Bellevue Gold Limited · ASX:BGL

Bellevue Gold — Colorado Gold Conferences 2024

32 slides from Bellevue Gold's conference presentation, Sep 10, 2024

  1. Slide 1: Colorado Gold Conferences 2024

    For personal use only Colorado Gold Conferences 2024 Real growth from a high-grade WA asset 10 September 2024

  2. Slide 2: Disclaimers & Compliance Statements

    Disclaimers & Compliance Statements This presentation has been prepared by Bellevue Gold Limited (ABN 99 110 439 686) (Company or Bellevue) (ASX: BGL) and is authorised by the Managing Director & Chief Executive Officer of Bellevue. DISCLAIMER This presentation has been prepared by the Company based

  3. Slide 3: Disclaimers & Compliance Statements (cont)

    Disclaimers & Compliance Statements (cont) Forward-looking All-In-Sustaining Cost estimates have been prepared on a real basis at a project level (i.e. not adjusted for possible future inflation and do not include the effects of corporate costs) and assume an FY25 gold price of A$3,500/oz of gold, d

  4. Slide 4: Disclaimers & Compliance Statements (cont)

    Disclaimers & Compliance Statements (cont) Information in this presentation that relates to Exploration Targets is based on and fairly represents information and suppor ting documentation compiled by Mr Sam Brooks. Mr Brooks is a Competent Person who is a full-time employee of and holds securities i

  5. Slide 5: Strong execution to date… strategy underway to accelerate growth

    Strong execution to date… strategy underway to accelerate growth Following the successful delivery of the Bellevue Gold Project, the focus is now on growth and margin expansion – Bellevue’s accelerated 5 Year Growth Plan to deliver low risk expansion to 250koz1 pa by FY28 Successful project delivery

  6. Slide 6: Profitability combined with a derisked balance sheet

    Profitability combined with a derisked balance sheet FY24 NPAT of $75m and June 2024 quarter free cash flow of $41m highlights cash generating potential Recent capital raising has de-geared balance sheet and created a platform for self-funding growth De-gearing facilitates self-funding of 5yr growth

  7. Slide 7: Production Growth of +45% by FY28 in a Tier 1 mining district

    Production Growth of +45% by FY28 in a Tier 1 mining district Production is set to grow at a 13% CAGR to FY283 Bellevue to become the only pureplay 200koz2 pa+ gold producer with >5g/t gold head grade in Tier 1 jurisdiction Tier 1 gold deposits with >200koz production & 5g/t Au head grade1,2 Bellevu

  8. Slide 8: Successful project delivery

    Successful project delivery Commercial production achieved in May 2024 with H2 FY24 production of 80,043 ounces in line with guidance, delivering free cash flow of A$41m in the June 2024 Qtr June 2024 quarterly highlights H2 FY24 gold production of 80,043 ounces – guidance achieved For personal use

  9. Slide 9: Investment in infill grade control drilling

    Investment in infill grade control drilling A$23 million investment in infill drilling over past 24 months, excellent resource to mining reconciliation Delivers a robust high-grade and high confidence Reserve For personal use only Marceline Paris Portal MiningArea 1.8m @ 123.3 g/t gold 1.9m @ 85.1 g

  10. Slide 10: Increasing ore headings to drive production growth

    Increasing ore headings to drive production growth Deacon Main 1058 200 Bellevue 1095 200 Five independent mining areas in ore development during Q1 FY25 with multiple development levels For personal use only 129.0g/t  Growth investment in FY25 opens two 110.2g/t 35.0g/t 10.4g/t 0.2g/t additional d

  11. Slide 11: Stoping ramping up; excellent performance to date

    Stoping ramping up; excellent performance to date  Stoping ramp up continues with increased active stoping areas and development levels For personal use only  Cavity monitoring of voids to date highlight favourable stoping conditions o Minimum widths achieved o Target dilution achieving better tha

  12. Slide 12: Infrastructure unlocks productivity in FY25

    Infrastructure unlocks productivity in FY25 Life of mine infrastructure ready Q1 FY25 – production to rise H2 FY25 FY24 Development & Infrastructure Mine Infrastructure Upgrades  Significant investment in mine development – Upper Armand, Lower Critical ventilation, pumping and electrical infrastruc

  13. Slide 13: Simple growth in process capacity to 1.6Mtpa

    Simple growth in process capacity to Currently operating at 1Mtpa – 1.2Mtpa 1.6Mtpa  Stage 1 expansion to 1.35Mtpa (A$12 million, FY25) – gravity screen upgrade and additional gravity concentrator, For personal use only thickener modifications Stage 2 – Stage 1 - Gravity Upgrade Extra Ball Mill Sta

  14. Slide 14: Vrify 3D presentation – play here

    Vrify 3D presentation – play here For personal use only 14 https://vrify.com/decks/16463

  15. Slide 15: 5 Year Growth Plan to +250koz pa and lower costs

    5 Year Growth Plan to +250koz1 pa and lower costs Multi-year Production & Cost Guidance FY25 Guidance and Growth 260 2,000 FY25 to deliver production of 165,000-180,000 ounces at a project AISC of A$1,750 - A$1,850 per ounce 240 1,900 For personal use only  Focus on UG mine expansion; Tribune UG es

  16. Slide 16: Growth in annual mining rate to 1.6Mtpa by FY27

    Growth in annual mining rate to 1.6Mtpa by FY27 6g/t high-grade core the key focus of mining – additional material accessed from same infrastructure 5 mining areas increasing to 7 Underground Mining Tonnes per annum For personal use only High grade Medium grade Low grade 2,000,000 8.0 1,800,000 7.0

  17. Slide 17: Investing now for the future

    Investing now for the future Benefits of investing in life of mine infrastructure in FY25/26  Investment across FY25-FY26 will create life of mine platform to be a +250koz1 pa producer  Drives a cost benefit from increased economies of scale and a decrease in AISC of A$250/oz from FY25 to FY29 For

  18. Slide 18: 3.2Moz Resource – targeting significant growth potential

    3.2Moz Resource – targeting significant growth potential  FY25-FY26; decline development opens up a major ~1.5-2.5Moz at 8-10 g/t gold Exploration Target1 to the south covering down plunge extent of ore system  Current MRE 3.2Moz covers 2.8km of strike2 - new drill platforms covering an extra ~50%

  19. Slide 19: System remains OPEN for repeat discovery

    System remains OPEN for repeat discovery Bellevue System remains open at depth Shear 1.4Moz For personal use only  Parallel structure at depth in deep EIS funded drilling Deacon Shear  1.6m @ 9.3 g/t gold and 1.2m @ 9.0 g/t gold structure at depth 1.5Moz  Viago analogue targets at Lucien remain r

  20. Slide 20: Exploiting the competitive exploration advantage

    Exploiting the competitive exploration advantage  Conductive mineralisation drives more efficient discovery and target appraisal  Several areas highlight the potential for future Resource growth with further drilling outside of known Resource areas For personal use only STRONG DHEM CONDUCTOR Tribu

  21. Slide 21: Deacon Main – Infill drilling defining exceptional grade

    Deacon Main –Infill drilling defining exceptional grade  New ‘high-grade shoot ’ identified along 1.5Moz Deacon lode through underground grade 7 control close spaced drilling  Now defined over 260m down plunge, exceptional grade and continuity shoot is an important contributor to FY25 schedule Dea

  22. Slide 22: Deacon high-grade shoot – Multiple repeat shoots to drive mine plan

    Deacon high-grade shoot – Multiple repeat shoots to drive mine plan  Association with massive to semi massive pyrrhotite, analogous intersections identified in broad drilling  Potential for a further six high-grade shoots identified along Deacon Main for high priority infill drilling  Require clo

  23. Slide 23: Bellevue South – Key FY25 Mining area

    Bellevue South –Key FY25 Mining area  Offset continuation of the Bellevue Lode to the South  High-grade ore shoot in FY25 schedule recent grade control shows robust and wide orebody  OPEN to south with drill platform to be established for extensional drilling For personal use only North Current d

  24. Slide 24: For personal use only

    4.4m @ 62.4 g/t(DRDD218) Deacon Main 14.7g/t 98.7g/t Deacon Main- Multiple shoot is analogous shoots 129.8g/t 104.3g/t across lode 90.4g/t “Bellevue 4.4m @ 64.4 g/t 76.7g/t 21.4g/t 4.3m @ 55.2 g/t style” For personal use only 1.5m @ 168.8 g/t 33.4g/t 4.9g/t 4.3m @ 55.2 g/t (DRDD106W1) Viago/Bellevue

  25. Slide 25: Exploration growth drilling underway

    Exploration growth drilling underway FY2025 A$30 million budget for exploration targeting Reserve growth beyond current 1.51Moz  Geology ‘Growth’ team established and operational - restart of exploration after >2 year pause for mine construction  4th underground diamond drill rig commenced drillin

  26. Slide 26: Exploration to underpin Resource growth

    BGL Exploration to underpin Resource growth Project continues to grow – following successful commissioning and ramp up exploration spend to add low-cost ounces to mining inventory +143% Share Price Performance Last 5 years Mineral Resource over time (Moz) 1.5-2.5Moz For personal use only Successful

  27. Slide 27: Geological endowment in a world class gold system

    Geological endowment in a world class gold system For world class underground gold systems, like that of Bellevue, Mineral Resource and Ore Reserve estimates do not reflect the true scale of these Tier-1 assets, whose endowments grow over time from exploration investment Total gold endowment of Arch

  28. Slide 28: Investment Highlights

    Investment Highlights For personal use only Exceptional Production Experienced Fully funded Exploration asset growth management for growth upside Bellevue forecast to 5 Year Growth plan Track-record of Balance sheet Underground be the only delivers production tier-1 gold miners optimised and de- dev

  29. Slide 29: Sustainability is core to Bellevue's vision and purpose

    Sustainability is core to Bellevue’s vision and purpose Partnership with Zenith to deliver up to 80% of green energy supply from solar and wind power Renewable Energy  Construction on track for 90 MW hybrid power station consisting of: 24 MW wind, 27 For personal use only MW solar, 24 MW thermal an

  30. Slide 30: Peer comparison data

    Peer comparison data Production Grade AISC2 Basis of data Source Document koz g/t A$/oz X Peers1 For personal use only Agnew/Lawlers 245 5.7 1,761 CY23A Gold Fields 2023 Annual Financial Report, released on 28 March 2024 Granny Smith 284 5.0 1,610 CY23A Gold Fields 2023 Annual Financial Report, rele

  31. Slide 31: Geological endowment data (1/2) – Archaen Peers

    Geological endowment data (1/2) – Archaen Peers Resources1 Reserves Cumulative Production Total Endowment2 Moz Moz Moz Moz Peers For personal use only Agnew/Lawlers 1.5 0.9 6.3 8.6 Bellevue 1.7 1.5 0.8 4.0 Granny Smith 3.6 2.4 10.8 16.8 Gwalia 5.8 2.4 4.4 12.6 Jundee 4.7 1.3 8.9 14.9 Sunrise Dam 3.9

  32. Slide 32: Geological endowment data (2/2) – Agnew Case Study

    Geological endowment data (2/2) – Agnew Case Study Resources1 Reserves Cumulative Production Total Endowment2 Moz Moz Moz Moz Agnew / Lawlers 2000 3.9 0.9 1.5 6.2 For personal use only 2001 3.9 0.9 1.7 6.5 2002 3.9 0.9 1.8 6.5 2003 3.9 0.9 1.9 6.7 2004 3.9 0.9 2.1 6.9 2005 2.2 0.9 2.3 5.5 2006 3.1 0

Bellevue Gold — Colorado Gold Conferences 2024 on 6ix