Mkango Resources Ltd. · TSXV:MKA

Mkango Resources — Investor Presentation (May 2018)

38 slides from Mkango Resources's investor presentation, May 2018

  1. Slide 1: Company Presentation May 2018

    AIM/TSX-V: MKA Company Presentation May 2018 Raw Materials and Technology for the CleanTech Revolution

  2. Slide 2: Disclaimer

    Disclaimer This presentation (the “Presentation”) has been prepared by Mkango Resources Ltd (the “Company” or “Mkango”) solely for its use at informational meetings relating to it or is being delivered for information purposes only to a limited number of persons. By attending the meeting where this

  3. Slide 3: Disclaimer

    Disclaimer Group (Pty) Ltd., who is a “Qualified Person” in accordance with NI 43-101 and which was filed at www.sedar.com on December 1st 2015. All of the Qualified Persons referred to above are independent of the Company. Certain disclosures contained in or incorporated by reference into this pres

  4. Slide 4: Rare Earths Geared to EV Growth

    Rare Earths Geared to EV Growth  Neodymium - key component of rare earth permanent magnet motors for electric vehicles  Accelerating EV demand will lead to an increasing neodymium supply-demand deficit  Mkango’s Songwe Hill rare earths project perfectly timed for the inevitable crunch point “Tesl

  5. Slide 5: Benefits - Rare Earth PM Motors for EVs

    Benefits - Rare Earth PM Motors for EVs Bill of Materials for Comparable Rare Earth Permanent Magnet (PM) and Induction Motors Source: Adamas Intelligence – Spotlight on Dysprosium (2018)  Increasing the capacity of a 60-kWh battery by a conservative 5% to compensate for use of an induction motor,

  6. Slide 6: Critical for the Low Carbon Economy

    Critical for the Low Carbon Economy  EU report (JRC) indicates vulnerability to supply bottlenecks for certain rare earths:  Neodymium  Praseodymium  Dysprosium Source: European Commission JRC report 2016 - Assessment of potential bottlenecks along the materials supply chain for the future deplo

  7. Slide 7: A Unique Investment Opportunity

    A Unique Investment Opportunity  Advanced stage rare earth project – PFS completed in 2015 (NPV US$345m)  Feasibility Study underway – major drilling programme imminent  Strategic partner in place – Talaxis: funding and marketing  Strong financial position – initial £6m received Jan 2018  Pathw

  8. Slide 8: Company Overview

    Company Overview AIM / TSXV: MKA 75.5% 80% Talaxis holds Lancaster Talaxis Maginito Ltd 24.5% of Exploration Ltd holds 20% Maginito (£1m invested to of Lancaster (£5m invested to date by Talaxis) date by Talaxis) Focused on rare earth alloy and Developing the Songwe Hill Rare magnet technologies Ear

  9. Slide 9: Maginito – Downstream Technology

    Maginito – Downstream Technology  New Mkango subsidiary established in January 2018 to pursue downstream opportunities in the rare earths supply chain  Main focus on neodymium alloys, magnet and other technologies geared to accelerating growth in the electric vehicle market  Maginito’s first oppo

  10. Slide 10: Funding - Landmark Talaxis Transaction

    Funding - Landmark Talaxis Transaction  Talaxis Limited is a Noble Group subsidiary focused on resources which are critical to green technology supply chains  Talaxis to invest £12 million into Lancaster in two tranches, fully funding the BFS for Songwe, in return for a 49% interest  First £5 mil

  11. Slide 11: Corporate Snapshot

    Corporate Snapshot Capital Structure AIM: MKA Share Price (02/05): £0.085 / C$0.125 6 month Share Price Shares Outstanding: ~108.7M Warrants: 21.6M @ £0.066 12.0M1 @ £0.066 7.6M @ C$0.60 7.3M @ C$0.15 0.7M @ £0.035 Options: 7.0M @ C$0.06 2.8M @ C$0.07 Fully Diluted: ~168.9M Market Cap (02/05): ~£9.2

  12. Slide 12: A Team with Proven Expertise

    A Team with Proven Expertise Technically led team with 12 year track record in Malawi, last 8 years focused on rare earths Strong commitment to the project – same team leading development since project inception Mr William Dawes, Chief Executive Officer & Co-founder BSc Geology, MSc Mineral Explorat

  13. Slide 13: Songwe Hill Rare Earths Project

    Songwe Hill Rare Earths Project

  14. Slide 14: Malawi – Low Risk Jurisdiction

    Malawi – Low Risk Jurisdiction  World class, undeveloped rare earth mineral province  New rail corridor unlocking mineral development  Politically stable democracy  Supportive Government Songwe Hill Uniquely positioned in a rare earths mineral province of global significance 14 Mkango: Raw Mater

  15. Slide 15: Road, Rail and Power Developments

    Road, Rail and Power Developments Infrastructure is key for value added rare earths development Mkango: Raw Materials and Technology for the CleanTech Revolution • Corporate Presentation • Q2 2018 15

  16. Slide 16: Songwe Hill Rare Earth Deposit

    Songwe Hill Rare Earth Deposit  Carbonatite hosted rare earth mineralisation  Long mine life of 18 years, with resource upside  Simple open pit mining operation  Broad mineralised zones as opposed to dykes, veins  Potential to expand production above PFS base case 2012 Mineral Resource Estimate

  17. Slide 17: 2015 Pre-feasibility Study

    2015 Pre-feasibility Study  NPV US$345m and IRR 37%  Development CAPEX of US$216m amongst the lowest in the sector for comparable operations 1 A large proportion of the cerium will be selectively removed during the hydrometallurgical process  Production of circa 2,841tpy 2 Average annual at full

  18. Slide 18: Initial Phases of BFS Underway

    Initial Phases of BFS Underway  Metallurgical optimisation  Leading consultants and laboratories engaged in Australia and Canada  Work programme being scaled up following receipt of Talaxis investment  Focused on flotation, hydrometallurgy and acid regeneration  Environmental, Social and Health

  19. Slide 19: Drill Programme >5,000 metres

    Drill Programme >5,000 metres Target 3 - potential extension of mineralisation under cover Main target - Infill Target 2 - Extension drilling of existing of radiometric Mineral Resource anomaly Estimate - Thorium / potassium radiometrics draped on LIDAR topography for Songwe Hill - Radiometric anoma

  20. Slide 20: MKA Exploration

    MKA Exploration

  21. Slide 21: Nkalonje - Rare Earths

    Nkalonje - Rare Earths Songwe Nkalonje  Located in the same licence area as Songwe, approximately 15km to north west  Similar to Songwe, the Nkalonje vent is a steep hill co-incident with distinct radiometric anomaly  Rare earth bearing carbonatite dykes at surface suggest potential for underlyin

  22. Slide 22: Thambani - Uranium, Tantalum, Niobium

    Thambani - Uranium, Tantalum, Niobium Mkango: Raw Materials and Technology for the CleanTech Revolution • Corporate Presentation • Q2 2018 22

  23. Slide 23: Thambani - High Grade Mineralisation

    Thambani - High Grade Mineralisation  Thambani uranium mineralisation is hosted in: Assays from the 20 highest grade U3O8 samples from the May 2017 Thambani sampling programme Sample no. U3O8 % Ta2O5 % Nb2O5 % a) main Thambani Massif syenite U3141 3.26 1.90 5.92 gneiss body (widely disseminated) U3

  24. Slide 24: Chimimbe – Nickel, Cobalt, Chrome

    Chimimbe – Nickel, Cobalt, Chrome  Licence granted in November 2017 - features laterite and saprolite hosted nickel, cobalt, chrome and other mineralisation  Significant historical exploration has been completed, including pitting, drilling, resource estimation and metallurgical test work  Magnet

  25. Slide 25: Next Steps

    Next Steps

  26. Slide 26: Next Steps and News Flow

    Next Steps and News Flow  Major diamond drilling programme commencing at Songwe within the next month  Culminating in resource update, targeted by end 2018  Resource update and signature of definitive agreements trigger further £7m Talaxis investment  Completion of feasibility study targeted by

  27. Slide 27: www.mkango.ca @MkangoResources Mkango Resources Ltd

    www.mkango.ca @MkangoResources Mkango Resources Ltd +44 (0)207 3722 744 William Dawes (CEO) will@mkango.ca Alex Lemon (President) alex@mkango.ca SP Angel +44 (0)20 3470 0470 Jeff Keating Caroline Rowe Alternative Resource Capital +44 (0)20 7186 9004 Alex Wood +44 (0)20 7186 9001 Rob Collins Blythewe

  28. Slide 28: Corporate Social Responsibility

    Corporate Social Responsibility

  29. Slide 29: CSR Initiatives

    CSR Initiatives boNGO Worldwide partnership  Happy Classrooms project  Enhancing 3 local primary schools  24 classrooms painted Annual Scholarship programme  Pays Secondary Education Fees for the top 6 Before - An unhappy classroom After - A happy classroom after renovation & painting syllabus o

  30. Slide 30: Flood Response

    Flood Response 30 Mkango: Raw Materials and Technology for the CleanTech Revolution • Corporate Presentation • Q2 2018 30

  31. Slide 31: Pigeon Pea Programme

    Pigeon Pea Programme Mkango: Raw Materials and Technology for the CleanTech Revolution • Corporate Presentation • Q2 2018 31

  32. Slide 32: Appendix

    Appendix

  33. Slide 33: Attractive Product Mix, Enriched in NdPr

    Attractive Product Mix, Enriched in NdPr Rare earth oxide REO in conc1 REO in conc tonnes split Lanthanum La2O3 1,075 37.8% Cerium CeO2 341 12.0% Praseodymium Pr6O11 227 8.0% Neodymium Nd2O3 756 26.6% Samarium Sm2O3 114 4.0% Europium Eu2O3 27 0.9% Gadolinium Gd2O3 62 2.2% Terbium Tb4O7 7 0.3% Dyspro

  34. Slide 34: Value Geared to Magnet Rare Earths

    Value Geared to Magnet Rare Earths More than 80% of value geared to NdPr and other “Magnet” Rare Earths used in Electric Vehicles, Wind Turbines, HiTech REO in concentrate split by value Yttrium Lanthanum Gadolinium Cerium Europium 2% 5% 2% 1% 8% Terbium 3% Neodymium Dysprosium 53% 12% Praseodymium

  35. Slide 35: Mineral Reserves and Resources

    Mineral Reserves and Resources 2015 Pre-Feasibility Study based on 8.5mt Reserve  Conservative Mineral Reserve cut–off grade versus pay limit (0.51% TREO)  Mineral Reserve based on Indicated Resource only TREO – total rare earth oxides. Mineral Resources which are not Mineral Reserves do not have

  36. Slide 36: Mineral Resource Estimates

    Mineral Resource Estimates In-situ Mineral Resource estimates at 1.0% TREO cut–off grade1 In-situ Indicated Mineral Resource at 1% TREO Cut-Off Indicated Million La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 LREO Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 HREO TREO TREO Th U Tonnes ppm ppm ppm ppm p

  37. Slide 37: Mineral Resource Estimates

    Mineral Resource Estimates In-situ Mineral Resource estimates at different cut–off grades1 In-situ Indicated Carbonatite Mineral Resource Cut-Off Million La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 LREO Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 HREO TREO TREO Th U %TREO Tonnes ppm ppm ppm ppm ppm

  38. Slide 38: Mineral Resource Estimates

    Mineral Resource Estimates REO distribution at different cut-off grades1 In-situ Indicated Carbonatite Mineral Resource - REO Distributions at 0.5%, 1.0% and 1.5% TREO Cut-Offs Cut-Off La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 Total HREO %TREO % % % % %

Mkango Resources — Investor Presentation (May 2018) on 6ix