Metallium Limited · ASX:MTM

Metallium — Shareholder Meeting (November 2025)

19 slides from Metallium's shareholder meeting presentation, Nov 28, 2025

  1. Slide 1: 2025 AGM Presentation

    Metallium Ltd (ACN 645 885 463) ASX: MTM | OTCQX: MTMCF Australia: Perth, Western Australia USA: Houston, Texas ASX Release 28 November 2025 2025 AGM Presentation Metallium Limited (“Metallium” or the “Company”) (ASX: MTM; OTCQX: MTMCF) is pleased to provide a copy of the Managing Director’s present

  2. Slide 2: Revolutionary Metal Recovery Technology

    REVOLUTIONARY METAL RECOVERY TECHNOLOGY Transforming waste streams and mineral ores into high-value products via breakthrough technology AGM PRESENTATION 28 November 2025 Metallium Ltd ASX: MTM / OTCQX: MTMCF

  3. Slide 3: Disclaimers

    Disclaimers This presentation has been prepared by Metallium Ltd (ACN 645 885 463) (“Metallium”, “MTM’ or “Company”) for the exclusive The figures, valuations, forecasts, estimates, opinions and projections contained herein involve elements of subjective judgment and use of the party to whom Metalli

  4. Slide 4: Metallium: A Global Metals Extraction Technology Company

    METALLIUM: A GLOBAL METALS EXTRACTION TECHNOLOGY COMPANY ✓ Metallium has undergone a major transformation over the past 12 months. The company is now a global industrial technology platform with a first operating hub in the United States and a clear pathway to replicate nationally, and international

  5. Slide 5: FY2025 – A Breakthrough Year for Technology and Commercialisation

    FY2025 – A BREAKTHROUGH YEAR FOR TECHNOLOGY AND COMMERCIALISATION Strategic Commercial Agreements 1 Feedstock agreement with Glencore Recycling (N. America) Additional partnerships with Indium Corporation, Ucore and multiple U.S. recyclers 2 Technology Validation Milestones ~20× upgrade of raw Harts

  6. Slide 6: Metallium at a Glance

    METALLIUM AT A GLANCE “Best-in-Class” Metal Recovery, Low Impact, Globally Deployable, Commercially Disruptive Business Models Build-Own-Operate (BOO) Processing-as-a-Service (PaaS) Urban Mining / Recycling Mineral Processing (MP) Build–Own–Operate model for e-waste and e-scrap processing. High- Lic

  7. Slide 7: The Global Critical Metals Problem

    THE GLOBAL CRITICAL METALS PROBLEM The Western World Is Entering a Critical-Metals Crunch Major Metal Repositories Far Higher in Grade vs. Typical Mineral Orebody E-waste is the world’s fastest-growing waste stream, rising at double-digit rates and containing vast quantities of precious & strategic

  8. Slide 8: Introduction to Flash Joule Heating

    INTRODUCTION TO FLASH JOULE HEATING Metallium's Core Technology – Rapid Thermal Liberation for Metal Recovery Ultrafast Heating: We apply a short burst of electric energy to crushed ore or Metal Recovered waste. The feed heats in very short timeframes. FJH Bearing Metal Process Feedstock Products Pr

  9. Slide 9: Why FJH Is Breakthrough

    WHY FJH IS BREAKTHROUGH Technology Built for 21st-Century Metal Supply Chains Feed Versatility Low Capital Intensity • PCBs, server boards, telecom equipment • Modular units with <<< lower upfront investment vs alternatives • Semiconductor manufacturing waste and Ga/Ge scrap • Standardised design en

  10. Slide 10: Our Business Model: Two Engines of Value

    OUR BUSINESS MODEL: TWO ENGINES OF VALUE URBAN MINING (WASTE RECYCLING) MINERAL PROCESSING (MINING PROJECTS) Technology Metals: Electronic Waste: Rare Earth Elements Red Mud (REEs) (Bauxite Residue) Gallium, Germanium, Gold, Copper, PGE -rich Indium, Tin, Antimony Printed Circuit Boards Nd, Pr, Dy,

  11. Slide 11: Dual Business Model: Maximum Market Capture

    DUAL BUSINESS MODEL: MAXIMUM MARKET CAPTURE Urban Mining / Recycling Mineral Processing Build–Own–Operate Model for High-Value Scrap Licensing & Joint Ventures for Critical Metals Capture Mine Site FJH value Feed FJH Metal Revenue source of Metal Processing through Acquisition Processing Recovery Ge

  12. Slide 12: Strategic Partnership with Indium Corporation - Update

    STRATEGIC PARTNERSHIP WITH INDIUM CORPORATION - UPDATE Indium Corporation – a private New York-based company – is a global leader in specialty metal refining, particularly for gallium, germanium, and indium used in semiconductors. ✓ Technical program progressing well: processing Ga/Ge scrap continue

  13. Slide 13: Strategic Partnerships with E-Waste Feedstock Suppliers - Update

    STRATEGIC PARTNERSHIPS WITH E-WASTE FEEDSTOCK SUPPLIERS - UPDATE Metallium is building a multi-supplier network for high-value PCB e-waste, partnering with major recyclers ✓ GLENCORE RECYCLING: Global leader in metals recycling with extensive U.S. operations and globally ✓ DYNAMIC LIFECYCLE INNOVATI

  14. Slide 14: Three Global Aspirations for Market Leadership

    THREE GLOBAL ASPIRATIONS FOR MARKET LEADERSHIP – PILLAR  – – PILLAR  – – PILLAR  – E-WASTE RARE EARTHS / CRITICAL MINERALS GALLIUM / GERMANIUM Benchmark for E-Waste & Tech- Go-To Tech for REE and other Global Platform for Strategic Metal Recycling Critical Metal Ores & Tailings Semiconductor M

  15. Slide 15: Vision 2030: A Global Network of FJH Units

    VISION 2030: A GLOBAL NETWORK OF FJH UNITS Metallium’s ambition is to expand toward a global network of recovery plants targeting precious, strategic and rare-earth metals from the world's fastest-growing waste streams and most challenging mineral feedstocks. The Platform Is Designed to Be Deployed

  16. Slide 16: Global Aspirations and Scaling Roadmap - Ewaste

    GLOBAL ASPIRATIONS AND SCALING ROADMAP - EWASTE 2027 2030 2030 16k 50k+ <1% Tonnes Per Year Tonnes Per Year Market Penetration Stage-2 inbound PCB processing capacity at Gator Point, TX Target annual production globally by 2030 across e-Waste Of global PCB waste market needed to achieve 2030 targets

  17. Slide 17: The Next 12 Months – Commercialisation & Expansion Plans

    THE NEXT 12 MONTHS – COMMERCIALISATION & EXPANSION PLANS 01 02 U.S. Stage-1 Commissioning & Nameplate Operation Feedstock Contracts Commissioning and ramp-up of U.S. commercial facility in Texas to nameplate capacity, with Execution of additional North American feedstock contracts with recyclers and

  18. Slide 18: Low Emissions & Environmental Impact

    LOW EMISSIONS & ENVIRONMENTAL IMPACT ESG and Permitting Advantages SmCo Magnets Case Study: Comparison of FJH & Hydrometallurgy Hydromet plus remote mining Hydromet FJH FJH avoids large waste ponds, avoids acid or cyanide Energy consumption per Sm yield per tonne of Co tonne of Sm recovery tonnes ci

  19. Slide 19: The Future of Metals Recovery – Contact us

    The Future of Metals Recovery – Contact us to learn more or for partnership discussions Michael Walshe Managing Director & Chief Executive Officer Metallium Ltd Stock Exchange Investor and Announcement Engagement Metallium Ltd ASX Unit 4, 22 Railway Road, Subiaco, Western Australia 6008 Phone +61 (0

Metallium — Shareholder Meeting (November 2025) on 6ix