Contact Energy Limited · NZX:CEN

Contact Energy — Conference Presentation (2008)

20 slides from Contact Energy's conference presentation, Jul 25, 2008

  1. Slide 1: New Zealand's Geothermal Renaissance

    New Zealand’s Geothermal Renaissance the key to our renewable future 1

  2. Slide 2: Roadmap

    Roadmap • Context – Contact – New Zealand’s place on the geothermal stage • The geothermal renaissance underway – the New Zealand Energy Strategy and climate change – Contact’s geothermal plans • Full steam ahead – Critical success factors – Reclaiming centre stage 2

  3. Slide 3: Snapshot of Contact Energy

    Snapshot of Contact Energy • 635,000 electricity, gas and LPG customers • 28 per cent of NZ’s electricity from 10 power stations • 1,000 staff • 85,000 shareholders • $5.2 billion market cap • Generates 5% of NZ’s electricity from geothermal 3

  4. Slide 4: New Zealand's place on the geothermal stage

    New Zealand’s place on the geothermal stage • NZ was once – and is on the road to once again being – a leader in geothermal • Significant and relatively accessible resources • Maui’s distraction is over • Next 10 years a critical period for geothermal in New Zealand • Contact is committed to leading

  5. Slide 5: Contact's commitment to geothermal

    Contact’s commitment to geothermal • Contact’s number 1 investment priority – Not just new power stations – But also repowering existing plant • Activity over the last 12 months: – Poihipi operated at full capacity (50 MW) – Ohaaki exceeded 60 MW: 7 new production wells, 2 re-injection wells, a numb

  6. Slide 6: Ohaaki exemplifies Contact's focus on geothermal

    Ohaaki exemplifies Contact’s focus on geothermal • Opened in late 80’s • Capacity: 108 MW • Steamfield decline and limited investment • Reduced to 21 MW by 2006 • Extensive drilling program • Now at 60 MW • Very attractive economics 6

  7. Slide 7: Renaissance drivers

    Renaissance drivers • Energy demand continues to increase • Maui • Climate change • Economics Fuel Type Key issues LRMC (c/kWh) Geothermal Base load, very low carbon intensity, 5–6 significant potential remains Wind Good resources, consenting challenges, 8.5 – 10 system volatility will need to be ma

  8. Slide 8: NZES and Emissions Trading

    NZES and Emissions Trading • The NZES sets out the future path for New Zealand’s energy sector – Target of 90% renewables by 2025 – Ambitious but achievable – A moratorium on new thermal power stations (?) • Emissions trading scheme appears durable – Cross party political support – Electricity price

  9. Slide 9: Contact's geothermal expansion plans

    Contact’s geothermal expansion plans • Currently generating at 265 MW • 470 MW of new capacity is in advanced stages of development – 225 MW Te Mihi project: After phasing out Wairakei – a net addition of 60 MW – 225 MW Tauhara project – 20 MW binary project at Centennial Drive using existing consen

  10. Slide 10: The Wairakei – Tauhara System

    The Wairakei – Tauhara System 10

  11. Slide 11: Te Mihi Project

    Te Mihi Project • Consent applications filed in July • Consents expected mid-2008 • 3 x 75 MW • Will use steam from current Wairakei consents • Re-injection will reduces discharges to river • Construction in two stages - first 2 units on line in 2011 11

  12. Slide 12: Tauhara Project

    Tauhara Project • Recent Tauhara appraisal wells have been very encouraging • Consent applications will be filed mid-2008 • 3 x 75 MW • On line in 2012 TH-12 vertical discharge 12 (433 t/hr at a well head pressure of 20.5 barg)

  13. Slide 13: Centennial Drive Project

    Centennial Drive Project • A new project for Contact • 20 MW binary plant • Will utilise existing consents • $75 million of investment • In operation by 2010 Wairakei’s binary plant - similar to that planned for Centennial Drive in 2009 13

  14. Slide 14: Geothermal direct heat

    Geothermal direct heat • Electricity generation is not the only opportunity - major scope for greater application of geothermal direct heat for industry • Contact’s 20 MW direct heat project at Tenon’s Taupo wood processing plant has been an environmental and economic success story • Replaced natura

  15. Slide 15: Full steam ahead?

    Full steam ahead? • The country needs low-carbon, base load and relatively inexpensive energy quickly • New Zealand’s significant geothermal resources are able to meet growth in demand • Companies are prepared to invest • What are the constraints? 15

  16. Slide 16: The RMA, NZES and ETS

    The RMA, NZES and ETS • Reconsenting of the existing Wairakei power station took more than 6 years and cost more than $10 million – If consenting delays now affect new geothermal developments, then new coal or gas plants will be needed to ensure security of supply and New Zealand will not come close

  17. Slide 17: Reclaiming centre stage

    Reclaiming centre stage • Maui clearly impacted NZ’s leadership position on the global geothermal stage • NZ’s geothermal renaissance is clearly underway – And has the potential to put NZ back in front • “After an initial surge, then a quiet period, geothermal energy is again at the forefront of com

  18. Slide 18: Collaboration and capability

    Collaboration and capability • A key question is how do we accomplish this? – Attracting people into the industry – Investment in capability – Advanced geothermal study and research – Supporting the NZ Geothermal Association Geothermal Institute Class of 1993 – Building the NZ Geothermal Institute –

  19. Slide 19: Conclusion

    Conclusion • Geothermal has never been more important to New Zealand’s future • The New Zealand Energy Strategy goals of a secure electricity supply with 90% renewables are highly dependent on significant and rapid develop of New Zealand’s geothermal resources • If consenting processes support this,

  20. Slide 20: contact.

    c contact.