location Greece Deposit Replaced mixed sulphide Ownership 95% Eldorado Underground drift and fill Type Multi-stage flotation Expected Life of Mine (LOM)* 5 years Reserves and Resources (at Dec 31, 2012) 5.3
Slide 33: Olympias Gold, Silver, Lead, Zinc Mine - Greece
Olympias Gold, Silver, Lead, Zinc Mine - Greece PRODUCTION**/CONSTRUCTION Overview Location Chalkidiki Peninsula, Northern Greece Deposit Replacement mixed sulfide Ownership 95% Eldorado Underground Type (previously mined using drift and fill) Flotation Expected Life of Mine 20 years (LOM)* Commerci
Slide 34: Skouries Gold, Copper Project - Greece
Skouries Gold, Copper Project - Greece CONSTRUCTION Overview Chalkidiki Peninsula, Northern Location Greece Deposit Gold-copper porphyry Ownership 95% Eldorado Open pit then underground Type Flotation and gravity circuit Expected Life of Mine 27 years (LOM)* Strip Ratio (open pit) 0.7:1 Production E
Slide 35: Perama Hill Gold, Silver Project - Greece
Perama Hill Gold, Silver Project - Greece DEVELOPMENT Overview Eastern Thrace, Northern Location Greece Epithermal gold-silver vein Deposit deposit Ownership 100% Eldorado Open pit Type Conventional carbon in leach Expected Life of Mine (LOM)* 9 years 90% gold Expected Recovery 60% silver Strip Rati
Slide 36: Certej Gold, Silver Project - Romania
Certej Gold, Silver Project - Romania DEVELOPMENT Overview ‘Golden Quadrilateral’ area Apuseni Location Mountains, Western Romania Deposit Epithermal gold-silver deposit Ownership 80% Eldorado Open pit Type (previously mined via shallow open pit) Expected Life of Mine * (LOM) Production Expected 201
Slide 37: Tocantinzinho Gold Project - Brazil
Tocantinzinho Gold Project - Brazil DEVELOPMENT Overview Tapajos District, Para State, Location Brazil Shallow, intrusion-hosted, Deposit non refractory gold deposit Ownership 100% Eldorado Type Open pit Expected Life of Mine (LOM)* 13 years Reserves and Resources (at Dec 31, 2012) Overview Prelim
Slide 38: Eastern Dragon Gold, Silver Project - China
Eastern Dragon Gold, Silver Project - China DEVELOPMENT Overview Location Heilongjiang Province, China High-grade, epithermal gold- Deposit silver vein Ownership 95% Eldorado Open pit and underground Type Carbon in leach plant under construction Expected Life of Mine (LOM)* 11 years Expected Recover
Slide 39: Gold Resources and Reserves
Gold Resources and Reserves At December 31, 2012 Total Proven and Probable Total Measured and Indicated Inferred Resources Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) Certej (See Note 5) 106,700 1.27 4,380 24,
Slide 40: Thank You
Thank You TSX: ELD NYSE: EGO Investor Relations: Nancy Woo, VP IR Total shares outstanding: 716.2M* 604 601 6650 nancyw@eldoradogold.com www.eldoradogold.com *At Dec 31, 2013