Belararox Ltd. · ASX:BRX

Belararox — Investor Presentation (October 2023)

20 slides from Belararox's investor presentation, Oct 17, 2023

  1. Slide 1: South-West Connect ASX Showcase: Exploring large copper porphyry in Andeans

    SOUTH-WEST CONNECT ASX SHOWCASE Exploring large copper October 2023 porphyry in Andeans E x p l o r a t i o n Ta r g e t i n g R e n e w a b l e s a n d B a t t e r y M i n e r a l s

  2. Slide 2: Important Legal Information

    Important Legal Information Belararox Limited (”The Company”) does not purport to give financial or investment advice. No account has been taken Competent Person Statement of the objectives, financial situation or needs of any recipient of this document. Recipients of this document should carefully

  3. Slide 3: Investment Highlights

    Investment Highlights x Mineral explorer focused on battery and renewable energy markets. x Targeting Copper, Zinc, Gold, Silver, Lithium, Nickel and Lead resources. x 100% interests in all tenements. x TMT Project – San Juan Argentina. x Land package of >32,000 ha within the most mineralised range

  4. Slide 4: Board of Directors and Capital Structure

    Board of Directors and Capital Structure CAPITAL STRUCTURE Share Price* A$0.48 52 Week Range 0.16 – 0.635 Mr Neil Warburton Mr Arvind Misra Non-Executive Chairman Managing Director Shares on Issue 67,944,020 Options expiring 6 June 2024 (95c exercise price 40,390,059 ASX:BRXO) Options expiring 13 Ju

  5. Slide 5: The Right Place – The Land of Copper Giants

    The Right Place – The Land of Copper Giants ANDEAN RANGE – GEOLOGICAL POTENTIAL The Andean range is the most Cu-productive range in the world. El Indio and Maricunga metallogenic belts host renowned mines and deposits such as El Indio, Veladero, Pascua Lama, Caserones, Marte, Lobo, etc. 6 new porphy

  6. Slide 6: TMT Study Area – ASTER and Sentinel-2 Spectral Processed Data

    TMT Study Area – ASTER and Sentinel-2 Spectral Processed Data INITIAL RESULTS OF DESKTOP STUDIES CONFIRM THE HIGH POTENTIAL OF THE MULTIPLE TARGETS AT TMT PROJECT The analysis of multiband satellite images has outlined sectors where zones with evident hydrothermal alteration are coincident with stru

  7. Slide 7: Mineralisation – Toro Project

    Mineralisation – Toro Project Zn TMT PROJECT MINERALIZATION, GEOLOGY, AND SURFACE SAMPLE RESULTS Mineralisation style is veins, stockworks and disseminated. With high Zn values in surface samples. TORO TARGET Zinc values geochemistry model (Zangrandi 1998). High grades not only observed in surface s

  8. Slide 8: TMT Project – Remote Sensing Interpreted Hydrothermal Alteration Targets

    TMT Project – Remote Sensing Interpreted Hydrothermal Alteration Targets TARGET RANKING By Dr. Steve Garwin The study made by Dr. Garwin has defined at least 11 targets in TMT Project. These targets have been ranked as follows: • A-class targets are of higher priority than B-class targets. • Within

  9. Slide 9: Toro Target - Drilling

    Toro Target - Drilling INTERPRETED CROSS SECTION IN TORO TARGET DRILLING A total of 22 holes were drilled at the Toro target: 8 DD and 14 RC. BEST INTERCEPTIONS • T1-D: 60m @ 2.4% Zn from 114m • T1-R: 29m @ 1.7% Zn from 17m • T5-R: 75m @ 0.7% Zn from 69m • T5-R: 32m @ 1.4% Zn from 19m • T5-R: 6m @ 6

  10. Slide 10: Peer Comparison

    Peer Comparison COMPARISON TAMBO SOUTH AREA – FILO DEL SOL HYDROTHERMAL ALTERATION Dr Steve Garwin has interpreted the processed ASTER data and processed SENTINEL 2 data to have characteristics of hydrothermal alteration features, that are typically associated with high sulphidation epithermal and p

  11. Slide 11: Summary – TMT Projects

    Summary – TMT Projects HUGE POTENTIAL FOR PORPHYRY- CONFIRMED Zn MINERALIZATION Cu-Au EPITHERMAL DEPOSITS Confirmed zinc mineralization 1 Remains open in all directions Best possible location 1 • Extensive land package of TMT project (32,380 has) in Valle del Cura district, in San Juan province - on

  12. Slide 12: Australian Project (Belara, NSW)

    Australian Project (Belara, NSW) • 100% owned, A 643 km2 tenement package. Competent Person Statement • Inferred Resources of 5.0 million tonnes (Mt) at 3.41% Mr Chris Blaser is a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and a Member of the Aus

  13. Slide 13: Belara Long Section – Open Mineralisation

    Belara Long Section – Open Mineralisation Significant drill results include: • 7.0m @ 2.22% Zn, 2.54% Cu (from 78.0m in BLRC013), including 3.0m @ 4.73% Zn, 5.85% Cu (from 78.0m) • 5.0m @ 6.80% Zn, 1.19% Cu (from 51.0m in BLDD028) • 4.0m @ 1.46% Zn, 0.70% Cu (from 67.0m in BLRC015) • 10.0m @ 3.80% Z

  14. Slide 14: Native Bee Long Section – Open Mineralisation

    Native Bee Long Section – Open Mineralisation Significant drill results include: • The mineralised intersection in NBDD007 is the best to date at Native Bee: • 6.0m at 4.00% Zn, 0.27% Cu, 1.15% Pb, 33.70g/t Ag and 0.37g/t Au from 151.0m, • including 3.0m at 7.57% Zn, 0.06% Cu, 2.11% Pb, 58.27g/t Ag

  15. Slide 15: Belara Regional Exploration

    Belara Regional Exploration • Regional Exploration at Licences (EL9538 and EL9523) progressing targeting includes field mapping and ground truthing of historical workings (shafts, pits and drill holes) along high-priority targets such as the Ben Buckley structural trend. • Four additional targets wi

  16. Slide 16: Bullabulling – Lithium Prospectivity Identified

    Bullabulling – Lithium Prospectivity Identified • A 48.8km2 land package capturing favourable lithology • Several new potential Lithium-Caesium-Tantalum (“LCT”) pegmatite targets identified in recently acquired drone aerial imagery. • The new targets are considered prospective for lithium from pegma

  17. Slide 17: Bullabulling – Nearby Exploration Success

    Bullabulling – Nearby Exploration Success 11.5km to the east of Belararox’s eastern tenement boundary, Future Battery Less than 1.1 km west of Belararox’s western tenement boundary, BMG Resources Minerals (ASX:FBM) announced it had intercepted 29m @ 1.36% Li2O from (ASX:BMG) announced RC Drilling in

  18. Slide 18: Key Deliverables

    Key Deliverables Timelines Oct-Dec 23 QUARTER Jan-Mar 24 QUARTER April – June QUARTER June - September QUARTER Access and infrastructure, land Surface exploration including Completion of phase 1 drilling, access agreements, surface mapping, rock chips geophysics preliminary review of assays, Plannin

  19. Slide 19: Summary

    Summary Field exploration at TMT to commence in October 2023. Exploration Director relocating to Argentina permanently. Exploration Director investing $1m and relocating to Argentina. Preliminary work has identified 11 significant HS + Porphyry targets at TMT project Argentina. Bullabulling field re

  20. Slide 20: TMT Project – A Pathway to Success

    Belararox Limited (ASX:BRX) Investor Presentation Arvind Misra Managing Director arvind.misra@belararox.com.au The Capital Network Julia Maguire 02 8999 3699 julia@thecapitalnetwork.com.au www.belararox.com.au T M T P RO J EC T – A PAT H WAY TO S U C C ES S 20

Belararox — Investor Presentation (October 2023) on 6ix