    IMPORTANT INFORMATION The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about and observe such restric

  3. Slide 3: Table of Contents

    Table of Contents • Investment Highlights 4 • Corporate 5 • Projects Overview 6 • Corporate Strategy 7 • Road Map 8 • Contacts 9 • Plant and Development Options 10 • Adelong Goldfield Overview 11 • Challenger Gold Project 12 • Currajong Gold Project 13 • Additional Adelong Projects 14 • Donkey Hill

  4. Slide 4: Investment Highlights

    Investment Highlights Targeting Near Term Gold Production Adelong Goldfield Existing JORC Significant Resource Permitted with Near Term Production (NSW) Projects Resource1 Potential Processing Options Target  Projects in Adelong  Challenger Gold  36,000m of historical  Mining permit in place  S

  5. Slide 5: Corporate

    Corporate Board of Directors Advisors and Consultants Shareholders Ian Hastings Peter Mitchell John Chegwidden 3D Resources has started to build a team of technical people that have key experience in the Adelong Project and have the capacity to assist Significant shareholder support from the top 20

  6. Slide 6: Projects Overview

    Projects Overview Adelong Goldfield Historically the Adelong goldfield has produced around 800k ozs of gold. Many of the hard rock mines recorded very high grades averaging in excess of one ounce of gold per ton of ore. Development Stage Challenger Gold Project Currajong Gold Project  Near term dev

  7. Slide 7: Corporate Strategy

    Corporate Strategy Strategic Historical Resource Drilling Site Plan Logging and review of extensive historic exploration data Deliver Resource upgrade Commence High impact drilling program Optimise Existing Plant and Site Equipment Maximising Value Strategic plan focused on near term cash flow optio

  8. Slide 8: Road Map

    Road Map Continue Evaluation Work Scoping Study Underway Finalising Government Adelong Goldfield Preliminary Resource Re-assessment Government Approvals Approvals and Plans for Acquisition Agreement Commence Drilling at Exploration Continues Continued Exploration Operations Proceeding Currajong and

  9. Slide 9: 3dresources.com.au

    Peter Mitchell Ian Hastings Mark Flynn Managing Director Chairman Investor Relations +61 400 880 309 +61 408 581 022 +61 416 068 733 peter.mitchell@3dresources.com.au ian@tomiknominees.com.au mark.flynn@3dresources.com.au 3dresources.com.au Released with the authority of the board - 9th July 2020

  10. Slide 10: Plant and Development Options

    Plant and Development Options Ability To Produce Gold Onsite  The acquisition included all the plant and equipment from the past operation. Plant  Currently the plant is designed to produce a gravity concentrate and a flotation concentrate that can be cyanided.  Various studies have shown the pla

  11. Slide 11: Adelong Goldfield – Overview

    Adelong Goldfield– Overview Historical High-Grade Production of Around 800k ozs  Adelong Goldfield forms part of a much larger structural feature known as the Gilmore Suture. This major fault zone can be traced for several hundred kilometres and is associated with a number of significant gold depos

  12. Slide 12: Challenger Gold Project

    Challenger Gold Project Near Term Development Option  Two separate parallel veins were mined in the past with average grades mined estimated to be 87g/t Au (2.8oz of gold per ton). Between these two shear hosted veins is a breccia zone that is up to 15metres wide that represents resources to be min

  13. Slide 13: Currajong Gold Project

    Currajong Gold Project Large Scale Open Cut Potential  The Currajong Mine has largely worked the “Main reef” but drilling and records show that there are a series of vein deposits with the main vein up to 17m wide and formed by brecciated silicified rock  Some pockets of very high grade ores were

  14. Slide 14: Additional Adelong Goldfield Projects

    Additional Adelong Goldfield Projects Exploration for Additional Inferred Resources1 With some additional drilling 3D Resources also believes that it can quickly generate additional Inferred Resources for Donkey Hill, Gibraltar, Sawpit and some of the parallel structures to Currajong that are curren