  1. Slide 1: Independence Group: Growing a Great Australian Mining Company

    INDEPENDENCE GROUP GROWING A GREAT AUSTRALIAN MINING COMPANY May 2012 Investor Update Chris Bonwick – Managing Director 1

  2. Slide 2: Disclaimer

    Disclaimer Certain oral and written statements contained or incorporated by reference in this presentation, including information as to the future financial or operating performance of the Company and its projects, constitute forward-looking statements. All statement, other than statements of histor

  3. Slide 3: Independence Group Overview - Corporate

    Independence Group Overview - Corporate Capital Structure: ASX 200 Code : IGO 232.9M shares Market Cap. (30/04/2012) : A$1,004M Substantial shareholders: JCP : 12.8% (30 March 2012) Fidelity: 5.2% Australian Institutions: 65.0% Off Shore Institutions: 10.2% 57 Institutions in top 100 Financials: Cas

  4. Slide 4: Asset Pipeline and Organic Growth Profile

    Asset Pipeline and Organic Growth Profile Combination of low cost cash flows from current operating mines with significant long-life development projects and highly prospective exploration 4

  5. Slide 5: IGO March 2012 Qtr Highlights

    IGO March 2012 Qtr Highlights Long-life development projects and exploration upside Tropicana • On schedule for first gold pour Q4 CY13 • Significant upside potential to BFS pit design • Continued high-grade exploration results Long • Solid production performance exceeding budget guidance • Largest

  6. Slide 6: Mines, Development and Advanced Exploration Projects

    Independence Group NL – Mines, Development and Advanced Exploration Projects 6

  7. Slide 7: Diversified Metals Portfolio

    Independence Group NL Diversified Metals Portfolio Metal Attributable IGO Projects Resources* Gold 2.5 M ounces Au Tropicana (30%), Karlawinda, Bentley, Stockman (100%) Nickel 104,000 tonnes Ni Long (100%), Duketon (earning 70%) Copper 248,000 tonnes Cu Jaguar, Bentley, Stockman (100%) Zinc 1,086,00

  8. Slide 8: Tropicana JV Gold Production 2013

    Tropicana JV (IGO 30%, AGA 70% Manager) Gold Production 2013 PROJECT UNDER CONSTRUCTION - A New Australian Gold Province 36% Complete at March 2012 First Production estimated December Qtr 2013 Resources – IGO 30% Share – 1,900,000 oz Au Reserves – IGO 30% Share – 1,100,000 oz Au ……and growing Combin

  9. Slide 9: Tropicana JV Gold Production 2013

    Tropicana JV (IGO 30%, AGA 70% Manager) Gold Production 2013 PROJECT UNDER CONSTRUCTION Airstrip Primary Crusher CIL Area Mill Foundations 9

  10. Slide 10: Tropicana JV 2011 Resources & Reserves

    Tropicana JV (IGO 30%) 2011 Resources & Reserves 100% PROJECT – BFS Project Pit Design November 2010 BFS Reserve: 48Mt @ 2.2g/t Au = 3.4Moz (A$1,100/oz) Reference – IGO 11/11/10 ASX Release for Resource and Reserve Estimates 10

  11. Slide 11: Tropicana JV Upside Studies and Potential

    Tropicana JV (IGO 30%) Upside Studies and Potential November 2011 Mineral Resource: 88.3Mt @ 2.3g/t Au = 6.41Moz (A$1,400/oz) June 2011 Open Pit Reserve: 56.4Mt @ 2.2g/t Au = 3.91Moz (A$1,210/oz) Reference – AGA 27/7/11 and 29/11/11 ASX Releases for Resource and Reserve Estimates 11

  12. Slide 12: Tropicana JV Upside Potential to Mine Design

    Tropicana JV (IGO 30%) Upside Potential to Mine Design Potential Upside to BFS Pit Designs: • Inclusion of Boston Shaker pit • Underground operations at Havana, Tropicana and Boston Shaker • Joining of pits between Havana and Tropicana • Expanded Pit Shell New Exploration Results: • Havana Deeps: •

  13. Slide 13: Tropicana JV - Havana Open Pit and Underground Potential

    Tropicana JV (IGO 30%) - Havana Open Pit and Underground Potential Havana Deeps Underground Havana Potential Open Pit Resource Location Cut-back Reference – AGA 27/7/11 ASX Release for Reserve Estimate and IGO 29/11/11 ASX Release for Havana Deeps Underground Resource Estimate 13

  14. Slide 14: Boston Shaker and Swizzler Significant Intercepts

    Tropicana JV (IGO 30%) - Boston Shaker and Swizzler Significant Intercepts Proposed Boston Shaker, Tropicana and Havana Open Pit Outlines, g/t Au x Thickness (m) Contours, Significant Drill Intercepts and Location of the Swizzler and Swizzler Deeps Prospects Drill widths approximate true widths 14

  15. Slide 15: Tropicana JV Bankable Feasibility Study & June 2011 Reserve Update

    Tropicana JV – Bankable Feasibility Study & June 2011 Reserve Update (100% Project) BFS Open Pit Reserves: Tropicana, Havana, Havana South 48Mt at 2.2 g/t Au – 3.4M oz* *A$1,100 oz Au, A$106/bbl oil, 0.7 g/t Au fresh ore cut off) BFS LOM Production: 3.45Moz over 10 years (1.04M oz IGO 30%) Ave LOM A

  16. Slide 16: Tropicana JV Significant Discoveries To Date

    Tropicana JV (IGO 30%) Significant Discoveries To Date Numerous gold anomalies and potential for other gold discoveries Reference – AGA 27/7/11 and 29/11/11 ASX Releases for Resource and Reserve Estimates 16

  17. Slide 17: Tropicana JV Fly Through

    Tropicana JV (IGO 30%) Fly Through 17

  18. Slide 18: Jaguar / Bentley Production Guidance and Target

    Jaguar / Bentley Operation (IGO 100%) Production Guidance and Target 2011/12 Production Guidance Metal in concentrate: 7,500 - 8,500t Cu, 15,500 - 16,500t Zn, 0.4 – 0.5M oz Ag 2012/13 Production target Mining 600,000t ore: Jaguar – 120,000t, Bentley – 480,000t HMS feed: 300,000t producing ~150,000t

  19. Slide 19: Jaguar / Bentley Bentley Ore Body

    Jaguar / Bentley Operation (IGO 100%) Bentley Ore Body June 2011 Resource: 3.0M t @ 2.0% Cu, 9.8% Zn, 139g/t Ag, 0.7g/t Au June 2011 Reserve: 2.45M t @ 1.5% Cu, 8.6% Zn, 106g/t Ag, 0.5g/t Au Drill intercepts are quoted as down hole widths, and not true widths Reference – IGO 20/10/11 Annual Report A

  20. Slide 20: Jaguar and Far Side Deposits

    Jaguar / Bentley Operation (IGO 100%) Jaguar and Far Side Deposits Jaguar – Far Side Deposits cross-section Potential to increase reserves Far Side Deposit drill hole Cu grade longitudinal projection 20

  21. Slide 21: Jaguar/Bentley Exploration Model and Potential

    Jaguar/Bentley Operation (IGO 100%) Exploration Model and Potential Volcanic Massive Sulphide (VMS) Discovery History & Mineralisation Scale Bentley Resource Golden Grove Gossan Hill discovery history Outline ? ? ? 21

  22. Slide 22: Pumping Station VMS Prospect

    Jaguar / Bentley Operation (IGO 100%) Pumping Station VMS Prospect Under explored 50km long prospective Cu-Zn-Ag VMS corridor. Prospectivity around existing 3 mines. 8 Cu-Zn-Ag alteration anomalies under cover being tested systematically. 22

  23. Slide 23: Long Nickel Operation: Largest ever Ore Reserve and Resource

    Long Nickel Operation (IGO 100%) 2002 Purchase price = A$15M IGO Produced 80,609t Ni since acquisition Update Largest ever Ore Reserve (58,100t) and Resource (83,000t) supporting potential 5+ year mine life based on Reserves. New exploration success in new areas of Moran South, Moran East and Long N

  24. Slide 24: Long Nickel Quarterly Cash Costs and Revenue

    Long Nickel Operation (IGO 100%) Quarterly Cash Costs and Revenue History of high operating margins and consistent low cash costs Revenue A$/lb Ni (includes hedging) Payable Cash Costs A$/lb Ni 24

  25. Slide 25: Long Nickel Mine Geophysics - TEM Equipment

    Long Nickel Operation (IGO 100%) Mine Geophysics - TEM Equipment Innovative research and development High powered TEM Underground transmitter Down hole TEM **Exclusive to IGO** surveying • 10 x more powerful than current systems. • More accurate drill • Doubles search radius Down hole TEM probe targ

  26. Slide 26: Long Deposits and Targets - Longitudinal Projection

    Long Nickel Operation (IGO 100%) Deposits and Targets - Longitudinal Projection Largest Reserve since IGO reopened the mine (mine life extended to at least 2017) Reference – IGO 20/10/11 Annual Report ASX Release for Resource and Reserve Estimates 26 IGO ASX Release 30 April 2012 Quarterly Report

  27. Slide 27: Long Nickel Moran South Nickel Target

    Long Nickel Operation (IGO 100%) Moran South Nickel Target New zone of nickel sulphides intersected east of Moran More DHTEM conductors south-east of Moran Drilling in progress 27

  28. Slide 28: Long Nickel Operation Fly Through

    Long Nickel Operation (IGO 100%) Fly Through 28

  29. Slide 29: Karlawinda Gold Project Regional Location

    Karlawinda Gold Project (IGO 100%) Regional Location Large new gold system close to gas pipeline and existing Newman infrastructure 29

  30. Slide 30: Karlawinda Bibra Prospect Gram x Metre Contours

    Karlawinda Gold Project (IGO 100%) Bibra Prospect Gram x Metre Contours Reference – IGO 31/3/12 ASX Quarterly Report 30

  31. Slide 31: Karlawinda Bibra Prospect Cross-section

    Karlawinda Gold Project (IGO 100%) Bibra Prospect Cross-section Maiden Resource 219,900 oz Au B B’ Drill intercepts are quoted as down hole widths, and not true widths Reference – IGO 31/3/11 ASX Quarterly Report for Resource estimate 31

  32. Slide 32: Karlawinda Francopan Prospect Cross-section

    Karlawinda Gold Project (IGO 100%) Francopan Prospect Cross-section Very large gold system Drill intercepts are quoted as down hole widths, and not true widths 32

  33. Slide 33: Stockman Project

    Stockman Project (IGO 100%) Wilga and Currawong Cu-Zn-Ag Deposits discovered by WMC in 1978/9. June 2011 Total Indicated + Inferred Resources: 12.7M t @ 2.1% Cu, 4.4% Zn, 39g/t Ag, 1.0g/t Au Reference – IGO 20/10/11 Annual Report ASX Release for Resource Estimate Activities Update: • New Exploration

  34. Slide 34: Duketon JV Rosie Prospect Massive Nickel Sulphides

    Duketon JV (IGO earning 70%) Rosie Prospect Massive Nickel Sulphides Rosie Prospect massive nickel sulphides assaying: 5.2m @ 9.1% Ni, 1.1% Cu, 0.2% Co, 7.1g/t PGE’s (2.2g/t Pt, 1.7g/t Pd, 1.8g/t Ru & 0.8g/t Rh) Drill intercepts are quoted as down hole width, not true width 34

  35. Slide 35: Duketon JV Rosie Prospect Maiden Resource

    Duketon JV (IGO earning 70%) Rosie Prospect Maiden Resource Reference – IGO 25/1/12 ASX Release for Resource Estimate 35

  36. Slide 36: Project Generation: De Beers Database

    Project Generation De Beers Database (IGO 100%) No buy-back or royalties on future mineral discoveries Long term exploration asset to find new Australian mineral camps. 293,000 geochemical samples collected. IGO analysing samples for 57 elements including Ni, Cu, Pb, Zn, Au, Ag, Pt, Pd, Ur, rare ear

  37. Slide 37: De Beers Database

    De Beers Database (IGO 100%) IGO Team Preparing geochemical samples for analysis in sample storage shed IGO 2009 gold analysis of De Beers samples collected before the discovery of the Plutonic Gold Mine (WA) Potential of the 100% owned proprietary data base for identifying undiscovered deposits 37

  38. Slide 38: Asset Pipeline and Organic Growth Profile

    Asset Pipeline and Organic Growth Profile Combination of low cost cash flows from current operating mines with significant long-life development projects and highly prospective exploration Highly complementary management and technical capabilities, with proven successful track records of exploration

  39. Slide 39: Independence Group Contact Details

    Independence Group Contact Details Perth Office Managing Director – Chris Bonwick Suite 4, Level 5 South Shore Centre 85 South Perth Esplanade South Perth, Western Australia 6151 Postal: PO Box 496, South Perth Western Australia 6951 Telephone: +61 8 9238 8300 Facsimile: +61 8 9238 8399 Email: conta

  40. Slide 40: Appendix: Resource and Reserve Statements

    Independence Group NL APPENDIX RESOURCE and RESERVE STATEMENTS 40

  41. Slide 41: Long Nickel Mine June 2011 Resources and Reserves

    Long Nickel Mine (IGO 100%) June 2011 Resources and Reserves RESOURCES MINING RESERVE Undiluted at 1% Ni Cut-off 1, 2 as at 30 June 2011 as at 30 June 2011 Tonnes Ni % Ni Tonnes Tonnes Ni % Ni Tonnes LONG Measured 26,000 5.6 1,500 LONG Proven Indicated 210,000 4.8 10,100 Probable 127,000 3.0 3,800 I

  42. Slide 42: Tropicana JV Nov 2011 Resources and Jun 2011 Interim Reserves

    Tropicana JV (AGA 70% / IGO 30%) Nov 2011 Resources and Jun 2011 Interim Reserves November 2011 June 2011 Project Resources Project Reserves Tonnes Grade Contained Tonnes Grade Contained (Mt) (g/t) 1 Gold (Mt) (g/t) 3 Gold 2 4 (Moz) (Moz) Measured 28.2 2.1 1.95 Proved 25.8 2.3 1.90 Indicated 49.4 2.

  43. Slide 43: Jaguar/Bentley Project Mineral Resource – June 2011

    Jaguar/Bentley Project Mineral Resource – June 2011 2.0 - Reference – IGO 20/10/11 Annual Report ASX Release for Resource Estimates 43

  44. Slide 44: Jaguar/Bentley Project Reserve – June 2011

    Jaguar/Bentley Project Reserve– 30 June 2011 - Reference – IGO 20/10/11 Annual Report ASX Release for Reserve Estimates 44

  45. Slide 45: Stockman Resource Estimate – June 2011

    Stockman Resource Estimate – June 2011 Stockman Classification Tonnes Cu % Zn % Pb % Ag g/t Au g/t Currawong Indicated 9,130,000 2.0 4.2 0.8 42 1.2 Currawong Inferred 305,000 1.4 4.1 0.6 34 0.5 Total Indicated + Inferred 9,435,000 2.0 4.2 0.8 42 1.2 Wilga Indicated 2,368,000 2.1 5.5 0.5 32 0.5* Wilg

  46. Slide 46: Karlawinda Bibra Deposit Maiden Resource Dec 2011

    Karlawinda Gold Project – Bibra Deposit Maiden Resource Dec 2011 Tonnes Au Grade Contained Au Mineralisation Type (Mt) (g/t) (oz) Laterite 1.9 1.2 73,300 Upper Saprolite 0.8 1.1 28,300 Lower Saprolite 1.6 1.1 56,600 Sub-total Oxide Inferred 4.3 1.1 158,200 Transition Inferred 1.6 1.2 61,700 Grand To

  47. Slide 47: Duketon Nickel JV Maiden Resource Dec 2011

    Duketon Nickel JV– IGO Earning 70% Maiden Resource Dec 2011 Reference – IGO 25/01/2012 ASX Announcement for Resource Estimate 47

  48. Slide 48: Competent Person Statements

    Competent Person Statements Notes: The information in this summary presentation that relates to Exploration Results is based on information compiled by Mr Christopher M Bonwick who is a full-time employee of the Company and is a member of the Australasian Institute of Mining and Metallurgy. Mr Bonwi

  49. Slide 49: Independence Group: Growing a Great Australian Mining Company

    INDEPENDENCE GROUP GROWING A GREAT AUSTRALIAN MINING COMPANY May 2012 Investor Update Chris Bonwick – Managing Director 1

  50. Slide 50: Disclaimer

    Disclaimer Certain oral and written statements contained or incorporated by reference in this presentation, including information as to the future financial or operating performance of the Company and its projects, constitute forward-looking statements. All statement, other than statements of histor

  51. Slide 51: Independence Group Overview - Corporate

    Independence Group Overview - Corporate Capital Structure: ASX 200 Code : IGO 232.9M shares Market Cap. (30/04/2012) : A$1,004M Substantial shareholders: JCP : 12.8% (30 March 2012) Fidelity: 5.2% Australian Institutions: 65.0% Off Shore Institutions: 10.2% 57 Institutions in top 100 Financials: Cas

  52. Slide 52: Asset Pipeline and Organic Growth Profile

    Asset Pipeline and Organic Growth Profile Combination of low cost cash flows from current operating mines with significant long-life development projects and highly prospective exploration 4

  53. Slide 53: IGO March 2012 Qtr Highlights

    IGO March 2012 Qtr Highlights Long-life development projects and exploration upside Tropicana • On schedule for first gold pour Q4 CY13 • Significant upside potential to BFS pit design • Continued high-grade exploration results Long • Solid production performance exceeding budget guidance • Largest

  54. Slide 54: Mines, Development and Advanced Exploration Projects

    Independence Group NL – Mines, Development and Advanced Exploration Projects 6

  55. Slide 55: Diversified Metals Portfolio

    Independence Group NL Diversified Metals Portfolio Metal Attributable IGO Projects Resources* Gold 2.5 M ounces Au Tropicana (30%), Karlawinda, Bentley, Stockman (100%) Nickel 104,000 tonnes Ni Long (100%), Duketon (earning 70%) Copper 248,000 tonnes Cu Jaguar, Bentley, Stockman (100%) Zinc 1,086,00

  56. Slide 56: Tropicana JV Gold Production 2013

    Tropicana JV (IGO 30%, AGA 70% Manager) Gold Production 2013 PROJECT UNDER CONSTRUCTION - A New Australian Gold Province 36% Complete at March 2012 First Production estimated December Qtr 2013 Resources – IGO 30% Share – 1,900,000 oz Au Reserves – IGO 30% Share – 1,100,000 oz Au ……and growing Combin

  57. Slide 57: Tropicana JV Gold Production 2013

    Tropicana JV (IGO 30%, AGA 70% Manager) Gold Production 2013 PROJECT UNDER CONSTRUCTION Airstrip Primary Crusher CIL Area Mill Foundations 9

  58. Slide 58: Tropicana JV 2011 Resources & Reserves

    Tropicana JV (IGO 30%) 2011 Resources & Reserves 100% PROJECT – BFS Project Pit Design November 2010 BFS Reserve: 48Mt @ 2.2g/t Au = 3.4Moz (A$1,100/oz) Reference – IGO 11/11/10 ASX Release for Resource and Reserve Estimates 10

  59. Slide 59: Tropicana JV Upside Studies and Potential

    Tropicana JV (IGO 30%) Upside Studies and Potential November 2011 Mineral Resource: 88.3Mt @ 2.3g/t Au = 6.41Moz (A$1,400/oz) June 2011 Open Pit Reserve: 56.4Mt @ 2.2g/t Au = 3.91Moz (A$1,210/oz) Reference – AGA 27/7/11 and 29/11/11 ASX Releases for Resource and Reserve Estimates 11

  60. Slide 60: Tropicana JV Upside Potential to Mine Design

    Tropicana JV (IGO 30%) Upside Potential to Mine Design Potential Upside to BFS Pit Designs: • Inclusion of Boston Shaker pit • Underground operations at Havana, Tropicana and Boston Shaker • Joining of pits between Havana and Tropicana • Expanded Pit Shell New Exploration Results: • Havana Deeps: •

  61. Slide 61: Tropicana JV - Havana Open Pit and Underground Potential

    Tropicana JV (IGO 30%) - Havana Open Pit and Underground Potential Havana Deeps Underground Havana Potential Open Pit Resource Location Cut-back Reference – AGA 27/7/11 ASX Release for Reserve Estimate and IGO 29/11/11 ASX Release for Havana Deeps Underground Resource Estimate 13

  62. Slide 62: Boston Shaker and Swizzler Significant Intercepts

    Tropicana JV (IGO 30%) - Boston Shaker and Swizzler Significant Intercepts Proposed Boston Shaker, Tropicana and Havana Open Pit Outlines, g/t Au x Thickness (m) Contours, Significant Drill Intercepts and Location of the Swizzler and Swizzler Deeps Prospects Drill widths approximate true widths 14

  63. Slide 63: Tropicana JV Bankable Feasibility Study & June 2011 Reserve Update

    Tropicana JV – Bankable Feasibility Study & June 2011 Reserve Update (100% Project) BFS Open Pit Reserves: Tropicana, Havana, Havana South 48Mt at 2.2 g/t Au – 3.4M oz* *A$1,100 oz Au, A$106/bbl oil, 0.7 g/t Au fresh ore cut off) BFS LOM Production: 3.45Moz over 10 years (1.04M oz IGO 30%) Ave LOM A

  64. Slide 64: Tropicana JV Significant Discoveries To Date

    Tropicana JV (IGO 30%) Significant Discoveries To Date Numerous gold anomalies and potential for other gold discoveries Reference – AGA 27/7/11 and 29/11/11 ASX Releases for Resource and Reserve Estimates 16

  65. Slide 65: Tropicana JV Fly Through

    Tropicana JV (IGO 30%) Fly Through 17

  66. Slide 66: Jaguar / Bentley Production Guidance and Target

    Jaguar / Bentley Operation (IGO 100%) Production Guidance and Target 2011/12 Production Guidance Metal in concentrate: 7,500 - 8,500t Cu, 15,500 - 16,500t Zn, 0.4 – 0.5M oz Ag 2012/13 Production target Mining 600,000t ore: Jaguar – 120,000t, Bentley – 480,000t HMS feed: 300,000t producing ~150,000t

  67. Slide 67: Jaguar / Bentley Bentley Ore Body

    Jaguar / Bentley Operation (IGO 100%) Bentley Ore Body June 2011 Resource: 3.0M t @ 2.0% Cu, 9.8% Zn, 139g/t Ag, 0.7g/t Au June 2011 Reserve: 2.45M t @ 1.5% Cu, 8.6% Zn, 106g/t Ag, 0.5g/t Au Drill intercepts are quoted as down hole widths, and not true widths Reference – IGO 20/10/11 Annual Report A

  68. Slide 68: Jaguar and Far Side Deposits

    Jaguar / Bentley Operation (IGO 100%) Jaguar and Far Side Deposits Jaguar – Far Side Deposits cross-section Potential to increase reserves Far Side Deposit drill hole Cu grade longitudinal projection 20

  69. Slide 69: Jaguar/Bentley Exploration Model and Potential

    Jaguar/Bentley Operation (IGO 100%) Exploration Model and Potential Volcanic Massive Sulphide (VMS) Discovery History & Mineralisation Scale Bentley Resource Golden Grove Gossan Hill discovery history Outline ? ? ? 21

  70. Slide 70: Pumping Station VMS Prospect

    Jaguar / Bentley Operation (IGO 100%) Pumping Station VMS Prospect Under explored 50km long prospective Cu-Zn-Ag VMS corridor. Prospectivity around existing 3 mines. 8 Cu-Zn-Ag alteration anomalies under cover being tested systematically. 22

  71. Slide 71: Long Nickel Operation: Largest ever Ore Reserve and Resource

    Long Nickel Operation (IGO 100%) 2002 Purchase price = A$15M IGO Produced 80,609t Ni since acquisition Update Largest ever Ore Reserve (58,100t) and Resource (83,000t) supporting potential 5+ year mine life based on Reserves. New exploration success in new areas of Moran South, Moran East and Long N

  72. Slide 72: Long Nickel Quarterly Cash Costs and Revenue

    Long Nickel Operation (IGO 100%) Quarterly Cash Costs and Revenue History of high operating margins and consistent low cash costs Revenue A$/lb Ni (includes hedging) Payable Cash Costs A$/lb Ni 24

  73. Slide 73: Long Nickel Mine Geophysics - TEM Equipment

    Long Nickel Operation (IGO 100%) Mine Geophysics - TEM Equipment Innovative research and development High powered TEM Underground transmitter Down hole TEM **Exclusive to IGO** surveying • 10 x more powerful than current systems. • More accurate drill • Doubles search radius Down hole TEM probe targ

  74. Slide 74: Long Deposits and Targets - Longitudinal Projection

    Long Nickel Operation (IGO 100%) Deposits and Targets - Longitudinal Projection Largest Reserve since IGO reopened the mine (mine life extended to at least 2017) Reference – IGO 20/10/11 Annual Report ASX Release for Resource and Reserve Estimates 26 IGO ASX Release 30 April 2012 Quarterly Report

  75. Slide 75: Long Nickel Moran South Nickel Target

    Long Nickel Operation (IGO 100%) Moran South Nickel Target New zone of nickel sulphides intersected east of Moran More DHTEM conductors south-east of Moran Drilling in progress 27

  76. Slide 76: Long Nickel Operation Fly Through

    Long Nickel Operation (IGO 100%) Fly Through 28

  77. Slide 77: Karlawinda Gold Project Regional Location

    Karlawinda Gold Project (IGO 100%) Regional Location Large new gold system close to gas pipeline and existing Newman infrastructure 29

  78. Slide 78: Karlawinda Bibra Prospect Gram x Metre Contours

    Karlawinda Gold Project (IGO 100%) Bibra Prospect Gram x Metre Contours Reference – IGO 31/3/12 ASX Quarterly Report 30

  79. Slide 79: Karlawinda Bibra Prospect Cross-section

    Karlawinda Gold Project (IGO 100%) Bibra Prospect Cross-section Maiden Resource 219,900 oz Au B B’ Drill intercepts are quoted as down hole widths, and not true widths Reference – IGO 31/3/11 ASX Quarterly Report for Resource estimate 31

  80. Slide 80: Karlawinda Francopan Prospect Cross-section

    Karlawinda Gold Project (IGO 100%) Francopan Prospect Cross-section Very large gold system Drill intercepts are quoted as down hole widths, and not true widths 32

  81. Slide 81: Stockman Project

    Stockman Project (IGO 100%) Wilga and Currawong Cu-Zn-Ag Deposits discovered by WMC in 1978/9. June 2011 Total Indicated + Inferred Resources: 12.7M t @ 2.1% Cu, 4.4% Zn, 39g/t Ag, 1.0g/t Au Reference – IGO 20/10/11 Annual Report ASX Release for Resource Estimate Activities Update: • New Exploration

  82. Slide 82: Duketon JV Rosie Prospect Massive Nickel Sulphides

    Duketon JV (IGO earning 70%) Rosie Prospect Massive Nickel Sulphides Rosie Prospect massive nickel sulphides assaying: 5.2m @ 9.1% Ni, 1.1% Cu, 0.2% Co, 7.1g/t PGE’s (2.2g/t Pt, 1.7g/t Pd, 1.8g/t Ru & 0.8g/t Rh) Drill intercepts are quoted as down hole width, not true width 34

  83. Slide 83: Duketon JV Rosie Prospect Maiden Resource

    Duketon JV (IGO earning 70%) Rosie Prospect Maiden Resource Reference – IGO 25/1/12 ASX Release for Resource Estimate 35

  84. Slide 84: Project Generation: De Beers Database

    Project Generation De Beers Database (IGO 100%) No buy-back or royalties on future mineral discoveries Long term exploration asset to find new Australian mineral camps. 293,000 geochemical samples collected. IGO analysing samples for 57 elements including Ni, Cu, Pb, Zn, Au, Ag, Pt, Pd, Ur, rare ear

  85. Slide 85: De Beers Database

    De Beers Database (IGO 100%) IGO Team Preparing geochemical samples for analysis in sample storage shed IGO 2009 gold analysis of De Beers samples collected before the discovery of the Plutonic Gold Mine (WA) Potential of the 100% owned proprietary data base for identifying undiscovered deposits 37

  86. Slide 86: Asset Pipeline and Organic Growth Profile

    Asset Pipeline and Organic Growth Profile Combination of low cost cash flows from current operating mines with significant long-life development projects and highly prospective exploration Highly complementary management and technical capabilities, with proven successful track records of exploration

  87. Slide 87: Independence Group Contact Details

    Independence Group Contact Details Perth Office Managing Director – Chris Bonwick Suite 4, Level 5 South Shore Centre 85 South Perth Esplanade South Perth, Western Australia 6151 Postal: PO Box 496, South Perth Western Australia 6951 Telephone: +61 8 9238 8300 Facsimile: +61 8 9238 8399 Email: conta

  88. Slide 88: Appendix: Resource and Reserve Statements

    Independence Group NL APPENDIX RESOURCE and RESERVE STATEMENTS 40

  89. Slide 89: Long Nickel Mine June 2011 Resources and Reserves

    Long Nickel Mine (IGO 100%) June 2011 Resources and Reserves RESOURCES MINING RESERVE Undiluted at 1% Ni Cut-off 1, 2 as at 30 June 2011 as at 30 June 2011 Tonnes Ni % Ni Tonnes Tonnes Ni % Ni Tonnes LONG Measured 26,000 5.6 1,500 LONG Proven Indicated 210,000 4.8 10,100 Probable 127,000 3.0 3,800 I

  90. Slide 90: Tropicana JV Nov 2011 Resources and Jun 2011 Interim Reserves

    Tropicana JV (AGA 70% / IGO 30%) Nov 2011 Resources and Jun 2011 Interim Reserves November 2011 June 2011 Project Resources Project Reserves Tonnes Grade Contained Tonnes Grade Contained (Mt) (g/t) 1 Gold (Mt) (g/t) 3 Gold 2 4 (Moz) (Moz) Measured 28.2 2.1 1.95 Proved 25.8 2.3 1.90 Indicated 49.4 2.

  91. Slide 91: Jaguar/Bentley Project Mineral Resource – June 2011

    Jaguar/Bentley Project Mineral Resource – June 2011 2.0 - Reference – IGO 20/10/11 Annual Report ASX Release for Resource Estimates 43

  92. Slide 92: Jaguar/Bentley Project Reserve – June 2011

    Jaguar/Bentley Project Reserve– 30 June 2011 - Reference – IGO 20/10/11 Annual Report ASX Release for Reserve Estimates 44

  93. Slide 93: Stockman Resource Estimate – June 2011

    Stockman Resource Estimate – June 2011 Stockman Classification Tonnes Cu % Zn % Pb % Ag g/t Au g/t Currawong Indicated 9,130,000 2.0 4.2 0.8 42 1.2 Currawong Inferred 305,000 1.4 4.1 0.6 34 0.5 Total Indicated + Inferred 9,435,000 2.0 4.2 0.8 42 1.2 Wilga Indicated 2,368,000 2.1 5.5 0.5 32 0.5* Wilg

  94. Slide 94: Karlawinda Bibra Deposit Maiden Resource Dec 2011

    Karlawinda Gold Project – Bibra Deposit Maiden Resource Dec 2011 Tonnes Au Grade Contained Au Mineralisation Type (Mt) (g/t) (oz) Laterite 1.9 1.2 73,300 Upper Saprolite 0.8 1.1 28,300 Lower Saprolite 1.6 1.1 56,600 Sub-total Oxide Inferred 4.3 1.1 158,200 Transition Inferred 1.6 1.2 61,700 Grand To

  95. Slide 95: Duketon Nickel JV Maiden Resource Dec 2011

    Duketon Nickel JV– IGO Earning 70% Maiden Resource Dec 2011 Reference – IGO 25/01/2012 ASX Announcement for Resource Estimate 47

  96. Slide 96: Competent Person Statements

    Competent Person Statements Notes: The information in this summary presentation that relates to Exploration Results is based on information compiled by Mr Christopher M Bonwick who is a full-time employee of the Company and is a member of the Australasian Institute of Mining and Metallurgy. Mr Bonwi